An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REGULATIONS ON ENERGY EFFICIENCY & CONSERVATION OF VIETNAM • Cu Huy Quang, Officer of EECO - MOIT

  2. Content Regulation on Energy Efficiency and Conservation of Vietnam The Vietnam Energy Efficiency & Conservation Program (VNEEP)

  3. Regulation on Energy Efficiency and Conservation of Vietnam

  4. LAW No. 50/2010/QH12 Decree No. 21/2011/NĐ-CP Detailed regulations and measures for implementation of the Law on EE&C Decree No. 73/2011/NĐ-CP Regulations on the penalties for the administrative violations in EE&C • Related Regulations Circular No. 39/2011/TT-BCT Training, certification of EMs, EAs Circular No. 09/2012/TT-BCT Planning & Report on the implementation of EE&C plans; Forms of Reports. Procedures on Energy Audits, and Report

  5. LAW No. 50/2010/QH12 Decree No. 73/2011/NĐ-CP Regulations on the penalty for the administrative violation in EE&C Decree No. 21/2011/NĐ-CP Detailed regulations and measures for implementation of the Law on EE&C • Related Regulations Circular No. 39/2010/TT-BCT Training content, program, authority of energy management, energy audit certificates Circular No. 07/2012/TT-BCT Energy Labeling for the energy using vehicle, appliances

  6. Decision No. 51/2011/QĐ-TTg issued by the Prime Minister – Approval of the List of Facilities and Equipment Required to Comply with Regulations on Energy Labeling and Minimum Energy Performance Standards. • Decision No. 68/2011/QĐ-TTg issued by the Prime Minister on the List of Energy Efficient Facilities and Equipment to be equipped in the offices and organizations which using state budget. • Related Regulations

  7. (Articles15, 16, 17, 18) (Articles 9, 10, 11, 12, 13, 14) EEC in buildings, public lighting EEC in Industry (Articles 19, 20, 21) (Articles 29, 30, 31) • Subjects regulated by EEC Law EEC in Transport EEC in projects and Agencies using State budget (Articles 22, 23, 24, 25) EEC in Agriculture (Articles 37, 38, 39, 40) (Điều 26, 27, 28) EEC over energy-consuming machinary/equipment EEC in Households & Service activities (Articles 32, 33, 34, 35, 36) Key energy using entities (KEUE)

  8. ENERGY MANAGEMENT IN THE KEY ENERGY USING ENTITIES (KEUE)

  9. Industrial and agricultural production establishments and transport units which annually consume energy of a total of one thousand tons of oil equivalent (1,000 TOE) or higher per year; • Construction works used as offices and houses; educational, medical, entertainment, physical training and sports establishments; hotels, supermarkets, restaurants and shops which annually consume energy of a total of five hundred tons of oil equivalent (500 TOE) or higher per year. • Identification of the KEUEs • (Article 6, Decree No. 21/2011/NĐ-CP)

  10. In addition to those obligations provided in the Law to various respected fields of jobs, the KEUE shall perform the following obligations: • Measures applied to KEUEs • (Article 33, Law on EE&C) To appoint an energy manager in accordance with Article 35 of this Law To perform compulsory energy audit once every 3 years

  11. To apply Energy Management Modelaccording to the guidance of State competent authorities; • Measures applied to KEUEs(Article 33, Law on EE&C) To develop and implement annual and 5-year plans for energy efficiency and conservation in conformity with their business and production plans; to report results of the implementation of energy efficiency and conservation plans to the State competent authorities at the locality.

  12. The person appointed to be an energy manager must have the following qualifications: • For KEUEs in the field of industrial production, construction works and business services, he/she must have a college (or equivalent) degree on energy speciality or related technique; for KEUEs in the field of transportation and agricultural production, • he/she must have an intermediate level technical • certificate or higher; • b) He/she has been trained on energy management and has a certificate issued by the competent agency. • Energy Managers • (Article 35, Law on EE&C)

  13. Enterprise can carry out audit by itself Energy audit (Article 34 Law on EE&C) or Hire energy audit organizations • Measures applied to KEUEs Having a team of certified energy auditors Energy audit organizations must meet the following conditions Having appropriate technical equipment for energy audit. Being established under law

  14. 1. The key energy using entities: To perform compulsory energy audit one for three years(Article 33, Law on EE&C). 2. The enterprises which are not in the List of KEUEs: Be encouraged to periodically perform energy audits and report on the status of energy use to local Provincial DOIT. (Article 25, Decree No. 21/2011/NĐ-CP). • Obligation to do Energy Audit

  15. MOIT Circular No. 09/2012/TT-BCT dated on 20/4/2012 defined in detail the procedure of energy audit performance. • MOIT Circular No. 39/2011/TT-BCT dated on 28/10/2011 defined in detail the training contents,program, competency of award, recognition, revocation ofenergy auditor license. • Perfomance of Energy Audit

  16. (Article 9, Decree No. 21/2011/NĐ-CP): During 30 days after performing an energy audit, KEUEs have to send Energy Audit Report to the local Provincial Department of Industry and Trade • Energy audit of KEUEs

  17. MOIT Circular No. 09/2012/TT-BCT dated on 20/4/2012 guides KEUEs about: • Planning for EE&C and Reporting on the implementation results; • The Forms of annual and 5-year plans for EE&C and reports on the implementation results. • Planning for EE&C and Reporting on the implementation results

  18. KEUEs perform the planning for EE&C and reporting on the implementation results in Internet, through electronic portal of the National Energy Database System (NEDS); • Each KEUE will have its address and ID given by NEDS for access, and work with its files. • Planning for EE&C and Reporting on the implementation results • (Circular No. 09/2012/TT-BCT)

  19. The Vietnam Energy Efficiency and Conservation Program (VNEEP)

  20. Program Steering Committee including Representatives of the Ministries: MoIT, MoC, MoT, MoET, MoCI, MoST, MPI, MoF, Justice, and the Union of Vietnam Science and Technology Associations) • VNEEP Implementation Arrangement Energy Efficiency & Conservation Office People Committees of Provinces and Central Cities: To prepare policies for monitoring Energy saving and efficiency at local level; To collaborate with NPSC for implementing projects in localities.

  21. Programme Branched Offices: Established at selected provinces and central cities • VNEEP Implementation Arrangement Supporting bases: Laboratories for checking energy efficiency of electric devices. Certificated Energy Auditing Agencies. Programme components: 11 Projects located in 6 component groups.

  22. Objective: To advance Energy Efficiency and Energy Savings in energy intensive priority sectors: • Industry • Commercial, Office and Residential Buildings • Transportation • Saving of 3%-5% during period 2006-2010 • Saving of 5%-8% during period 2011-2015 • VNEEP Objectives

  23. Energy audits conducted in 300 large enterprises and 12 power plants • 300 energy audits conducted in SMEs and commercial buildings • 1024 designated enterprises have energy management system. • 2500 energy managers and 200 energy auditors get certification • 100% of new buildings complies with EEBC by end of 2015 • VNEEP Specific Targets

  24. Steel : 20-25% Cement : 10-40% Buildings : 10-15% Transport : 25-28% Lighting puplish: 20-30% • Saving Potential

  25. Total energy saving estimated for period 2006-2010 is KTOE 4900 corresponding to 3.4%. • In 2011 electric intensity per GPD is 1.63. This is significant reduce compare with 2008: 2.02; 2009: 2.42 and 2010: 2.0 • Power savings achieved by 1.43% for year 2011 • KEY Results – Overrall Target

  26. Household: • 3000 biogas cellars, 100,000 solar water heaters, 46 million compact light bulbs per year. • Industry: • Energy management system at 250 designated enterprises. • Certified 450 energy managers and 80 energy auditors • EE labelling 147 products • Energy audit conducted for 243 enterprises, EE measures implemented for 50 enterprises. • Buildings: implement green buildings model. • KEY Results – Overrall Target

  27. VNNEP Donors