new airport in dnepropetrovsk city n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
new airport in dnepropetrovsk city PowerPoint Presentation
Download Presentation
new airport in dnepropetrovsk city

Loading in 2 Seconds...

play fullscreen
1 / 19

new airport in dnepropetrovsk city - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

new airport in dnepropetrovsk city. We intend to clarify main problems to maintain and expand the existing airport…. …and benefits of building the NEW one…. T he expansion of Ukrainian main airports. GATE CAPACITY OF UKRAINIAN AIRPORT’S after 2012 . Kyiv. Lvov. Kharkov.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'new airport in dnepropetrovsk city' - jesus


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide6

Kyiv

Lvov

Kharkov

Modernization of Ukrainian airports

Odessa

Donetsk

slide9

Resent Terminal can operate only 800 000 passengers annually

5-8 million passengers per year

800 000

passengers per year

Dnipropetrovsk

European city

slide11

PROBLEMS OF EXISTING AIRPORT

1. Limited space for potential

development of the Terminal building

2. Airport is situated too close to the

residential area

3. Taxiways for aircraft are long

and not convenient

4. Runway is too short

slide13

The expansion of existing airport

will transform previously

Centralized to

De-centralized organization of the Terminal

slide14

Oslo

INTERNATIONAL EXPERIENCE.

CENTRALIZED CONFIGURATION OF THE TERMINAL BUILDING

Beijing

Queen Alia

slide15

hj

The site for New airport

Dnepropetrovsk

30 km

Solene

30 km

Zaporozhe

  • 2 runways will
  • accept all aircraft types
  • the site will not be
  • constrained from future
  • expansion
  • New airport will be situated in 30 km from both Dnepropetrovsk and Zaporozhe cities
  • It will have 2 runways for all types of aircrafts
  • New Terminal will have 2 levels of transport approach for departures and arrivals
  • New airport will meet all international licensing standards
  • new terminal building will
  • meet European standards
slide16

We will avoid transportation

problems on the road to the

Terminal

We will reduce the time

needed to operate passengers

We will create a sufficient circulation and concourse area…

slide17

New TerminalBuilding

  • will provide high level of service to travelers
  • will have an attractive architectural look
  • will become a symbol of our region