i wire n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
I-WIRE PowerPoint Presentation
Download Presentation
I-WIRE

Loading in 2 Seconds...

play fullscreen
1 / 8

I-WIRE - PowerPoint PPT Presentation


  • 157 Views
  • Uploaded on

I-WIRE. (Illinois Wired/Wireless Infrastructure for Research and Education). State Funded Dark Fiber Optical Infrastructure to support Networking and Applications Research $7.5M Total Funding $6.5M FY00-02 (in hand) Additional $500k in FY03 and FY04 Application Driven

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'I-WIRE' - jerrod


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
i wire
I-WIRE

(Illinois Wired/Wireless Infrastructure for Research and Education)

  • State Funded Dark Fiber Optical Infrastructure to support Networking and Applications Research
    • $7.5M Total Funding
      • $6.5M FY00-02 (in hand)
      • Additional $500k in FY03 and FY04
    • Application Driven
      • Access Grid: Telepresence & Media
      • TeraGrid: Computational and Data Grids
    • New Technologies Proving Ground
      • Optical Network Architecture
      • Dense Wave Division Multiplexing
      • Optical network control and management
      • Advanced middleware infrastructure
  • Timeline
    • 1994- Governor interest in Internet to schools
    • 1997- Task Force formed
    • 1999- I-WIRE funding approved
    • 2002- Fiber in place

Starlight International Optical Network Hub

(NU-Chicago)

UIC

Argonne National Laboratory

IIT

U Chicago

40 Gb/s Distributed Terascale Facility Network

Chicago

U Chicago Gleacher Center

UIUC/NCSA

James R. Thompson Center – Illinois Century Network

Commercial Fiber Hub

the teragrid a national infrastructure
The TeraGrid: A National Infrastructure

For more information: www.teragrid.org

nsf teragrid 14 tflops 750 tb
NSF TeraGrid: 14 TFLOPS, 750 TB

574p IA-32 Chiba City

256p HP

X-Class

128p Origin

128p HP

V2500

HR Display & VR Facilities

Caltech: Data collection analysis

92p IA-32

HPSS

HPSS

ANL: Visualization

SDSC: Data-Intensive

Myrinet

UniTree

HPSS

Myrinet

1024p IA-32

320p IA-64

1176p IBM SP

Blue Horizon

1500p Origin

Sun E10K

NCSA: Compute-Intensive

teragrid network architecture
TeraGrid Network Architecture

2200mi

Los Angeles

Chicago

Starlight

I-WIRE

140mi

25mi

15mi

115mi

Caltech Cluster

SDSC Cluster

NCSA Cluster

ANL Cluster

i wire geography

ANL

Starlight / NU-C

UChicagoGleacher Ctr

UChicagoMain

UIUC/NCSA

UIC

IIT

ICN

Commercial Fiber Hub

I-WIRE Geography

Northwestern Univ-Chicago

“Starlight”

I-290

UI-Chicago

  • Status:Done: ANL, NCSA, StarlightLaterals in process: UC, UIC, IIT
  • Investigating extensions to Northwestern Evanston, Fermilab, O’Hare, Northern Illinois Univ, DePaul, etc.

I-294

I-55

Illinois Inst. Tech

Dan Ryan Expwy

(I-90/94)

Argonne Nat’l Lab

(approx 25 miles SW)

U of Chicago

UIUC/NCSA

Urbana (approx 140 miles South)

i wire fiber topology

18

4

Qwest455 N. Cityfront

4

10

4

McLeodUSA

151/155 N. Michigan

Doral Plaza

4

12

12

Level(3)

111 N. Canal

2

2

2

I-Wire Fiber Topology

Starlight

(NU-Chicago)

Argonne

UC Gleacher Ctr

450 N. Cityfront

UIC

UIUC/NCSA

State/City Complex

James R. Thompson Ctr

City Hall

State of IL Bldg

  • Fiber Providers: Qwest, Level(3), McLeodUSA, 360Networks
  • 10 segments
  • 190 route miles; 816 fiber miles
    • Longest segment: 140 miles
  • 4 strands minimum to each site

FNAL

(est 4q2002)

UChicago

IIT

Numbers indicate fiber count (strands)

i wire transport
I-Wire Transport

TeraGrid Linear

3x OC192

1x OC48

First light: 6/02

Starlight

(NU-Chicago)

Argonne

Starlight Linear

4x OC192

4x OC48 (8x GbE)

Operational

UC Gleacher Ctr

450 N. Cityfront

Qwest455 N. Cityfront

Metro Ring

1x OC48 per site

First light: 8/02

UIC

UIUC/NCSA

McLeodUSA

151/155 N. Michigan

Doral Plaza

State/City Complex

James R. Thompson Ctr

City Hall

State of IL Bldg

UChicago

IIT

  • Each of these three ONI DWDM systems have capacity of up to 66 channels, up to 10 Gb/s per channel
  • Protection available in Metro Ring on a per-site basis
i wire economics
I-WIRE Economics
  • Up front cost of ~$4M for fiber
    • 20-year IRU Fiber (existing fiber)
      • $700 to $5,000/strand-mile
    • New construction (for ‘last mile’)
      • $30 to $100/foot ($160-530k/mile)
  • Up front cost of ~$2.5M for equipment
  • Annual costs
    • ~$100k for fiber maintenance, small number collocation spaces
    • ~$250k for equipment maintenance, staff effort