590 likes | 1.05k Views
University of Stavanger. Norway. Trondheim. Bergen. Stavanger. Ullandhaug Campus. University of Stavanger. 960 administration, faculty and service staff 7500 students 32 Bachelor’s programmes 23 Master’s programmes 7 PhD programmes University of Stavanger from 2005.
E N D
University of Stavanger Norway
Trondheim Bergen Stavanger
University of Stavanger • 960administration, faculty and service staff • 7500 students • 32 Bachelor’s programmes • 23 Master’s programmes • 7 PhD programmes • University of Stavanger from 2005
University of Stavanger 3 faculties: • Faculty of Arts and Education • Faculty of Science and Technology • Faculty of Social Sciences
Academic Personnel • Top Positions: 111(Full Professors 62, Senior Lecturer 3, Adjunct Professor 46 • Post Doctorates: 8 • Senior Academic Staff: 168 (Associate Professors 136, Senior Lectures 28, Associate (Adjunct) Professors 4) • Assistant Professors: 232 • Research Fellows: 60 • Other Scholarly Positions: 150(including 60 Research Fellows)
University of Stavanger • Externally funded activity approx. € 8 mill in 2005 • State financing approx. € 80 mill in 2005
Prioritised Themes and Areas • Energy and Environment • Health and Welfare • Education and Learning • Culture • Tourism • Area in progress: Gastronomy
Faculty of Arts and Education • Centre for Reading Research • Centre for Behavioural Research • Department of Music and Dance • Department of Cultural Studies and Languages • Department of Early Childhood Education • Department of Education • PhD in Literacy Studies (in progress)
Faculty of Social Sciences • Norwegian School of Hotel Management – Department of Business Administration • Department of Media, Culture and Social Sciences • Department of Social Studies • Department of Health Studies
Faculty of Science and Technology • Department of Mathematics and Natural Sciences • Department of Electrical and Computer Engineering • Department of Petroleum Engineering • Department of Mechanical and Structural Engineering and Materials Sciences • Department of Industrial Economics, Risk Management and Planning
Faculty of Science and Technology • Important R&D-Centres • Centre for Increased Oil Recovery (COREC) • Centre for Risk Management and Societal Safety • Centre for Asset Management and Maintenance
Doctoral Programmes - PhD • PhD in Offshore technology • PhD in Petroleum technology • PhD in Risk Management and Societal Safety • PhD in Special Needs Education • PhD in Management • PhD in Information Technology • PhD in Biological Chemistry
Master Programmes Faculty of Science and Technology • Information Technology • Offshore Technology • Petroleum Engineering (taught in English) • Industrial Economics • Resilience and Risk Management • Biological Chemistry (’06) • Petroleum Engineering Management (’06) • Aquatic Environmental Engineering (’06)
Master Programmes Faculty of Arts and Education • Special Needs Education • Literacy Studies (taught in English) • Music Education • Music Performance • Joint Master in Migration and Intercultural Relations (’06) • History - Didactics (’06)
Master Programmes Faculty of Social Sciences • International Hotel and Tourist Administration (taught in English) • Risk Management and Social Safety • Change Management • Business Administration • Social Work • Service Management • Art and Culture (’06) • Comparative European Social Studies (MA CESS i Maastricht)
Bachelor ProgrammesFaculty of Social Sciences • Media, Journalism and Social Sciences • Human Resources Management • Art and Culture Management • Journalism • Multi Media and TV Production • Hotel, Tourism and Business Management • Business Administration • Business and Information Systems • Hotel Management • Tourism Management • Health and Social Work Education • Nursing • Social Work • Child Welfare
Bachelor Programmes Faculty of Science and Technology • Engineering • Civil Engineering • Computer Engineering • Electrical Engineering • Chemical Engineering • Mechanical Engineering • Petroleum Engineering • Biological Chemistry
Bachelor Programmes Faculty of Arts and Education • Humanities • Language and Literature (Nordic, English, French, German) • History and Culture • Teacher Education • General Teacher Education (4 years) • Preschool Teacher Training • Music and Dance • Music Teacher, classical • Music Teacher, jazz • Dance Teacher • Instrumental Performance, classical
Strategy, internationalisation • Increase the numbers of international master’s programmes and Joint Master’s • Increase the number of programs taught in English • More international cooperation within the PhD-programmes • More cooperation within research and development • Increase Teacher and Student Mobility
Specially designed programmes for International students Degree opportunities and exchange program opportunities: Degree opportunities: • MSc in Petroleum Engineering • MSc in International Hotel and Tourism Management • Master Programme in Literacy Studies • Master Programme in Music Performance • Joint Master programme in Migration and Intercultural Relations • Music Production and Recording • PhD-Programmes Exchange program opportunities: • Undergraduate exchange programme in Hotel- and Tourism Management • Department of Foreign Languages (English, French, German) • Norwegian Language and Culture • Comparative Educational Studies • Nursing, Social Work and Child Welfare • Music and Dance Programmes
Specially designed programmes for International students In progress: • Master's Programme in Business Administration • MSc in Petroleum Engineering Management • MSc in Technology Management • MSc in Information Technology, Signal and Image Processing • One year undergraduate course in Petroleum Engineering • Joint Master Programme in Intercultural Leadership and Management
Orientation programme for International Students • Pick-up service • Air-port, train-station, etc • Housing guarantee • minimum one semester contract • Presentation of UiS • Computer room • Student card • Guided tour on campus • Library introduction • Meeting Norwegian culture • How to reduce the cost of living in Norway • Practical arrangements • Passport/Visa/Immigrant Office • Bus card • Bank account • Health check (TB)
Orientation programme for International Students • Guided tours Downtown and in Rogaland county • city walk • bus trip • boat trip • daylong hike in mountain • barbeques Note the 3000ft drop below them into a cold fjord!