Docking and Attachment Test Norway - December 13, 2010. HiLoad during DP Operation – November 2010. Approach to Submersible Barge on DP. Attachment System Activated Maneuvering of Barge by HiLoad DP. HiLoad during DP Operation – November 2010. First Ballast Test – Oct 2010.

kael
Download Presentation

HiLoad during DP Operation – November 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Docking and Attachment Test Norway - December 13, 2010 HiLoad during DP Operation – November 2010

  2. Approach to Submersible Barge on DP

  3. Attachment System Activated Maneuvering of Barge by HiLoad DP

  4. HiLoad during DP Operation – November 2010

  5. First Ballast Test – Oct 2010

  6. HiLoad during DP Operation – November 2010

  7. HiLoad DP No. 1 – In Operation HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP at 42 m draught (138 feet) HiLoad DP No. 1 at “Sea Trial Base” in Norway

  8. 42.0 m 42.0 m Min draught 17.0 m 27.0 m 28.0 m HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP No. 1 at “Sea Trial Base” in Norway