1 / 87

113th Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks

113th Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks. Closing Report March 4-9, 2018 Hyatt Regency Rosemont Rosemont, IL, USA. 802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, Linespeed Pat Kinney, Kinney Consulting.

jgeise
Download Presentation

113th Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 113th Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks Closing Report March 4-9, 2018 Hyatt Regency Rosemont Rosemont, IL, USA Robert F. Heile, Wi-SUN Alliance

  2. 802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, Linespeed Pat Kinney, Kinney Consulting 802.15 Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 • STUDY GROUPS: • INTEREST GROUPS • IG TeraHertz (THZ) • Chair: Thomas Kürner, • Technische Universität Braunschweig • IG Dependability (of Radio Links) • Chair: Ryuji Kohno, • IG High Rate Rail Communications • Chair: Junhyeong Kim, ETRI • IG Vehicular Assistive Technology • ChairYeong Min Jang, KookminUni • IG 15.4 Guide • Chair: TBD • STANDING COMMITTEES • SC IETF • Chair: Pat Kinney, Kinney Consulting • SC WNG • Chair:: Pat Kinney, Kinney Consulting • SC Maintenance / Rules • Chair:: Pat Kinney, Kinney Consulting • On Hold: TG4r 15.4 ranging Working Group Technical Editor James Gilb Task Groups TG4md 15.4 Revision Chair: Gary Stuebing, Cisco TG7m Optical Wireless Communications Yeong Min Jang, Kookmin University Chair • TG4w 15.4 Low Power Wide Area (LPWA) • Chari: Robert, Jörg • Friedrich-Alexander-Universität TG10a Routing Mode Addressing (RMA) Chair: Charlie Perkins, Futurwei TG4x Fan Enhancements (FANE) Chair: Matt Gilmore, Itron TG12 Consolidated ULI Chair: Pat Kinney, Kinney Consulting TG4y Security Next Gen (SECN) Chair: Don Sturek, Itron TG13 Gigbit OWC Chair: Volker Jungnickel Fraunhofer Heinrich Hertz Institute TG4z 15.4 Enhanced Impulse Radio (EIR) Chair: Tim Harrington, Pro-ID Robert F. Heile, Wi-SUN Alliance

  3. Chicago Session ObjectivesMarch 4-9, 2018 TASK GROUP 4w –LPWA Enhancements to LECIM PHYs • Secure Approval on PAR/CSD • Begin organizing work activity and time line TASK GROUP 4x –FAN Enhancements to the SUN PHYs • Secure Approval on PAR/CSD • Begin organizing work activity and time line TASK GROUP 4y –Security Next Generation (SECN) • Secure Approval on PAR/CSD • Begin organizing work activity and time line TASK GROUP 4z –Enhanced Impulse Radio (EIR) • Secure Approval on PAR/CSD • Begin organizing work activity and time line Robert F. Heile, Wi-SUN Alliance

  4. Chicago Session ObjectivesMarch 4-9, 2018 TASK GROUP 15.4md –Revision 4 • Organize Plan for outside comments on roll-up • Prepare ad hoc WG Letter Ballot • Seek input on corrections, changes, and areas for possible deprecation Task Group 7m Revision 1 OWC • Finish up WG Letter Ballot comment resolution • Seek WG/EC approval to start Sponsor Ballot • Generate/Update Project Timeline TASK GROUP-10a Routing Mode Addressing (RMA) • Collect contribution for completing the routing mode addressing schemes • Update Project Plan/Timeline Robert F. Heile, Wi-SUN Alliance

  5. Chicago Session ObjectivesMarch 4-9, 2018 TASK GROUP 12 -15.4 Upper Layer Interface (ULI) • Review and discuss responses to CFP • continue work on architecture/content • Update Project Plan/Timeline TASK GROUP 13 –Multi Gigabit/sec OWC • Work on ballotable draft • Update Project Plan/Timeline Robert F. Heile, Wi-SUN Alliance

  6. Chicago Session ObjectivesMarch 4-9, 2018 Dependability (DEP) Interest Group: • Discuss Contributions • Hold tutorial at 802.15 WNG session • Evaluate if Study Group is warranted High Rate Railroad Communications (HRRC) IG • Discuss opportunities for standards work • Review ongoing mission of the group Vehicular Assistive Technology (VAT) IG: • Discuss opportunities for OWC standards work for V2V and V2B communications THz Interest Group: • Ongoing review of THz technology advancements Robert F. Heile, Wi-SUN Alliance

  7. Chicago Session ObjectivesMarch 4-9, 2018 IETF Standing Committee • IETF101 Preparation • Hear contributions • Next steps NEW PROJECTS STANDING COMMITTEE (WNG) • Review/discuss contributions MAINTENANCE STANDING COMMITTEE • Review/discuss contributions RULES STANDING COMMITTEE • Review/discuss contributions Robert F. Heile, Wi-SUN Alliance

  8. Robert F. Heile, Wi-SUN Alliance

  9. Upcoming Sessions • May 6-11, 2018, Warsaw Marriott, Warsaw Poland802 Wireless Interim Session. • July 8-13, 2018, Manchester Grand Hyatt, San Diego, CA, USA, 802 Plenary Session. • September 9-14,  2018, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session.* • November 11-16, 2018, Marriott Marquis Bangkok,802 Plenary Session. • January 13-18, 2019 TBD Hilton Ballpark St Louis (TBC) • March • May 12-17, 2019, Grand Hyatt Atlanta in Buckhead , Atlanta, Georgia, USA • July • September 2019 - Marriott Hanoi/ Centara Bangkok/Marriott City Center Shanghai Robert F. Heile, Wi-SUN Alliance

  10. 802.15 SG4w LPWAMarch 2018 Plenary Closing Report Joerg RobertFAU Erlangen-Nuernberg Joerg Robert, FAU Erlangen-Nuernberg

  11. Main Agenda Items for the Week • 802.15.4w Future Schedule • Call for Proposals • Technical Guidance Document • Liaison with ETSI LTN • IETF SCHC • PAR/CSD Comments Joerg Robert, FAU Erlangen-Nuernberg

  12. Meeting Achievements • Four sessions (Monday-Thursday, PM1) • Responded to comments on PAR/CSD • Finished and agreed on Call for Proposals • Finished and agreed on Technical Guidance Document • Discussion on liaison to ETSI LTN • Discussion and contribution on static context header compression Joerg Robert, FAU Erlangen-Nuernberg

  13. PAR/CSD Comment Resolution • Received comments on PAR and CSD from 802.3, 802.11, and James Gilb • Most comments were editorial • All comments were resolved (15-18/133r3) • Comments were included in revised PAR (15-18/50r6) and CSD (15-18/53r4) document Joerg Robert, FAU Erlangen-Nuernberg

  14. Call for Proposals / Technical Guidance Document • Group finished discussion on Call for Proposals (CfP) and Technical Guidance Document (TGD) • CfP and TGD were approved by the SG 802.15.4w • Final documents are available in 15-18/147r0 and 15-18/93r4 Joerg Robert, FAU Erlangen-Nuernberg

  15. Liaison to ETSI LTN • SG LPWA agreed on starting the process to create liaison to ETSI LTN • Liaison between ETSI and IEEE is covered under exiting MoU, which has to be extended • Additional details will be discussed during May interim Joerg Robert, FAU Erlangen-Nuernberg

  16. Static Context Header Compression • IETF is working on IPv6 Static Context Header Compression (SCHC) • SCHC is optimized for LPWAN and highly relevant for 802.15.4w • Group agreed to provide input to IETF working group related to 802.15.4 Joerg Robert, FAU Erlangen-Nuernberg

  17. 802.15.4w Schedule Joerg Robert, FAU Erlangen-Nuernberg

  18. Telcos and Meeting Minutes • No telephone conferences planned before May interim • Meeting minutes are available in document 15-18/150r0 (special thanks to Charlie) Joerg Robert, FAU Erlangen-Nuernberg

  19. WG 802.15 Motion WG Motion: request that the PAR and CSD contained in documents 15-18-0050-06 and 15-18-0053-04, respectively updated from resolved comments in 15-18-0133-03, be approved by the IEEE 802.15 WG and that the EC be requested to forward the PAR to NesCom. The 802.15 working group chair and technical editor are authorized to make additional modifications to the PAR and CSD as needed to reflect EC discussion at its closing meeting. Moved by: Joerg Robert Seconded by: Y / N / A: Joerg Robert, FAU Erlangen-Nuernberg

  20. Thank You! Any Questions? Joerg Robert, FAU Erlangen-Nuernberg

  21. SG-FANE Closing report March 8, 2018 Matt Gillmore SG-FANE Chair Matt Gillmore (Itron)

  22. PAR & CSD comment resolution complete • 14 comments received • 802.11 • 802.3 • James Gilb (EC) Matt Gillmore (Itron)

  23. Proposals • https://mentor.ieee.org/802.15/dcn/18/15-18-0130-00-004x-phy-proposal-for-supporting-up-to-2-4mb-s-data-rates-and-long-range-modes-in-15-4.pdf • Includes OFDM SUN PHY Option 1 and SUN OFDM PHY Option 2 higher data rates • Clarifies OQPSK 100 k/chips/s modes of operation in additional markets • Awaiting other proposals if supplied Matt Gillmore (Itron)

  24. IEEE 802.15.4y SECN Closing report March 8, 2018 Don Sturek IEEE 802.15.4y SECN Chair Don Sturek (Itron)

  25. Proposals • Heard 3 proposals: • 15-18-0109-01 – Algorithm Agility without Frame Changes –TeroKivinen • 15-18-0095-00 – Frame Signaling Options for Security Extensions – Ben Rolfe • 15-18-0087-00 –Itron Proposal for Enhanced Security – Don Sturek Don Sturek (Itron)

  26. Timeline • Timeline for proposals: • March 2018 – New proposals • (New) May 2018 – Align existing proposals • July 2018 – Revised or new proposals • Decide on a proposal at the San Diego meeting • Scope out amendment changes in San Diego • Create timeline for project completion Don Sturek (Itron)

  27. PAR & CSD are complete • Addressed EC comments • Submitted comment resolution for PAR comments – 15-18-0135-01 • Updated CSD to match PAR comment resolution – 15-18-0040-07 Don Sturek (Itron)

  28. May Interim • Scheduled 2 session • Align existing proposals ahead of San Diego Don Sturek (Itron)

  29. WG approval of PAR and CSD Request that the PAR and CSD contained in documents 15-18-0037-04 and 15-18-0040-07, respectively, be approved by the IEEE 802.15 WG and that the EC be requested to forward the PAR to NesCom. The 802.15 working group chair and technical editor are authorized to make additional modifications to the PAR and CSD as needed to reflect EC discussion at its closing meeting. Moved by: Don Sturek Seconded by: YES: NO: ABSTAIN: Don Sturek (Itron))

  30. IEEE 802.15.4z EIR Closing report March 8, 2018 Tim Harrington IEEE 802.15.4z EIR Chair Tim Harrington (Pro-ID)

  31. Proposals • 3 proposals were presented: • 15-18-0103-00-004z-lrp-uwb-phy-enhancements– David Barras • 15-18-0107-00-004z-secure-rf-ranging– Frank Leong • 15-18-0108-00-004z-hrp-uwb-phy-enhancements – Billy Verso Tim Harrington (Pro-ID)

  32. Timeline • Timeline: • March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD • May 2018 – Align existing proposals and begin drafting • July 2018 – 1st letter ballot • September 2018 – Comment resolution Tim Harrington (Pro-ID)

  33. PAR & CSD are complete • Comments Resolved from: • Comments received from 802.3 (6) • Comments received from 802.11 (6) • Comments received from James Gilb (3) • Submitted comment resolution for PAR & CSD comments – 15-18-0112-04-004z • Updated CSD to match PAR comment resolution – 15-18-0036-03-0000 Tim Harrington (Pro-ID)

  34. May Interim • Scheduled 8 session • Align existing proposals and begin drafting Tim Harrington (Pro-ID)

  35. 802.15.4MDClosing Report March 2018 Interim Plenary Gary Stuebing Cisco Gary Stuebing, Cisco Systems

  36. 15.4md Sessions this Week Gary Stuebing, Cisco Systems

  37. Reflector has been set-up Reviewed latest Roll-up Copy placed in Private area and email sent Watermarked version being setup at IEEE for review by outside Alliances and SDO’s for review Included Amendments: 802.15.4n802.15.4q802.15.4u 802.15.4t  802.15.4v802.15.4s802.15.4- Corrigendum Accomplishments - 1 Gary Stuebing, Cisco Systems

  38. Confirmed list of outside Alliances and Associations Wi-Sun ZigBee Thread ISA 100Wireless HART WIA TIA TR-51ISO/iEC JTC1/SC31/WG4/JUTAChairs at IETF ETSI TG28 TG34-?IEEE 1901.1+2 OMA Lightweight M2M Drafted Invitation for Pre-Ballot Comments Elected Task Group Officers Don Sturek – Vice Chair Kunal Shaw – Technical Editor/Secretary Reviewed Timeline Accomplishments - 2 Gary Stuebing, Cisco Systems

  39. Mar 2018 Interim (Chicago) Introduction to Roll Up and Next Steps Draft and Issue Pre-Ballot Letter to interested parties May 2018 Interim (Warsaw) Review submitted Pre-ballot comments Resolve, where possible Propose Letter Ballot – Finish before San Diego July 2018 Plenary (San Diego) Comment resolution Form BRC Sept 2018 Interim (Waikoloa) Comment Resolution Nov 2018 Plenary (Bangkok) Comment Resolution Recirc ballot Proposed Timeline Gary Stuebing, Cisco Systems

  40. Jan 2019 (TBD) Comment resolution Recirc ballot Mar 2019 (Vancouver) Comment resolution Sponsor Ballot May 2019 (Atlanta) Comment Resolution July 2019 (Vienna) Comment Resolution Recirc Sep 2019 (Asia) Comment Resolution Nov 2019 (Kona) Submit to Revcom – and party like its 2020 (because 15.4-2020 sounds cool) Proposed Timeline Gary Stuebing, Cisco Systems

  41. Submission Title: 15.7m Closing Report March 2018 Date Submitted: March 2018 Source: Rick Roberts Company: Intel Rick Roberts, Intel

  42. TG7m has conducted a working group letter ballot & recirculation ballot Recirc plus carryovers LB147 Results are converging in the right direction. Rick Roberts, Intel

  43. Status of comments at the end of March Meeting • Had 280 comments from Letter Ballot 148 • Resolved all comment resolutions but … • 44 comments will need additional attention by the BRC due to lack of expertise at March meeting • Most all of these problematic comments directed towards MAC legacy text from 802.15.7-2011 Rick Roberts, Intel

  44. Must Satisfy LB147 (original) LB148 (recirc) Must Satisfy: 254 comments Accepted: 205 Rejected: 49 Must Satisfy: 262 comments Accepted: 203 Rejected: 59 Rick Roberts, Intel

  45. Plans for May meeting • Sponsor Ballot comment resolution • Requesting 8 sessions Rick Roberts, Intel

  46. Task Group Motion #1 802.15.7m requests that the working group request conditional approval from the EC to submit P802.15.7m_D2 (as edited in accordance with the instructions in document 15-18-0080-04-007a) to Sponsor Ballot. Passed Unanimously Rick Roberts, Intel

  47. TG Motion #2: Motion for TG Approval to Form a TG7m BRC. TG7m requests that 802.15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P802-15-7m_LB D01 with the following membership: Yeong Min Jang, Rick Roberts, Soo-Young Chang, Vinay Mariappan, Van Trang Nguyen and Ben Rolfe. The 802.15 TG7m BRC is authorized to approve comment resolutions and to approve the start of sponsor ballots of the revised draft on behalf of the 802.15 WG. Passed Unanimously Rick Roberts, Intel

  48. 802.15.7 Revision 1 to Sponsor Ballot(unconditional) Rick Roberts, Intel

  49. 802.15.7 Rev1 Letter Ballot History • Initial Letter Ballot (LB147) • Opened: November 30, 2017, • Closed: January 9, 2018 • Vote results (pool of 66 voters) • 43 responses (66% response ratio) • 43 yes, 5 no (85.71% approval ratio) • 8 abstain (18.6%) • 313 comments from 10 commenters • 262 marked as MBS • Comment resolution database worksheet: https://mentor.ieee.org/802.15/dcn/18/15-18-0008-04-007a-lb147-combined-comments.xlsx Rick Roberts, Intel

  50. 802.15.7 Rev1 Letter Ballot History • Letter Ballot Recirc 1: (LB148) • Opened: 06-Feb-2018 • Closed: 21-Feb-2018 • Vote results (pool of 65 voters) • 49 responses (75.38% response ratio) • 37 yes, 4 no (90.24% approval ratio) • 8 abstain (16.33%) • 280 comments from 7 commenter • 254 marked as MBS • Comment resolution database worksheet: • https://mentor.ieee.org/802.15/dcn/18/15-18-0080-04-007a-combined-comments-lb148.xlsx Rick Roberts, Intel

More Related