This document provides an update on the Low-Level Radio Frequency (LLRF) system preparation for ILC 9mA studies as of July 3, 2012. It includes details from the presentation on Quantum Leap (QL) calculations, outlines limiters for cavity voltage, and summarizes logbook entries from the TTF. Key parameters such as Limit 1 and Limit 2 for cavity voltage are highlighted, including relevant settings and timing specifications critical for ongoing studies. For further details, refer to the TTF logbook entry linked here: http://ttfinfo.desy.de/TTFelog/show.jsp?dir=/2012/26/28.06_a&pos=2012-06-29T08:57:42.
E N D
LLRF status update Preparation for ILC 9mA studies 03.07.2012
QL calculation TTF logbook entry: http://ttfinfo.desy.de/TTFelog/show.jsp?dir=/2012/26/28.06_a&pos=2012-06-29T08:57:42
Pre-limiters Cavityvoltage Limit 1 Limit 2 • Limit 1 (ena) • Limit 2 (ena) • Step (h) • Limit max(sum(h)) • t = 1us