1 / 4

Toulon’13 Experimental Plan: System Integration and Validation

Join us at Toulon’13 to test acoustic modems, range formation, multibeam & video data collection, and more. Explore cutting-edge technology with ASCs, AUVs, and MORPH. Aim to control range formation and optimize planning.

jovita
Download Presentation

Toulon’13 Experimental Plan: System Integration and Validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toulon’13 Experimental Plan • DATE: 22/07/13 - 27/7/13 • VENUE: IFREMER • PARTNERS: IST, ATLAS, IFREMER, IUT, CMRE, • UdG, CNR • MEANS: • 2 ASCs (Charlie and/or Medusa) • 2 AUVs: (VORTEX and/or Girona500 and/orSparus) • Technologyto be tested: • Acousticmodems, rangeformation • CollectingMultibeam & video Data • Collecting video data fromthe light markers • MORPH MultiNodePlanning Software • Goal: • Rangeformation control • ROF with 3 or 4 vehicles • Online Bathymetrybasedondead-reckoning • Creating MORPH relatedmissionplans and evaluatingtheplanning concept WP7: System Integration and Validation

  2. Toulon’13: Vehicles, Capabilities & Functionalities WP7: System Integration and Validation

  3. Toulon’13: Experimental Site WP7: System Integration and Validation

  4. Toulon’13: Current Status [Done] WP7: System Integration and Validation

More Related