Mercury Impacted Soil Cleanup at a Natural Gas Processing Facility

Mercury Impacted Soil Cleanup at a Natural Gas Processing Facility. Gilbert J. Van Deventer, REM Trident Environmental PO Box 7624 Midland, Texas 79701 www.trident-environmental.com. Project Elements.

judith
Download Presentation

Mercury Impacted Soil Cleanup at a Natural Gas Processing Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mercury Impacted Soil Cleanup at a Natural Gas Processing Facility Gilbert J. Van Deventer, REM Trident Environmental PO Box 7624 Midland, Texas 79701 www.trident-environmental.com

  2. Project Elements • Disposition of 32 mercury manometer gas flow meters stored in the crawl space of an office at a natural gas processing facility in east Texas • Characterization of mercury-impacted soil in crawl space floor • Remediation of mercury-impacted soil in crawl space

  3. Safety Concerns • Mercury vapors inside crawl space exceed permissible exposure limits (PELs) • Confined space entry procedures must be followed • Level B personal protective equipment (PPE) required • Jerome Model 431X mercury vapor analyzer (MVA) used for monitoring

  4. Vapor Exposure Limits for Mercury

  5. Disposition of 32 mercury manometer gas flow meters • Meters were removed from crawl space • Meter components were disassembled • Mercury bearing components placed in 55-gal. steel drums • Meters were shipped to a permitted facility for recycling

  6. Characterization of MercuryImpacted Soil in Crawl Space • Sample grid pattern established in crawl space based on 5-foot centers (same as steel piers supporting office building) • Composite samples from each grid cell collected were screened with an MVA and submitted to the laboratory for total mercury analysis (EPA Method 7471)

  7. Sampling Grid Pattern

  8. Remediation of MercuryImpacted Soil in Crawl Space • Phase 1: Soil removed using hand shovels • Phase 2: Remaining loose soil removed using industrial vacuum • Phase 3: MerconwashTM (1.5 liters ) mercury vapor suppressant and decontamination liquid applied to floor of crawl space • Phase 4: MerconwashTM (10 liters ) mercury vapor suppressant and decontamination liquid applied to floor of crawl space 8 months after initial remediation activities

  9. MVA Readings Prior to Implementation of Remediation

  10. MVA Readings During Implementation of Remediation

  11. MVA Readings After Completion of Remediation

  12. Total Mercury ConcentrationsAfter Completion of Remediation

  13. MVA Readings After Applicationof 10 liters of Merconwash

  14. Summary of MVA Readings

  15. MVA Readings in Office Above Crawl Space