An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHORTLIST PRESENTATION prepared for George Mason University May 30, 2012

  2. TEAM STRUCTURE GMU (Owner) Branch Highways (D-B Project Management, Construction) Rinker Design Associates (Lead Designer) Whitman, Requardt & Associates Toole Design Group (Structural Design, QAM, Geotechnical Engineering) (Landscape Architecture)

  3. PROJECT EXPERIENCES PROJECT TEAM EXPERIENCE • DESIGN • Kamp Washington Intersection Improvements (City of Fairfax) • Jermantown Road Widening (City of Fairfax) • Prince William Parkway (Prince William County) • Route 29 Widening (Fairfax County) • Stringfellow Road Widening (VDOT, Fairfax County) • Fairfax County Parkway & Fair Lakes Parkway Interchange & Widening (WR&A) – (VDOT, Fairfax County) • CONSTRUCTION • Spriggs Road, Phase II (Prince William County) • Route 123 VDOT Project (Fairfax County, Lorton) • N. Main Street Improvements (Town of Blacksburg, VA) • Frederick Douglass Elementary School (Town of Leesburg) • DESIGN-BUILD • Route 15 (James Madison Highway) Improvements PPTA/ Design-Build (Prince William County) • Route 58 Meadows of Dan Bypass & Hillsville Bypass PPTA/Design-Build (Hillsville, VA) • Sudley Manor Drive/Linton Hall Road PPTA/Design-Build (Prince William County) • Crosspointe Centre Design-Build (Prince George County)

  4. ORGANIZATIONAL CHART

  5. DESIGN APPROACH • Design Consistent With All RFP Requirements • Flexibility in Design Concept to Allow for Partnering with University During Final Design • Constructability With a Focus On Minimizing Disruption to University Operations and Regional Traffic • Maintenance of Safe Campus Use Throughout Construction Phase • Provide a Final Product that Enhances the University Campus by Providing an Aesthetically-Pleasing, Safe & Functional Facility • Enhanced Design at Campus Drive Crossing of Route 123 • “Open” Design; Enhanced Lighting & Security; Optional Typical Section • Potential for a Special Campus Place at the West Campus Promenade • Gateway to the University at Braddock Road Entrance

  6. OVERALL CONCEPT

  7. ELEVATION - ROUTE 123 BRIDGE OVER CAMPUS DRIVE RFP TYPICAL SECTION LOOKING WEST FROM EAST SIDE OF ROUTE 123

  8. ELEVATION - ROUTE 123 BRIDGE OVER CAMPUS DRIVE BRANCH OPTIONAL TYPICAL SECTION LOOKING WEST FROM EAST SIDE OF ROUTE 123

  9. STRUCTURAL DESIGN APPROACH • Route 123 (Ox Road) over Campus Drive • Route 123 – National Highway System • Meet Volume V, Part 2, Chapter 6 requirements • Superstructure Alternatives • Pre-stressed concrete • Low maintenance • Preferred option from RFP • Sub-structure • Fully integral/semi-integral abutment • Low maintenance • Shared-use path • Integral with proposed bridge

  10. STRUCTURAL DESIGN—AESTHETICS • Retaining wall texture • Parapet wall texture • Pedestrian fence • Colors • No stay-in-place forms • Creates uniform color under bridge with pre-stressed concrete beams • 13-foot opening between each bridge structure • Allow more natural light on Campus Drive

  11. STRUCTURAL CONSTRUCTION SEQUENCING • Sequence of Construction • Shift Route 123 to the east • Build bridge structure 1 phase (Eliminates drainage issues during construction) • Reconstruct Route 123 • Complete Campus Drive

  12. STRUCTURAL DESIGN

  13. LANDSCAPING, LIGHTING AND SITE FEATURES • Primary Design Goal: Reinforce theOverall Image of University with an Integrated Landscape Design • Three General Concepts: • Open Space/Plantings • Furnishings/Lighting Fixtures • Circulation/Wayfinding

  14. BRADDOCK ROAD ENTRANCE

  15. LANDSCAPE CONCEPT PLAN

  16. WEST CAMPUS PROMENADE

  17. LANDSCAPE CONCEPT PLAN (continued)

  18. PROJECT CONSTRUCTION APPROACH • Construction Approach Developed with Focus on Minimizing Disruption to Campus Activities • Flexibility in Schedule & Operations to Accommodate University Events & Activities • Focus On Mobility & Safety for Campus Users During Construction Phase • Adherence to Construction Traffic Requirements in RFP • General Sequence of Construction Overview • Initiate East Campus Construction First • (No Environmental Permit Required) • Initiate West Campus Construction Second • (Environmental Permit Required) • Initiate Work in VDOT Right of Way Third • (Dependent upon Utility Relocation)

  19. CONSTRUCTION SEQUENCING—PHASE I

  20. CONSTRUCTION SEQUENCING—PHASE II

  21. CONSTRUCTION SEQUENCING—PHASE III

  22. PROJECT SCHEDULE • Detailed Project Schedule Provided by Branch in Technical Proposal • Milestone Dates: • Notice to Proceed—July 2012 • 60% Design Complete/Begin Construction—September 2012 • Substantial Completion—October 2013 • Final Completion—November 2013

  23. Quality Assurance/Quality Control QA/QC • QAM responsible for project QA/QC process • Process meets VDOT QA/QC requirements • QA Independent & Separate from QC duties

  24. QA/QC—DURING CONSTRUCTION • QA monitors QC during construction • Ensure all inspection/testing according to tables • Maintain regular documentation/ records

  25. SCOPE AND PRICING • INTENT TO DELIVER BEST VALUE PROJECT TO GMU • BRANCH Proposal Provides All Scope Items Required by RFP • Enhanced West Campus Promenade Improvements • Enhanced Landscape Plan • Enhanced Lighting • Site Features (benches, bike racks, trash cans, etc.) • INNOVATIVE DESIGN • Optional Campus Drive Typical Section Under Route 123 Bridge • Elimination of Retaining Wall East of Route 123

  26. WHY THE BRANCH TEAM? • Experienced Team with Proven History of Delivering Projects On Schedule • Experience Working on College Campuses (VMI, Washington & Lee, Virginia Tech, UVA, Radford, Liberty University) • Extensive Knowledge of VDOT & Design-build Processes • Dogmatic Approach to Safety • Proactive Approach to Problem Solving • Accelerated Project Schedule (Early Delivery to GMU) • Successful History Partnering with Project Owners

  27. CONTACT INFORMATION BRANCH HIGHWAYS, INC. P.O. Box 40004, Roanoke, VA 24022p(540) 982-1678 f(540) 982-4216www.branchhighways.com Primary Point of Contact: Michael C. Tomlinson Vice President, Estimating/Business DevelopmentBranch Highways, Inc.miket@branchhighways.com Pete Kramer Project ManagerBranch Highways, Inc.petek@branchhighways.com(540) 982-1678 Gale Tschour Chief EstimatorBranch Highways, Inc.gale.tschour@branchhighways.com(540) 982-1678 Mark Gunn, P.E. Project Manager/PrincipalRinker Design Associates, P.C. mgunn@rdacivil.com(703) 368-7373 Daniel Biggs, RLA Landscape ArchitectToole Design Group dbiggs@tooledesign.com(301) 927-1900 Jeremy Schlussel, P.E. Vice PresidentWhitman, Requardt & Associates, LLP jschlussel@wrallp.com(804) 272-8700 Robert Shackelford, P.E. Associate, Construction Mgmt. Svcs.Whitman, Requardt & Associates, LLP rshackelford@wrallp.com (804) 814-5782

  28. QUESTIONS & ANSWERS