Integration and Test. Integration Agenda. Recent Activities Environmental Tests Completed Delivery to Astrotech Probe Processing Fueling Preparations Carrier Processing Probe and Instrument Status Instrument Status and Remaining Items Probe Status and Remaining Items Integration Plan

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Integration and Test' - kalli


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Integration agenda
Integration Agenda

  • Recent Activities

    • Environmental Tests Completed

    • Delivery to Astrotech

    • Probe Processing

    • Fueling Preparations

    • Carrier Processing

  • Probe and Instrument Status

    • Instrument Status and Remaining Items

    • Probe Status and Remaining Items

    • Integration Plan

  • Review Process

    • RFAs in Work

    • Reviews Ahead


Environments
Environments

Magnetics

Vibration

Acoustics

EMC

Thermal Vacuum

Spin Balance


Probe processing
Probe Processing

Delivery to ASO

Bolt Cutter Installation

Solar Array Illumination

Performance Tests


Probe fueling preps
Probe Fueling Preps

Vibration

Acoustics

Spin Balance

Dry Weigh & Pressurize

Ready for Fuel

FM2/FM3 Thermal Vacuum

Thermal Vacuum

Storage


Carrier processing
Carrier Processing

PC Unload

Vibration

Acoustics

Spin Balance

Ready for Probes

Storage

SSS Installation


Instrument status
Instrument Status

  • Instrument Status

  • Flight Hardware Ready

  • Flight Software Ready

    Recent Activities

  • Performance Test

    Remaining Items

  • ESC Verification

  • SST/ESA Covers

  • EFI Hats

  • Contamination Samples


Probe status
Probe Status

  • Probe Status

  • Hardware Complete

  • Software Complete

    Recent Activities at ASO

  • Performance Tests

  • Solar Array Illumination

  • RCS Pressurization to 1.1*MEOP

  • Dry Weigh

    Remaining Items

  • Fueling

  • Flight Plugs

  • Integrate to PC

  • Attach Sep System


Integration flow
Integration Flow

ASTROTECH and Launch Pad Flow

THEMIS Launch

12/08/06

to

Shipping from JPL

12/11/06

12/13/06

12/19/06

12/20/06

12/12/06

12/11/06

12/14/06

12/15/06

12/15/06

12/19/06

12/21/06

Install Bolt Cutters, Therm. Closeouts

F4-5 RCS MEOP, LPT, S/A Test

F2-3 RCS MEOP, LPT, S/A Test

5 Probes plus EGSE, MGSE at ASO

F1 RCS MEOP, LPT, S/A Test

Unpack, Setup EGSE

Move Probes to HPF

12/11/06

Probe Carrier Unpack

12/15/06

PC-VCO Electrical Test

01/13/07

01/09/07

01/11/07

12/22/06

01/08/07

01/10/07

01/12/07

12/23/06

01/03/07

01/05/07

01/02/07

Weigh Wet Probes, Attach Pyro

PCA Funct.

Spin Balance

Christmas Shutdown

Probe RCS Electr. Verif.

Weigh, Move to Stands

Weigh PCA

Probe Fueling

12/18/06

Install Sep. Harness

01/03

01/12

Pre-Vos

LVRR (KSC)

01/05

MRR (GSFC)

01/12

Media Day

12/19/06

Install SMDC Lines

01/23/07

01/24/07

01/26/07

01/29/07

01/25/07

01/27/07

01/30/07

01/3107

02/01/07

01/22/07

02/02/07

01/15/07

Install Pyro Signal SMDC/ Weigh PCA

PCA Mate to 3rd Stage/ Clamp-band Instl

PCA Comm Check @ Blockhouse

Engr Walk-down/ Trans- port Preps

Transport to Pad

PCA Functional

Reserve

01/23

02/01

MRR (HQ)

LSRR (CCAFS)

02/08/07

02/12/07

02/13/07

02/14/07

02/05/07

02/03/07

02/06/07

02/07/07

02/09/07

02/15/07

2nd Stage Fueling, Ordnance

Launch Readiness Review

Install Fairing

Power On & Stray Voltage

Launch

Launch Rehearsal

Prop. Load Prep

S/C Functional & RF Test

FRR (KSC)

02/12

02/13

LMCM (KSC)


RFAs

  • RFA Status

  • Incomplete: 0

  • Complete: 308

  • Closed: 304

  • Total: 308

  • Final Four Closure Method

  • RCS Proof Issue: Expected to Close with Risk Definition

  • BAU EEPROM Plots Provided were Insufficient to the reviewer but it is no longer practical to obtain better plots.

  • Energy Balance was Provided using Best Thermal Model at the time. Reviewer repeated request using new mission profile and correlated thermal model. This was delivered in December.

  • Launch Window Analysis will be reviewed by GSFC by 1/15/07