1 / 12

Computing for LHCb - Ital y

Computing for LHCb - Ital y. Domenico Galli, Umberto Marconi and Vincenzo Vagnoni. Genève , January 17, 2001. 2001 Farm for LHCb-Italy. Components (Motherboards, Racks, NAS, Switches). 2001 Funded Investments. 2001 Investments.

keiji
Download Presentation

Computing for LHCb - Ital y

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni Genève, January 17, 2001

  2. 2001 Farm for LHCb-Italy Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  3. Components (Motherboards, Racks, NAS, Switches) Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  4. 2001 Funded Investments Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  5. 2001 Investments • Availability of more funds, later in 2001, is conditional to: • The production of a believable computing model for 2001 (given the present WAN bandwidth). • The evidence of a high load of the installed CPUs. • The use of produced MC by Italian institutes for their own analyses. • All LHCb Italian groups are therefore invited to estimate their CPU need for MC production in 2001, in order to ask more funds. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  6. Preliminary Farm Tests Performed in Bologna • Network boot  • Boot-prom required (PXE?) • Swap-less operation  • Memory requirements for job execution nodes is stable • RAM errors  • Memtest86 and badram • NFS functionalities  • Kernel 2.2.18 required in order to allow broken setuid on NFS root • Network boot for Asus FX boards • Wake on network • In order to switch on and off boards from remote. • Electromagnetic interferences between neighbouring boards Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  7. Finale Computing Organization • MONARC hierarchy • Tier-0: CERN • Tier-1: Regional Centre (1 for each country). • Tier-2: Satellites of Tier-1 (mainly devoted to analysis). • Tier-3: Department Server (1 for each institute). • Tier-4: Desktop • Data formats • RAW, RAWmc • ESD, ESDmc: Event Summary Data; reconstruction output. • AOD: Analysis Object Data, public analysis format. • DPD: Derived Physics Data, private analysis format, ntuples. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  8. LHCb Differences With Respect to Other LHC Experiments • The first stage in the analysis (ESD  AOD, final state reconstruction) is performed in common for all the analyses that subsequently follow (more than one algorithm could have to be run on any single event, if that event satisfies more than one tag criterion). • The first stage in the analysis is therefore performed in production (Production Analysis) soon after data taking at CERN (real data) and in MC production centres (MC). • AOD (20 TB/a real data) are systematically distributed to all Tier-1 centres. ESD (100 TB/a real data) are kept in production centres. • Other LHC experiments export ESD. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  9. Final Tier-n Organization in Italy • ATLAS plan • Tier-1 stores ESD. Performs reprocessing and first analysis stage (AOD production). No MC production. • Tier-2s store AOD and perform MC production + analysis. • Tier-3s execute analysis • CMS plan • Tier-1 stores ESD and performs collaboration scheduled MC production + reprocessing • Tier-2++ (Legnaro) performs local requested MC production + reprocessing + analysis • Tier-2s/Tier-3s produce local requested MC production + analysis • Tier-2/Tier-3 difference is not functional Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  10. LHCb Computing Model • Tasks • MC production ( RAWmc,  ESDmc), production analysis (ESDmc AOD) and reprocessing, performed in Tier-1 (but also in Tier-3 dead time). • User analysis (AOD  DPD) performed in a collaboration between Tier-1 (selection) and Tier-3 (computation). • Interactive analysis of DPD performed in Tier-3 and Tier-4. • Storage • RAW and ESD stored only in the Tier-0 (CERN) (not distributed). • RAWmc and ESDmc stored only in the Tier-1 centre which produce them (not distributed). • AOD (from real data and all Tier-1 MC) stored in every Tier­1 (distributed). • DPD (ntuples) stored in Tier-3. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  11. LHCb Tier-n Tasks • Tier-1 • MC production ( RAWmc,  ESDmc) + production analysis ( AOD) + reprocessing. • User analysis ( DPD) in collaboration with Tier-3s. • Storage of RAWmc and ESDmc produced in the centre itself. • Storage of all the AOD (real data produced at CERN, MC data produced in all Tier-1 centres). • Tier-3s • User analysis ( DPD) in collaboration with Tier-1. • DPD storage. • Interactive analysis of DPD. • In dead time, MC production . • Tier-2s (not in the MONARC sense) • are large Tier-3, functionally equivalent to Tier-3. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

  12. 2007 LHCb Tier-n Organization in Italy • 1 Tier-1 centre: 140 kSI95, 110 TB disk. • 9 Tier-3 centres (Bologna, Cagliari, Ferrara, Firenze, Frascati, Genova, Milano, Roma1, Roma2): average 1 kSI95, 1 TB disk. • Tier-3 dimension can vary on the basis of group size and analysis activity. • Large Tier-3 centres could be named Tier-2, but not in the MONARC meaning. Computing for LHCb-Italy Domenico Galli, Umberto Marconi and Vincenzo Vagnoni

More Related