slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
MOIMS AREA PLENARY NAVIGATION WG REPORT September 2005 PowerPoint Presentation
Download Presentation
MOIMS AREA PLENARY NAVIGATION WG REPORT September 2005

Loading in 2 Seconds...

play fullscreen
1 / 6

MOIMS AREA PLENARY NAVIGATION WG REPORT September 2005 - PowerPoint PPT Presentation


  • 65 Views
  • Uploaded on

CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS. MOIMS AREA PLENARY NAVIGATION WG REPORT September 2005. WG REPORT. SUMMARY TECHNICAL STATUS (1 of 2). Navigation WG

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MOIMS AREA PLENARY NAVIGATION WG REPORT September 2005' - kass


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS

MOIMS AREA PLENARY

NAVIGATION WG REPORT

September 2005

slide2

WG REPORT

SUMMARY TECHNICAL STATUS (1 of 2)

  • Navigation WG
    • Goal: Development of standard protocols for the interagency exchange of data required for spacecraft tracking and attitude/orbit determination.
    • Working Group Status: Active _X__ Idle ____
    • Working Group Summary Situation:
    • Working Group Summary progress:
    • Next chart
    • Problems and Issues:
    • Chart 4
slide3

NAVIGATION WG REPORT Sept 2005

SUMMARY TECHNICAL STATUS (2 of 2)

  • September 2005 workshop accomplishments:
  • Conducted extensive and detailed discussions and review of the ADM, the TDM, and the XML specification white books (XML covers all navigation data messages); including all related material in the Navigation GB.
  • The Nav WG is interested in supporting the proposed new work pertaining to DDOR: Difference Differential One-way Range (delta-DOR), subject to directions from the CESG.
  • The Nav WG is interested in supporting the ISO SC14 collision avoidance work, subject to feedback from ISO SC14 personnel.
  • Participated in the discussion that led to establishment of the XML Standards and Guidelines SIG. The Nav WG is represented in this SIG.
slide4

NAVIGATION WG REPORT Sept 2005

CROSS-AREA TECHNICAL ISSUES

  • Issue 1: When new work is proposed, it is not being announced in a coordinated manner to all WGs. Example: Space Ground Interoperability BOF.
  • OTHER ISSUES AND CONCERNS
  • Issue1: (From Spring 2005) Priority for real-time radiometric data transfer, if required, needs endorsement by CESG, CMC, IOAG or the Agencies.
slide5

NAVIGATION WG REPORT Sept 2005

PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL

RESOLUTION 1

The Navigation WG resolves to request the CMC to approve the initial red book releases of the Tracking Data Message, the Attitude Data Messages and the XML Specification documents for official CCSDS review. These documents will be finalized and ready for release by October 17, 2005.

RESOLUTION 2The Navigation WG resolves to request the CMC to approve the release of the Navigation green book, issue 2, which will be finalized and ready by October 17 2005.

RESOLUTION 3

The Navigation WG is pleased to express appreciation to NASA and OMG for their excellent hosting of this workshop.

slide6

NAVIGATION WG REPORT Sept 2005

Participants

F. Flores-Amaya (NASA/GSFC)

D. Berry (NASA/JPL)

J. Foliard (CNES)

F. Martinez (ESA/GMV)

P. Morinelli (NASA/GSFC)

L. Paal (NASA/JPL)

S. Pallaschke (ESA/ESOC)

Mina Ogawa (JAXA)

J. Van Eepoel (NASA/GSFC)