kelii
Uploaded by
11 SLIDES
225 VIEWS
110LIKES

Distributed Adaptive Learning System (DALS): Dynamic Web-based Learning Environments

DESCRIPTION

The Distributed Adaptive Learning System (DALS) aims to create dynamic, web-based learning environments that adapt content to the needs of individual learners. Through systems like Learner Space and Knowledge Space, DALS optimizes learning by profiling learner characteristics, tailoring educational material to suit diverse learning styles and preferences. By utilizing technologies such as knowledge views and agency spaces, our approach ensures that learners can access desired knowledge asynchronously, anywhere on the network, providing a comprehensive and personalized learning experience.

1 / 11

Download Presentation

Distributed Adaptive Learning System (DALS): Dynamic Web-based Learning Environments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS551 Group Project Yugi Lee STB #555 (816) 235-5932 yugi@cstp.umkc.edu www.cstp.umkc.edu/~yugi CS551 - project 1

  2. Group Project: DALS (Distributed Adaptive Learning System) • to produce web-based learning environments that dynamically adapt the subject matter (knowledge) to the learner. • Achieving this goal will allow any desired knowledge field to be made accessible to any learner or learner community, asynchronously and optimized, at any place on the network. CS551 - project 1

  3. Group Project: DALS (Distributed Adaptive Learning System) CS551 - project 1

  4. DALS: Learner Space • Learner Space: the collection of Learner Filters which are profiles of characteristics that describe a Learner’s capacity to learn, • determine what data should be part of a Learner Filter, • show how to acquire, organize and update that data, and • identify what kinds of analyses are required to dynamically optimize the learning episode using the Learner Filter data. CS551 - project 1

  5. DALS: Learner Space • The Learner Space deals with variables that impact learning such as • past learning, • thinking style, • intelligence, achievement • aptitude, motivation • personality, • emotional state, satisfaction CS551 - project 1

  6. DALS: Knowledge Space • Knowledge Views have the capacity to assemble different views of knowledge in response to a Learner Filter. • The Knowledge Space addresses the collection, certification, organization, interrelationships, access, quality, evaluation, replacement, replication, migration and display/representation of knowledge, information and data. • Knowledge type: declarative, procedural and structural knowledge. • Knowledge views: Guided Learning, Discovery Learning, Game Learning CS551 - project 1

  7. DALS: Agency Space • Agency creates a transitory, network-resident learning environment that is optimized for each learning episode. • A Learning Episode is a specific instance of a Learner interacting with the DALS to acquire Knowledge. • Knowledge agent • learner agent • Decision maker agent CS551 - project 1

  8. DALS Architecture CS551 - project 1

  9. DALS: Processes • accepts a request for a learning episode from a Learner, • analyzes the data in the Learner Filter supplied with the request, • accesses the appropriate knowledge in the Knowledge Space, • creates a presentation environment for the Learner that is ‘optimized’ with respect to the Learner's Filter and the Knowledge Views, • presents and monitors the learning episode, • updates the Knowledge Space and the Learner Filter • closes the learning episode. CS551 - project 1

  10. DALS: Components • Learner Component • Group 1: learner model (learner assessment, monitoring, profile, filtering, etc) • Knowledge Components • Group 2: knowledge network • Group 3: game • Group 4: e-book (audio, text, transparency coordination) • Group 5: discovery environment (chatting room, campers, graphical tool, etc) CS551 - project 1

  11. DALS: Project Schedule • Feb 12: Project 1 (7%): Problem Statement and Technical Reviews • March 5: Project 2 (7%): Domain analysis & Specification of requirements • March 19: Project 3 (7%): Overall design • April 25: Project 4 (7%): System implementation and Documentation • May 2: Demonstration/Presentation (5%) • May 6: Final Research Paper (12%) CS551 - project 1