An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRT – Bus Rapid Transit Goes Low FloorBRT - 公交低地板化The integrated, mobile and flexible platform集成、机动及灵活的平台

  2. Mass Movement in the Metropolis:大都市人员的大量流动The limits of Private transport.私人交通的局限性 • High population density 高人口密度 • High population growth 高人口增长 • Private transport limited by私人交通局限性的原因: • low per capita income人均收入低 • capacity of the roads 道路本身的容量 圣保罗 城市人口(百万) 中南美洲 人均收入

  3. quickly implemented 快速实施 • can be extended as required 可按需延伸 • use of existing lines/roads 利用现有的线路/道路 • fast with dedicated bus lanes, intelligent traffic light control, ... 快速的客车专用通道 智能化交通信号控制 • slow implementation rate 实施缓慢 • inflexible, difficult to extend 不灵活,延伸困难 • expensive lines/tracks 修建轨道费用昂贵 • fast due to dedicated lines/tracks, independent of road traffic 速度快归功于特殊的轨道线路 独立于道路交通 Mass Movement in the Metropolis:大都市人员的大量流动Public Transport, Bus vs. Rail公共交通:客车与轨道交通

  4. The Solution:Bus Rapid Transit System解决方案:巴士快速交通系统 BRT BBus – On the road: Avoidance of rail-based solutions and their high costs for infrastructure. Reduction of personal transport and therefore avoidance of traffic chaos in the fast growing metropolis. 巴士—道路交通:避免了以轨道为基础的解决方案及所需的高额基础设施投资 减少了私人交通从而使快速发展的大都市避免了交通混乱的状态 RRapid– On the road (dedicated bus lanes) and on the bus: Fast passenger turnaround when boarding and exiting and in the bus interior. Pre-board ticketing. 快速— 道路(客车专用通道)和客车本身: 乘客快速上下车 上车前买票 TTransit System – Consistent, controlled concept with modern, spacious buses (articulated) as feeder buses from the outer areas for distributor buses in the centre. 传输系统— 通过现代大容量客车(铰接客车)从城市外向城市中心输送来客

  5. Low-floor buses 低地板客车 High-floor buses + Platforms 高地板客车 + 公交站台 BRapidTTwo SolutionsBRT系统的两种解决方案 RRapid – Fast passenger turnaround when boarding and exiting increases the average bus speed. 快速 – 乘客上下车速度的加快提高了整个客车运行速度 Two solutions: 两种解决方案:

  6. Fast, Safe and Comfortable Passenger Flow:Elements of a Platform Solution vs. Low-Floor Bus快速、安全和舒适的乘客流:公交站台解决方案的要素 VS 低地板客车

  7. - + Space required / costs 空间要求 / 成本 - + Implementation time实施时间 Effects of implementation实施的效果(Effects on traffic)对交通的影响 - + - + Flexibility / bus stops机动性 / 公交停靠 - + Infrastructure costs基础设施的成本 BRT SystemsComparison of SolutionsBRT 系统两种方案的比较 High-floor buses Platforms 高地板客车 / 站台 Low-floor buses 低地板客车

  8. AV 132 AVN 132 BRT System with ZF Low-Floor Axle SystemsExample - Chile, Santiago装有ZF低地板车桥系统的BRT系统范例—智利、圣地亚哥 1157 Volvo low-floor articulated buses B9SALF, fitted with ZF axle systems:AV 132 (driven) and AVN 132 (non-driven) 1157 辆Volvo低地板交接车B9SALF装有ZF低地板车桥:AV132(驱动桥)和AVN132(非驱动桥)

  9. 使用BRT BRT的优势 主要因素 使用前 公交车数量 停靠站所需时间(高峰时) 整个停靠站时间(以3公里线路为例,每300米一公交站台) BRT System with ZF Low-Floor Axle SystemsMotivation for Low Floor in Chile, Santiago使用ZF低地板车桥的BRT系统智利—圣地亚哥使用低地板车桥的原因 BENEFITS OF LOW FLOOR SYSTEM 使用低地板车桥系统的优势 • Use of existing lines 可使用现存路线 • Use of same streets 可使用同样的街道 • No invest for special corridors 无需投资建设特殊通道 • Implementation of platforms not possible 修建新的展台不可行 • No invest for platforms 无需投资建设新的站台

  10. BRapidT:The Low-Floor BusBRT:低地板客车 The low-floor bus: 低地板客车: The travelling platform which pays back world-wide 回报全世界的传输平台

  11. Independent suspension RL 75 EC 独立悬挂前桥RL75EC Beam axle RL 85 A 低地板前桥RL85A Rear axle system AV 132 低地板后桥系统AV132 Portal axle AVN 132, non-driven 非驱动门式桥AVN132 Tag axle RL 85 NLA, active or passive 主动 / 随动转向支撑桥 ZF Axle Systems for Low-Floor BusesZF低地板公交车车桥系统

  12. Thanks for attention !