slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT PowerPoint Presentation
Download Presentation
THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT

Loading in 2 Seconds...

play fullscreen
1 / 21

THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT - PowerPoint PPT Presentation


  • 352 Views
  • Uploaded on

THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT OF NAMIBE TYPE OF CARGO HANDLING EQUIPMENT TRAFFIC MAIN CONSTRAINTS ACTION PLAN Total length of main roads in Angola is 15,500 km, including 7,950 km of paved road;

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT' - johana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

THE COUNTRY

  • ROAD TRANSPORT SYSTEM
  • AIR TRANSPORT SYSTEM
  • RAILWAYS SYSTEM
  • PORT LOCATION
  • PORT OF LUANDA
  • PORT OF LOBITO
  • PORT OF NAMIBE
  • TYPE OF CARGO HANDLING EQUIPMENT
  • TRAFFIC
  • MAIN CONSTRAINTS
  • ACTION PLAN
slide4

Total length of main roads in Angola is 15,500 km, including 7,950 km of paved road;

  • Major roads are administrated by the Instituto de Estradas de Angola (INEA).
slide5

Mainairport

    • Themainairports are locatedinthe provincial capitals
  • Otherairport
    • Thesmalltowns are servedbysmallairstrips
  • Fleets
    • PUBLIC
      • TAAG
      • SONAIR
    • PRIVATE
      • Some privatecompanyoperatenationalwide
slide6

CFL CFB CFN

TOTAL LENGTH OF CFL 424 Km TOTAL LENGTH OF CFB 1336 Km TOTAL LENGTH OF CFN 756 Km

slide7

MAIN PORTS

    • Luanda
    • Lobito
    • Namibe
  • SECONDARY PORTS
    • Cabinda
    • Soyo
    • Porto Amboim
slide8

Total quay length 3200 m

Depth 3,5-12,5 m

Total area 150 Ha

slide9

Total quay length 1220 m

Deph 3,5-10,5 m

Total area 11 Ha

slide10

Total quaylength 800 m

Depth 3-10,5 m

Total areaxxxxHa

slide11

Alltheseportshavealmostthesametypeofequipment

    • Tugboats
    • Quaycranes (3-22 ton)
    • Mobile cranes
    • Floatingcranesof 120 ton (Lobito)
    • Craneshiploaderof 200 ton/h
    • Reach-stacker 40-45 ton
    • Top lift 40 ton
    • Forklift 2,5-40 ton
slide12

Ships arrival and departure

Average ship days in the port

Container traffic 2007

slide14

2008 FIRST SEMESTER TRAFFIC

  • Total Traffic : 3.168.934 Tons
  • Containers : 287.298 Teus
  • Vehicle : 27.886
  • 2.056 vessels called the port during the first semester of 2008 among which 366 deep sea vessels
  • The remaining ones are caostal and oils activities suppliers
  • An increase of 27 % in comparison to the same period of 2007
slide15

Comments

  • The arrival rate of two (2) ships per day
  • The average of seven movement / hour /ship
  • Five dedicated berths for containers
  • 785 teus/ship
  • Six days (6) service time/ship
  • An average of 31 ships waiting for berth per month
slide16

Fewinfrastruture;

  • Lackofappropriatehandlingequipment for container;
  • Lowproductivity;
  • PoorManagement;
  • Labourintensive;
  • Interface portcity (allourport are locatedintown centre);
  • Heavyadministrativeclearingprocess;
  • Nongeneralise use of I.T. inports.
slide17

Demurrage of ships in the ports and related surcharges;

    • Higher dwell time of container/cargo in the port
slide18

IMMEDIATE ACTIONS

  • Create extra port stacking capacities ;
  • Improve the management of container through the introduction of I.T. in all terminals and training of staff and labour;
  • Purchase of appropriate handling equipment
  • Reduce the allowed free time of container in the ports
  • Involve private sector in port commercial activities
slide19

MEDIUM AND LONG TERM ACTIONS

  • Increase storage capacity;
  • Install specialised handling equipment (especially container gantry cranes);
  • Providing extra quay length for vessel berths;
  • Operational issues;
  • Delocating the port and putting in place specialised terminals
slide20

NEW PROJECTS

PORT OF LUANDA

  • Construction of a new port in Barra do Dande
slide21

NEW PROJECTS (CONT)

PORT OF LOBITO

  • Rehabilitation and extension of the port