PENGANTAR INSTALASI RADIOMETALURGI (IRM) PowerPoint Presentation
Download Presentation
PENGANTAR INSTALASI RADIOMETALURGI (IRM)

Loading in 2 Seconds...

play fullscreen
1 / 34

PENGANTAR INSTALASI RADIOMETALURGI (IRM) - PowerPoint PPT Presentation


  • 227 Views
  • Uploaded on

PENGANTAR INSTALASI RADIOMETALURGI (IRM). Nur Syamsi Syam , ST, M.Eng . Basic Professional Training Course - BAPETEN Cisarua , 26 Maret 2014. BIODATA. Nama : Nur Syamsi Syam , ST., M.Eng Tempat / Tgl Lahir : Sinjai , 16 September 1980

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'PENGANTAR INSTALASI RADIOMETALURGI (IRM)' - joseph-brewer


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
pengantar instalasi radiometalurgi irm
PENGANTAR INSTALASI RADIOMETALURGI (IRM)

NurSyamsiSyam, ST, M.Eng.

Basic Professional Training Course - BAPETEN

Cisarua, 26 Maret 2014

biodata
BIODATA

Nama : NurSyamsiSyam, ST.,M.Eng

Tempat /TglLahir : Sinjai, 16 September 1980

Unit Kerja : Perizinan INNR, DPIBN (2005 – sekarang)

Jabatan : PengawasRadiasiMuda

e-mail : n.syam@bapeten.go.id

Pendidikan :

1. S1 TeknikNuklir, UniversitasGadjahMada, Yogyakarta, 2003

2. S2 Magister SistemTeknologiEnergi, UGM, 2010

Training Bidang InstalasiNuklir

  • Pelatihan Instalasi Nuklir Nonreaktor-BAPETEN, 2007
  • OJT on Human Induced Event Aspect of NPP siting, US-NRC, USA, 2012
  • Safety of Nuclear Fuel Cycle Facility – IRSN, Perancis, 2013
  • MEXT Research Program, NPP Dismantling Technology, 2013
pokok bahasan

Pendahuluan

  • RiwayatInstalasi
POKOK BAHASAN
  • DeskripsiInstalasi
  • SistemOperasidanSistem Bantu IRM
  • AspekKeselamatan
  • Penutup
riwayat instalasi
RIWAYAT INSTALASI
  • Bagiandariresearch and development facilities for nuclear fuel
  • Dirancang untuk kegiatan pengujian dan pengembangan uji pasca iradiasi (PIE) elemen bakar (MTR, PWR, PHWR) dankomponenreaktorlainnya
  • Desainhotcell: GCNF (German Consortium)
  • Komisioning (1992 – 1993) olehpersonil IRM didampingioleh GCNF, TrubaJurong (M&E) danWaskitaKarya (sipil)
  • Komisioningmenggunakan MTR fuel type (fresh danpascairadiasi R-19)
  • Dioperasikanoleh PTBBN – BATAN dengan I.O. No. 473/IO/Ka-BAPETEN/29-XI/2011 (MB 10 tahun)
deskripsi instalasi
DESKRIPSI INSTALASI
  • FungsidanKegiatan IRM
  • Sistemoperasidanproses
  • Sistem bantu
  • Sistemkeselamatan
fungsi dan kegiatan irm
FUNGSI DAN KEGIATAN IRM
  • menangani sumber radiasiaktivitastinggiberupabahanpascairadiasiseperti BBNB dan bahan target iradiasi.
  • Kegiatan yang telahdilaksanakan:
    • 1993 – 2006: - Rest of U3O8-Al (RI-19)

- PIE U3O8-Al (RI E-01) dan U3Si2-Al (RI SIE-02) - PT Batek

- LEU foil target, produksi Mo-99 (with the ANL-USA)

- Pengembangan BB Silisidatingkatmuattinggi

  • Kegiatan yang direncanakan:
    • Pembuatan standar acuan untuk bahan bakar nuklirUxSiy.
    • Pengambilan Thorium dariMonasit (maksimum 500 gram Thorium)
    • UjisifatmekanikdenganUjitarikspesimen mini.
alur proses pie
ALUR PROSES PIE

ZG 101 (sel

Penerima)

ZG-103(pengu-

jian tak merusak)

ZG-104 (uji

Merusak: metalo

Rafidan

preparasi

sampel)

ZG 102(peme-

riksaan visual

Dan pembong-

karan)

ZG 110-112

(uji mekanik)

ZG 107

(mikroskop

Optik)

ZG 108 dan

109 (uji

Kimia-fisik)

sistem operasi dan proses hotcell
SISTEM OPERASI DAN PROSES (HOTCELL)
  • Concrete Cell (ZG 101, ZG 102, ZG 103)

- Tebal 1,2 m; 2 jendela; 2 pasang manipulator

    • ZG101 : Penerima, terhubungke ISSF
    • ZG102 : Pembongkaran, terhubungke 001 (limbah)
    • ZG103 : UjiTakMerusak
    • Kapasitas: 6 bundel MTR atau 1 batang PWR/BWR atau 1 bundel PHWR (CANDU)
  • Concrete cell 001 tanpa manipulator: Penangananlimbah
slide16

Concrete Cell (001)Limbah

Concrete Cell (101)

sistem operasi dan proses hotcell1
SISTEM OPERASI DAN PROSES (HOTCELL)
  • ZG-104 s/d ZG-106:
    • Preparasispesimen, MikroskopOptikdan storage
  • ZG-107: MikroskopOptik & Mikro hardness
  • ZG 108 dan ZG 109: Radiokimia
  • ZG 110 dan ZG 111: Ujisifat-sifatmekanik
  • ZG 112: Preparasispesimen SEM/TEM & gamma auto-radiography
sistem operasi dan proses hotcell2
SISTEM OPERASI DAN PROSES (HOTCELL)
  • ZG-104 s/d ZG-107:
    • elemen bakar PWR/BWR, panjang sampel, 50 mm
    • pelat elemen bakar MTR, panjang sampel, 33 mm
  • ZG-108 s/d ZG-112:
    • elemen bakar PWR/BWR, panjang sampel 22 mm
    • p.e.b MTR 30, panjang sampel 10 mm
    • e.b tipe CANDU, panjang sampel 14,5 mm
slide21

Layout IRM

OPERATING AREA

Hatch to service area

101

102

103

ENTRANCE HALL

104

Hatch to basement

105

TEM ROOM

Conveyor line-2

SERVICE AREA

106

108

109

110

111

112

107

Conveyor line-1

SEM ROOM

Glove box

OPERATING AREA

Rabbit System to Glove Boxes

kelompok peralatan proses
KELOMPOK PERALATAN PROSES
  • Peralatan Transfer/penanganan:
    • manipulator, power manipulator, incell crane, konveyor, roller conveyor dll
  • PeralatanUji (didalamdandiluar hot cell)
    • Ujimetalografi, radiokimia, dll
  • Peralatanpenyimpanan
    • rak, drum, can bertimbal dan lainnya.
laboratorium uji
LABORATORIUM UJI
  • Selainperalatanujidalamhotcell, IRM memiliki:
    • Laboratoriumkeaktifansedang
      • R135  fumehooddanglovebox
    • Laboratoriumkeaktifanrendah
      • R136, R127, R132, R133, R134, R171, R139, R142, R220, R206, R212
      • Berbagaiperalatanuji, glovebox, fumehood
sistem bantu 1
SISTEM BANTU (1)
  • Sistemcatudayalistrik
    • Normal (PLN), darurat (Genset), UPS (rusak, menggunakanlampudarurat)
  • Sistemventilasi (VAC)
    • Subsistemudaramasuk
      • intake grill & filter, supply fan, koilpendingin
    • Subsistemudarabuang
      • dua lapis filter HEPA, exhaust fan, dancerobong
    • Subsistem air dingin
      • chiller, pompasirkulasi, koilpendingindantangkiekspansi
    • Subsistemtataudaraperkantoran,
      • AHU, FCU (Fan Coil Unit), pompa booster, dan fan AHU
sistem bantu 2
SISTEM BANTU (2)
  • SistemPemasok Air
    • Air domestik (proses, pendingin, sanitasi)
    • Air pendinginlaboratorium
  • SistemUdaraTekan
    • proses (service area, beberapa lab., dansemuahotcell, ruang exhaust, ruangujimekanik, danruang supply air)
    • Instrumentasi (pneumatic damper, instrumenpada
    • Dihasilkandari 3 kompressorutamadan 1darurat
  • Sistemkomunikasi
aspek keselamatan innr
ASPEK KESELAMATAN INNR

Kejadian abnormal dapatterjadikarena :

  • Kegagalanfungsialat
  • Kesalahanmanusia
  • Penyimpanganprosedur

Contohkejadian abnormal : kegagalanventilasikarenakegagalansistem chiller atau blower dankondisi filter yang jenuh

JenisKecelakaandi INNR :

  • Kekritisan
  • Bebanmekanis
  • Kebakaran
  • Ledakan
hasil analisis bahaya irm
HasilAnalisisBahaya IRM

Kekritisandicegahdenganmengaturjarakpadarakpenyimpanan

Kecelakaanterparah:

Jatuhnya BB nuklir

ssk keselamatan
SSK KESELAMATAN
  • Hotcell, perisaipadahotcell
  • Rakpenyimpanbahanbakardanwadahpengungkung ZRA lainnya
  • Sistemventilasi
penutup
PENUTUP
  • Sistem-sistemdi IRM:
    • Sistemoperasidanproses
    • Sistem Bantu
    • SistemKeselamatan
  • KegiatanUtama IRM: pengujianpascairadiasidalamhotcelldanpengembangandibidangteknologibahanbakarlainnya
  • Aspekkeselamatan IRM:
    • SSK Keselamatan
    • Analisisbahaya
    • Analisiskecelakaan