400 kv d c gazuwaka nunna line n.
Download
Skip this Video
Download Presentation
400 KV D/C GAZUWAKA-NUNNA LINE

Loading in 2 Seconds...

play fullscreen
1 / 3

400 KV D/C GAZUWAKA-NUNNA LINE - PowerPoint PPT Presentation


  • 80 Views
  • Uploaded on

400 KV D/C GAZUWAKA-NUNNA LINE. COMMISSIONING AND ADVANTAGES. COMMISSIONING HIGHLIGHTS. GAZUWAKA-NUNNA-II CHARGED FROM GAZUWAKA END AT 1626 ON 26/02/05 AND SYNCHRONISED AT NUNNA AT 1652 HRS GAZUWAKA-NUNNA-III CHARGED FROM GAZUWAKA END AT 2303 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 2315 HRS.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '400 KV D/C GAZUWAKA-NUNNA LINE' - joelle-gomez


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
400 kv d c gazuwaka nunna line

400 KV D/C GAZUWAKA-NUNNA LINE

COMMISSIONING AND ADVANTAGES

commissioning highlights
COMMISSIONING HIGHLIGHTS
  • GAZUWAKA-NUNNA-II CHARGED FROM GAZUWAKA END AT 1626 ON 26/02/05 AND SYNCHRONISED AT NUNNA AT 1652 HRS
  • GAZUWAKA-NUNNA-III CHARGED FROM GAZUWAKA END AT 2303 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 2315 HRS
advantages of the line
ADVANTAGES OF THE LINE
  • PLANNED FOR EVACUATION OF POWER FROM POLE 2 AT GAZUWAKA
  • ALLEVIATED THE LOADING AND LOAD ANGLE ON THE S/C 400 KV GAZUWAKA-NUNNA LINE
  • IMPROVED THE EVACUATION OF SIMHADRI AS WELL AS GAZUWAKA IMPORT
  • LOSSES REDUCED BY 8 MW WITH FULL GENERATION AT SIMHADRI AND 500 MW IMPORT AT GAZUWAKA
  • IMPROVED STABILITY IN N.COASTAL AP AREA