An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Astaldi Group A successful business model to boostinfrastructures 2011 Russia Calling 5 October 2011

  2. ASTALDI GROUP • Astaldi is the first Italian General Contractor and one of the most important players in the construction sector at worldwide level • Over 7,700 employees, more than 100 job-sites at 30 June 2011 • Listed on Milan Stock Exchange since June 2002 Rome Subway Line C (Iltay), general contracting Milan Subway Line 5 (Italy), project finance

  3. ASTALDI EXPERTISE • Transport infrastructures: railways, subways, roads, highways, airports, ports, etc. • 7th contractor worldwide in mass transit and rail • Water and Energy: dams, hydroelectric power plants, water supply plants, acqueducts, etc. • 4th contractor worldwide in dams and reservoirs • Civil and Industrial Buildings: hospitals, universities, expo fair centres, civil works in oil&gas projects, etc. • 24th contractor worldwide in industrial plants ITALY >> Naples Subway Line 1 (construction) CHILE >> Chacayes Hydroelectric Power Plant (construction and management) ITALY >> New Hospital in Mestre (construction and management)

  4. Leadership in Italian market • Acquisiton of Italstrade and Gruppo Dipenta Costruzioni 2000 Revenues: € 858mn Revenues: €300mn OVER 85 YEARS OF GREAT WORKS Cimego Hydroelectric Plant (Italy) Anatolian Motorway (Turkey) general contracting Jonica National Road (Italy) general contracting Chacayes Hydroelectric Plant (Chile) concession • An integrated approach: General Contracting and PPP/Project finance • Consolidation of the Group’s competitive position • Rationalization of equity participations and geographical positioning • Merger of Impresa Astaldi Costruzioni e Lavori Pubblici and Impresa Astaldi Estero • IPO • New Hospital in Mestre, the first PPP in Italy 2010 • Impresa Astaldi Estero was established • ‘’Direttissima Roma-Firenze’’ Railway Project, Italy • Inga Hydroelectric Project, Congo 2005 Revenues: > € 2bn • Anatolian Motorway in Turkey • # 93 contractor worldwide in 2011 ENR Top Global Contractors List • # 7 contractor worldwide in mass transit and rail Revenues:≈ € 1bn 2002 • Impresa Astaldi Costruzioni e Lavori Pubblici was established 1997 • Sante Astaldi established his construction business, Ing. Sante Astaldi 1987 1986 ’50s-‘80s 1929 1926

  5. ASTALDI, A SUCCESSFUL BUSINESS MODEL – A Dual IntegratedApproach • Astaldi can act both as General Contractor in large scale infrastructure works and as PPP partner. • General Contracting (engineering + procurement + construction) • Concessions: PPP/Project finance (financing + construction + management)

  6. ASTALDI, A SUCCESSFUL BUSINESS MODEL – A Dual IntegratedApproach Concession Projects: • Italy - 2 subway lines in Milan (Line 5 and Line 4) – ≈ 30 km of new line and 40 stations • - 5 hospitals – 170,000 sq.m. and 2,900 beds • - 5 car parks – 3,600 park lots • Turkey - Milas-Bodrum Airport – 3,000,000 pass./year • - Gebze-Izmir Highway – 422 km • - Etlik Hospital – 1,080,000 sq.m. and 3,100 beds • Chile - Chacayes Hydroelectric Power Plant – 111MW • Central America - Tumarin Hydroelectric Power Plant – 202MW CHILE >> Chacayes Hydroelectric Power Plant (construction and management) ITALY >> New Hospital in Mestre (construction and management)

  7. Astaldi Concessions - Growth • 2010-2015 BUSINESS PLAN • TARGETS: • CAR PARKS = 3700 • HIGHWAYS = 500 KM • HOSPITALS = > 4000 BEDS • SUBWAYS = 30 KM • HYDRO = 1200 MW 2010 • AS OF TODAY: • CAR PARKS = 3700 • HOSPITALS = 2830 BEDS • SUBWAYS = >13 KM + 19 STATIONS • HYDRO = 110MW 20 2013 2014 2015 2016 2017 2018 2019 2020 In operation 2011 2012 500 km 420 km Highways (# km) >30 km 70 km Subways (# km) 14 km 7 km • FURTHER OPPORTUNITIES • COMING FROM: • Italy: highways and subways • Foreignmarkets: highways, healthcare, hydroelectric (mainly in Chile and Turkey) 1,200 MW Water & Energy (# MW) 700 MW 300 MW 111 MW >4,000 beds Healthcare (# beds) 3,000 beds 680 beds

  8. ASTALDI WORLDWIDE • Peru • Chile • Costa Rica • El Salvador • Guatemala • Honduras • Nicaragua • USA • Venezuela • Brazil • Canada • Panama • Algeria • Tunisia • Oman • Qatar • Saudi Arabia • UAE • India • Italy • Bulgaria • Romania • Turkey • Poland • Russia (St. Petersburg) Areas of interest New Markets Traditional Markets