1 / 21

The INDOT CORS 2007 Indiana GIS Conference March 13, 2007

The INDOT CORS 2007 Indiana GIS Conference March 13, 2007. By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey Group Manager, Woolpert Inc. Continuously Operating Reference Station Operated by Others Operates continuously

jerry
Download Presentation

The INDOT CORS 2007 Indiana GIS Conference March 13, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The INDOT CORS2007 Indiana GIS ConferenceMarch 13, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey Group Manager, Woolpert Inc

  2. Continuously Operating Reference Station Operated by Others Operates continuously Data available for Post-Processing Data may be available in real-time What is a CORS?

  3. Single coordinate system Uniform precision No need to setup base stations Avoids base station radio issues Frees up base stations as rovers Increases productivity Ease of use Advantages of a CORS

  4. Existing CORSNGS

  5. Existing CORS (cont’d)Seiler Instruments

  6. INDOT’s Primary Network17 New Stations plus Bloomington (IUCO)

  7. Typical Installation

  8. Initial Installations

  9. Primary Monumentation

  10. Primary Monumentation (Cont’d)

  11. Primary Monumentation (Cont’d)

  12. Secondary Monumentation

  13. Primary Stations Indiana Department of Transportation Secondary Stations Other State Agencies Municipalities/Counties (Possibly) Higher Education (Possibly) Private Contractors (Not at this time) Station Sponsors

  14. INDOT to Fund Primary Network Indiana Office of Technology (IOT) to Maintain Servers Servers dedicated to INDOT CORS Network Administration

  15. Initial Capital Costs Primary Network:  $400,000 Secondary Network:  $800,000 Annual Operating Budget: to be determined Hardware and Software Upgrades Additional User Licenses Network Administration Budgets

  16. Procurement Bids – March 2007 Bids Received – April 2007 Bid Awarded – April 2007 Begin Primary Installations – May 2007 Complete Primary Installation, including operational network – December 2007 Begin Secondary Installation – August 2007 Complete Secondary Installation - TBD Schedule

  17. Post-Processing Free & Available thru www, location to be determined Real-Time Kinematic Controlled by user name and password Up to 250 concurrent users w/o paying for additional access licenses May develop a fee-based system of access to support maintenance and upgrades CORS Access

  18. Real-Time Differential Coast Guard Beacons (10 m h 68%) WAAS FAA (7 m h&v 95%) Third Party Vendors Omnistar (submeter 95%) INDOT CORS (subdecimeter 95%) Potential fee schedule similar to RTK CORS Access (Cont’d)

  19. CORS Access (Cont’d)

  20. CORS Access (Cont’d)

  21. Questions? INDOT CORS

More Related