PELAKSANAAN GEDUNG MKPB-144024

PELAKSANAAN GEDUNG MKPB-144024. DODY BRAHMANTYO, ST MT dodybrahmantyo@yahoo.co.id. PRODI TEKNIK SIPIL FAKULTAS TEKNIK - UNIVERSITAS NAROTAMA. Waktu Perkuliahan. Senin, Pukul 16:30 – 18:40 Terdiri dari : 1. Ceramah di sesi pertama (16:30-17:30) 2. Break time (17:30-17:45)

juro
Download Presentation

PELAKSANAAN GEDUNG MKPB-144024

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PELAKSANAAN GEDUNG MKPB-144024 DODY BRAHMANTYO, ST MT dodybrahmantyo@yahoo.co.id PRODI TEKNIK SIPIL FAKULTAS TEKNIK - UNIVERSITAS NAROTAMA

  2. Waktu Perkuliahan • Senin, Pukul 16:30 – 18:40 Terdiri dari : 1. Ceramah di sesi pertama (16:30-17:30) 2. Break time (17:30-17:45) 3. Responsi dan diskusi (17:45-18:40) Perkuliahan dimulai tepat waktu. Toleransi keterlambatan adalah 15 menit.

  3. Penilaian • Kehadiran – 10% • Tugas dan presentasi kelompok – 20% • Kuis – 20% • UTS – 25% • UAS - 25%

  4. Materi Kuliah • Pendahuluan • Perkembangan Proyek Konstruksi • Siklus Proyek Konstruksi • Stakeholder Proyek • Kontrak Proyek Konstruksi • Perencanaan • Filosofi Perencanaan • Perencanaan Tahapan Konseptual Proyek • Pengadaan / Pelelangan Proyek • Konsep Perencanaan Tahapan Tahapan Pelaksanaan • Rekayasa Nilai (Value Engineering) • Perumusan Struktur dan Hierarki Proyek • Perencanaan Sumber Daya

  5. Karakteristik Gedung Bertingkat • Pekerjaan Persiapan • Access Road (Jalan Masuk) • Site Plan • Pedoman Pengukuran • Alat Angkat • Pekerjaan Dewatering • Open Plumbing • Predrainage • Cut Off • Pekerjaan Pondasi • Tiang Pancang • Tiang Bor (Bored Pile) • Tiang Franki (Franki Pile) • Raft Foundation

  6. Pekerjaan Galian • Galian Terbuka Tanpa Penahan Tanah • Galian Dengan Penahan • Concrete Diaphragma Wall • Pekerjaan Persiapan • Pekerjaan Galian Diaphragma Wall • Pekerjaan Pembesian Panel Female dan Male • Pekerjaan Pengecoran Panel Female dan Male • Pekerjaan Galian Basement • Struktur Basement • Sistem Konvensional • Sistem Top Down

  7. Pile Cap dan Ground Beam • Sistem Form Work Tradisional • Sistem Form Work Permanen • Struktur Atas • Core Wall / Shear Wall • Climbing Form • Slip Form • Auto Jump Form • Lay Out Auto Jump Form (Tanpa Deck) • Kolom, Balok, dan Pelat / Slab • Kombinasi / Campuran dengan Precast • Precast Half Slab • Hollow Slab • Precast Double Tee Beam / Channel Slab • Precast Tangga • Struktur Beton Precast Penuh

  8. Pekerjaan Finishing • Pasangan Bata (Dinding) • Plesteran Dinding • Dinding Panel Beton • Lantai Tegel • Plafon • Lapisan Dinding Luar • Panel Dinding Luar • Lift Slab Method

  9. Referensi • Asiyanto, Metode Konstruksi Gedung Bertingkat, Penerbit Universitas Indonesia, 2008 • Husen, Abrar, Manajemen Proyek, Penerbit Andi, Yogyakarta, 2011 • R Chudley & R Granero, Building Cosntruction Handbook • Merrit, Frederick, & Ricketts, Jonathan T, Building Design and Construction Handbook