National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power & Port Facilities. Share Holders & Financial Advisors March 2008. Spectrum of Operations. Bauxite Mine. Alumina Refinery. Spectrum of Operations. Aluminium Smelter. Thermal Power Plant.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'National Aluminium Company Limited' - juro


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

National Aluminium Company Limited

Integrated operations : Bauxite – Alumina – Aluminium – Power & Port Facilities

Share Holders & Financial Advisors

March 2008

slide2

Spectrum of Operations

Bauxite Mine

Alumina Refinery

slide3

Spectrum of Operations

Aluminium Smelter

Thermal Power Plant

Port facility

slide4

PAST HIGHLIGHTS

Rs. Crore

SALES

Exports

CAGR 24%

CAGR 15%

Net Profit

Rs.

EPS

CAGR 46%

CAGR 46%

expansion of refinery
EXPANSION OF REFINERY
  • 5TH STREAM OF 7 LAKH MT IN REFINERY FROM YEAR 2012 (TOTAL CAPACITY – 30 LAKH MT)
  • INVESTMENT – Rs 1800 CRORE
slide10

BAUXITE RESERVE

LAKH MT

REQUIREMENT TILL YEAR 2040 - 2853

expansion of smelter
5TH POTLINE OF 1.15 LAKH MT AT ANGUL

INVESTMENT: Rs 1800 CRORE (SMELTER)

Rs 500 CRORE –

1x 120 MW (POWER)

EXPANSION OF SMELTER
5 th potline angul
REQUIREMENT

LAND : 100 HECTARE

POWER : 1.7 MU P.A. (120MW+SURPLUS )

COAL : 8.5 LAKH MT P.A.

ALUMINA: 2.3 LAKH MT

POSITION

LAND : UNDER ACQUISITION BY GOVT

COAL : ADDITIONAL LINKAGE OF 1O LAKH MT REQUIRED

(UTKAL-E COAL BLOCK CAN CATER FOR 17 YEARS ONLY)

5TH POTLINE - ANGUL
background
SURPLUS ALUMINA – 18 LAKH MT

SURPLUS ALUMINA + VALUE ADDITION

NEEDS CAPTIVE POWER

REFINERY or SMELTER- NEEDS BAUXITE / COAL

BACKGROUND
greenfield smelter
SETTING UP 5 LAKH MT SMELTER IN TWO PHASES OF 2.5 LAKH MT EACH

7000MU POWER NEEDED - 1250 MW CAPACITY

CAPTIVE POWER PLANT NEEDS 75 LAKH MT COAL OR 80 BILLION CUBIC FT GAS PER YEAR.

GREENFIELD SMELTER
india orissa
MINES + REFINERY + POWER + SMELTER

REFINERY + POWER + SMELTER

POWER + SMELTER

INDIA (ORISSA)
abroad
SMELTER + POWER (Gas-based)

SMELTER + POWER (Coal-based)

SMELTER (Where power is purchased)

ABROAD

Contd..

abroad1
INDONESIA:

MoU signed with Govt. of South Sumatra. Consultant being engaged in Indonesia to prepare feasibility report.

SAUDI ARABIA:

Discussions on with potential local partner of Gulf for setting up Plants in Saudi Arabia in JV.

ABROAD

Contd..

abroad2
SOUTH AFRICA:

Matter being pursued with South African Govt for JV, with a local Group

IRAN:

Discussions on with a local Company of Iran for JV.

ABROAD
slide22
FLY ASH UTILIZATION

CAUSTIC SODA PROJECT

WIND POWER PROJECT

ALUMINIUM WAGON PROJECT

CT PITCH PROJECT

UP & DOWNSTREAM INTEGRATION

slide23
FLY ASH UTILIZATION: 12 EOI received to utilize fly ash and convert it into saleable products. Under evaluation.

CAUSTIC SODA: 12EOI received for setting up a 50 to 120 K MT plant. Under evaluation.

UP & DOWNSTREAM INTEGRATION

slide24
WIND POWER:

Wind data being collected at Damanjodi.

Target- 50 MW Farm by 2010.

ALUMINIUM WAGON PROJECT:

MOU being signed with BEML for prototype of Aluminium Rail Wagon.

CT PITCH :

Discussion with NINL is on for a JV project.

UP & DOWNSTREAM INTEGRATION

slide25
ALUMINIUM INDUSTRIAL PARK

Park at Angul is proposed to be developed through a Special Purpose Vehicle (SPV) comprising NALCO, IDCO, OSFC, OSIC and other private parties.

UP & DOWNSTREAM INTEGRATION