Case Studies

Case Studies. Centrica York Module. Client : Heerema Fabrication Duration: In progress Services : Onshore and Offshore access utilising scaffolding, roped access to facilitate the painting of the module and jacket. Location: Hartlepool. Arklow Wind Farm.

karah
Download Presentation

Case Studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Studies

  2. Centrica York Module Client: Heerema Fabrication Duration: In progress Services: Onshore and Offshore access utilising scaffolding, roped access to facilitate the painting of the module and jacket. Location: Hartlepool

  3. Arklow Wind Farm Client: Smulders BV Arklow Offshore Wind Farm. Duration: Feb – August 2008. Services: Specialist scaffolding to support the coatings refurbishment of the main towers belonging to the Arklow Offshore Wind Power Farm. Location: Irish Sea, 10km off the east coast of County Wicklow, Republic of Ireland. All materials were transported to and from the Arklow using special shallow draught vessels. Before After During

  4. Sheringham Shoal Modules Client: Heerema Fabrication Duration: 2010 - 2011 Services: Scaffolding, painting and containment of two (2) substation platform topsides belonging to the Sheringham Shoal Offshore Wind Farm. Situated 17 – 23 km north of the Norfolk coast. Location: Hartlepool and Greater Wash.

  5. Walney Island Client: Areva Duration: 2010 - 2011 Services: Utilising roped access to facilitate the complete re preservation of coatings, situated 15 km off Walney Island, Cumbria. Location: Irish Sea. Before After

  6. Greater Gabbard Client: Heerema Fabrication Duration: 2010 - 2011 Services: Utilising roped access to facilitate painting, situated 25 km off Suffolk coast. Location: North Sea.

  7. Centrica Ensign Client: Heerema Fabrication Duration: 2010 - 2011 Services: Onshore and Offshore access utilising scaffolding, roped access to facilitate the painting of the module and jacket. Situated 80 km east of the Norfolk coast. Location: North Sea.

  8. BP Andrew Module Client: Heerema Fabrication Duration: In progress Services: Onshore and Offshore access utilising scaffolding, roped access to facilitate the painting of the module and jacket. Location: 230 km NE of Aberdeen