1 / 14

Scheduling Email communication to reduce Information Overload and Interruptions

Scheduling Email communication to reduce Information Overload and Interruptions. Oh ! I dream of an ideal workplace - “an interrupt-free workplace” . By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath. Objective of the study. To improve knowledge worker performance by

kalista
Download Presentation

Scheduling Email communication to reduce Information Overload and Interruptions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scheduling Email communication to reduce Information Overload and Interruptions Oh ! I dream of an ideal workplace - “an interrupt-free workplace” By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath

  2. Objective of the study • To improve knowledge worker performance by identifying policies that will :- • Reduce information overload due to emails. • Reduce interruption effect due to emails. • To develop a heuristic chart to guide a knowledge worker on email response scheduling. • Validate the results of prior research. 1

  3. Prior relevant research on Email Overload & interruptions research • First reportedby Peter Denning (1982),Later by Hiltz, et. al. (1985), Whittaker, et. al.(1996) and many… • According to distraction theory, interruption is “an externally generated, randomly occurring, discrete event that breaks continuity of cognitive focus on a primary task“ (Corragio, 1990; Tétard F. 2000). • Research done HCI is rich but in MS/OR??? • Research that looks at the problem of information overload and interruptions simultaneously is scarce. (Speier,et.al.1999, Jackson, et.al., 2003, 2002, 2001), Venolia et.al. (2003) 2

  4. Recall time- RL IL + Interrupt processing Pre-processing Post-processing Interrupt arrives Interrupt departs Our approach- SIMULATION • Phases of task processing • (Miyata & Norman, 1986):- • Planning • Execution • Evaluation • Policies that we are comparing :- • Triage:(C1-morning, C1-Afternoon) • Scheduled:(C2, C4, C8(jackson, et. al.2003)) • Flow (continuous):C 3

  5. Resource utilization Resource utilization change Email Policy Number of Interruptions per task Task Complexity mix Interrupt arrival pattern Task Completion time Research Model *Utilization: Probability of a knowledge worker being busy (λ/µ) 4

  6. Hypothesis Formulation • H1: Knowledge worker utilization increases with the increase in the frequency of email hour slots for all levels of task Complexity mix, Resource utilization and Interrupt arrival patterns. • H2: The average number of times a simple or complex task gets interrupted increases with the increase in the frequency of email-hour slots, for all levels of Task complexity mix, Resource Utilization and Interrupt arrival patterns. • H3: Average completion time for simple or complex tasks increases with the increase in the frequency of email-hour slots, for all levels of Task complexity mix, Resource Utilization and Interrupt arrival patterns.

  7. Model Implementation Sn, Cn- new simple & complex task Si, Ci – interrupted simple & complex task E – Email (Interrupt) 7

  8. Dependent variables % change in utilization # of interruptions per simple task # of interruptions per complex task Average completion time for simple task Average completion time for complex task Effect Policy (P) Workload Level (RU) Task Complexity (TC) Interrupt Arrival Pattern (IAP) P * RU P * TC P * IAP P * RU * IAP P * TC * IAP P * RU * TC P * RU * TC * IAP Statistical analysis of Simulation results 8

  9. Result analysis cont… Profile plots RU 9

  10. Result analysis cont… Profile plots RU 10

  11. Result analysis cont… Profile plots RU 11

  12. Contigency framework for Email management 12

  13. Practical implications • If other tasks are more important and email communication is secondary ! • Check emails 4 times a day with each processing not exceeding 45 min if you want to be most productive. • Is timely email processing survival issue for your kind of organization? • Use flow (continuous) policy • Use our prescription chart. 13

  14. Future research • Perform the study in experimental or field settings. • Use perceived measures of Information overload (NASA-TLX, SWAT) • More realistic modeling by incorporating email characteristics • More discrete policies • Use of other frameworks for task analysis • User-interface development Suggestions or comments or Questions???? 14

More Related