An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CCDD Rules and Regulations Salvaging Chad Broege – Thelen Sand & Gravel

  2. SALVAGING

  3. Salvaging • Section 1100.205 Salvaging • Definition: “Salvaging” means the return of CCDD to use other than use as fill at a CCDD fill operation. • a) All salvaging operations must in no way interfere with the CCDD fill operation, result in a violation of this Part, or delay the construction of final cover. • b) All salvaging operations must be performed in a safe manner in compliance with the requirements of this Part. • c) Salvageable materials: 1) May be accumulated onsite by an owner or operator, provided they are managed so as not to create a nuisance, harbor vectors, cause malodors, or create an unsightly appearance; and 2) May not be accumulated at the facility for longer than one year unless a longer period of time is allowed under the Act or is specified in the permit.

  4. Recycling • Recycling CCDD • broken concrete without protruding metal bars • Bricks • Rock & Stone • Reclaimed asphalt pavement • soil generated from construction or demolition activities

  5. Recycling - Concrete Concrete Recycling • Separate concrete at CCDD fill-site and/or at jobsite for recycling • ACT does not allow concrete w/ protruding metal as CCDD • Recycling concrete w/ Protruding Metal – General Construction & Demolition Debris • 415 ILCS 5/22.38 • Materials • 3” • Grade #9 Crushed Concrete

  6. Recycling – Concrete w/ protruding rebar415 ILCS 5/22.38 • Defined as General Construction or Demolition Debris • Acceptance Must DOs: • Facility boundaries no closer than 1320’ from residential zoned property • Recycle/Transport GCDD w/in 6 months (CCDD – 1 yr.) • Record procedures to demonstrate compliance w/ this section & identify source & transporter • Control dust & noise • Control access to the facility • Submit Facility Information Form to Agency 30 days prior to material acceptance (found online)

  7. Recycling - Asphalt Asphalt Recycling • Separate asphalt at CCDD fill-site and/or at jobsite for recycling • ACT does not allow hot mix and/or cold patch • Materials • Crushed Asphalt

  8. Recycling – Rock/Stone & Soil Rock/Stone & Soil Recycling • Separate & Screen CCDD at source and/or at fill site • Equipment • Power Screen • Trommel • Beneficial Re-Use • Fill Sand • Bedding Stone • Backfill • Topsoil

  9. Questions?