An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introductory Accounting B B11-A291 / B11-A027 Mark Binder, CA Chapter 12

  2. Learning Objectives • Describe capital assets and issues in accounting for them. • Apply the cost principle to compute the cost of capital assets • Explain, record and calculate amortization using the straight line, units of production and double declining balance • Explain and calculate amortization for partial years • Explain and calculate revised amortization • Account for asset disposal through discarding, selling or exchanging an asset • Discuss the accounting for natural resources and their amortization

  3. Capital Assets • If a company has capital assets they usually are the largest group of assets they have. • Most companies have some capital assets which make them very significant. • Capital assets have a useful life of more than 1 year or 1 accounting cycle, unlike current assets.

  4. Cost of a Capital Asset • Capital assets are recorded at cost which is consistent with the cost principle. • Cost include all costs which are reasonable and necessary. • Reasonable and necessary can be interpreted as normal and necessary.

  5. Factory Equipment • Cost of factory equipment includes: • Invoice cost (less any discount). • Freight. • Unpacking costs. • Assembly costs. • Installation costs. • Testing and adjustment costs.

  6. Land • Cost of land includes: • Cost of land. • Real estate commissions. • Insuring title. • Legal fees. • Accrued property taxes.

  7. Land • Cost of land can also include: • Surveying costs. • Clearing costs. • Grading costs. • Draining costs. • Landscaping costs.

  8. Land • Sometimes when land is purchased special assessments can be issued by the municipality. • These would also be included in the cost of the land. • Examples of this include: • Roadways. • Sidewalks. • Sewers.

  9. Land With Building • Frequently, land is purchased with a building already on it. • If the purchaser has not intent to use the building, the total cost of the land with the building is considered to be the cost of the land. • In this case the purchaser usually plans on demolishing the building.

  10. Land With Building • In such a case the cost of the land will include: • Cost of the land. • Cost of the building. • Removal costs less any salvage value for materials.

  11. Land With Building • Assume a company buys a downtown site for $100,000. • The site has a number of condemned buildings on it. • The removal costs of the condemned buildings is $22,000. • The material from the condemned buildings has a salvage value of $2,000. • There are also brokerage fees of $5,000, legal fees of $3,000 and $2,000 of land title costs.

  12. Land With Building • The total cost of the land in this case is: Site costs $100,000 Condemned building removal costs $22,000 Salvage value of material ($2,000) Brokerage fees $5,000 Legal fees $3,000 Land title costs $2,000 Total land costs $130,000

  13. Land Improvements • Land is presumed to have an intrinsic cost and is not amortized. • However, improvements to land such as parking lots are amortized. • These costs are usually put into an account called land improvements.

  14. Land Improvements • Land Improvements would include: • Surfacing costs. • Driveways. • Fences. • Lighting and security systems.

  15. Buildings • Cost of a building can include: • Purchase price. • Brokerage fee. • Taxes. • Title fees. • Legal costs. • Real estate agency costs.

  16. Buildings • Other costs of the building include: • Renovations. • Wiring. • Lighting. • Flooring. • Wall coverings.

  17. Buildings • When a company constructs a building for it’s own use indirect overhead costs such as: • Heat. • Lighting. • Power. • Amortization of machinery.

  18. Buildings • Cost of construction can also include: • Design fees. • Building permits. • Insurance (during construction) • Interest (during construction). • The book does not include interest but it is commonly included. • Once a building is complete costs such as insurance and interest are considered operating costs.

  19. Machinery and Equipment • Machinery and Equipment typically includes the following: • Purchase price (less any discount). • Taxes (except GST). • Transportation costs. • Insurance costs (While being transported). • Installation, testing and assembly.

  20. Lump Sum Purchase • Often when a purchase is done the cost is not split between the building and the land. • It is important to split the costs because land is not amortized while the cost of the building is. • Assume a company purchases land and building for $100,000.

  21. Lump Sum Purchase • The land is appraised as $50,000 and the building is appraised as $75,000. • Notice the total appraisal cost is greater than the purchase price. • Frequently the appraisal costs will not equal the purchase price of land and building. • See excel spreadsheet.

  22. Capital Assets • Capital Assets have useful lives of more than one year. • The matching principle demands that the usefulness used in each accounting period be recorded. • We call this process amortization. • In the past this process was called depreciation and depletion in the case of natural resources.

  23. Capital Assets • These terms are still used but less frequently than the general term amortization. • Three factors are needed when computing amortization: • Cost • Salvage value. • Useful or service life

  24. Cost • Discussed previously. • All costs reasonable and necessary.

  25. Salvage Value • An estimate of the value at the end of it’s useful life.

  26. Useful or Service Life • The useful or service life is the length of time the asset will be used in the company’s operation. • It is not necessarily the total productive life of the asset. • The Useful or Service life is dependent on company policy.

  27. Useful or Service Life • Some companies use assets till they fall apart. • This would indicate a useful life similar to the productive life of the asset. • Other companies frequently replace their assets. • In such a case the useful life would be much smaller than the productive life.

  28. Factors to Consider • In estimating useful life you should consider: • Inadequacy – A company grows more rapidly than expected and the asset is no longer adequate for the company. • Obsolescence – technology has made asset no longer useful to the organization.

  29. Inadequacy and Obsolescence • Both are difficult to predict. • Usually companies will rely on past experience, engineering studies, standards in industry to estimate useful life. • It is possible that two companies with identical assets will have very different estimates of useful life.

  30. Amortization • There are many methods of amortization. • We will examine 3: • Straight line. • Units of Production. • Double Declining Balance.

  31. Straight Line • In straight line amortization the amount does not change from one year to the next. • For example, assume a semi-trailer has a cost of $100,000 with a salvage value of $25,000 and a useful life of 5 years.

  32. Straight Line • The formula for straight line is: Cost – Salvage value = annual amortization useful life • In our example: $100,000 – $25,000 = $15,000 per year 5 years

  33. Straight Line • The journal entry is: Dr: Amortization expense. semi-trailer $15,000. Cr: Accumulated amortization. semi-trailer $15,000. • Accumulated amortization is a contra asset like the allowance for doubtful accounts.

  34. Straight Line • Virtually all assets will have a unique accumulated amortization account. • In straight line amortization the expense remains the same from one year to the next. • The book value (cost – accumulated amortization) declines along a straight line. • The book value stops at the salvage value. • Amortization never continues past the salvage value.

  35. Units of Production • The Units of production method is in many ways similar to straight line. • In both cases we divide the cost less salvage value by the estimate of useful life. • In straight line the estimate is in years. • In units of production it is in units. • So, we need to be able to estimate the useful life of the asset in units to be produced.

  36. Units of Production • Assume we have just purchased a digital copier with an estimated useful life of 1,500,000 copies. • The copier cost $40,000 and has an estimated salvage value of $10,000. • The units of production method is a two step process.

  37. Units of Production • Compute the amortization per unit. • Multiply the amortization per unit (step 1) x number of units used in the current period.

  38. Amortization Per Unit • Amortization per unit = Cost- Salvage value Total units of production Amortization per unit = $40,000 - $10,000 1,500,000 Amortization per unit = $0.20 per copy

  39. Step 2 • Multiply amortization per unit by the number of units produced in the period. • If the copy had 400,000 copies in the year the amortization would be computed as: • 400,000 x $0.20 = $8,000.

  40. Declining Balance Method • There are many declining balance methods. • The one we will examine is called double declining balance. • This is very similar to the method used for tax purposes in Canada. • It is called an ‘accelerated method’ because it gives higher amortization in the early years of use.

  41. Three Step Process Assume our prior example of the semi trailer which cost $100,000 with an estimated life of 5 years. • Compute the straight line amortization rate. 100% / useful life = Straight line rate. 100% / 5 = 20%.

  42. Three Step Process • Step 2: take the rate in step 1 and double it. • This is why it is called ‘double’ declining balance. • In our case 20% x 2 = 40%.

  43. Three Step Process • Amortization expense = double declining balance rate x beginning of period book value. • In our case in year 1 40% x $100,000 = $40,000 • See excel spreadsheet for remaining years.

  44. Salvage Value • As mentioned the salvage value is the estimate of the value of the asset when the company plans on disposing it. • Therefore total amortization expense over the life of the asset cannot be more that the Cost – Salvage value.

  45. Salvage Value • Put in another way, the book value (cost – accumulated amortization) cannot be below salvage value. • This can cause problems with both the double declining method and the units of production methods.

  46. Salvage Value • If the total units over the useful life is more than the estimate in units of production the amortization expense could become larger than cost – salvage value. • In other words the book value could be below the salvage value.

  47. Salvage Value • The same thing can happen with double declining balance depending on the salvage value. • The solution to this problem is to only take amortization to the point where the book value is equal to salvage value. • Frequently, this creates a ‘plug’ in the final year.

  48. Complications • There are two complications to the basic amortization problem: • Purchase in the middle of the year. • Revising rates

  49. Purchase in the Middle of the Year • If an asset is purchased in the middle of the year the amount of amortization needs to be ‘pro-rated’ for the amount of the year the asset was owned. • In our semi-trailer example we had amortization expense per year of $15,000.

  50. Purchase in the Middle of the Year • If we purchased the asset on August 31 our first year amortization would be: $15,000 x 4/12 = $5,000. • In following years under straight line it would be $15,000 each year. • We have to do the same ‘pro-rated’ calculation for double declining balance.