An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SITUACIÓN DEL SEIN 2012 - 2016 Enero 2012 1

  2. SISTEMA ELECTRICO INTERCONECTADO NACIONAL • RESUMEN AL 2011 • Potencia Efectiva-Año 2011 (1) • Total : 6 444 MW • CC.HH. 48% • CC.TT. 52% • Producción – Energía (1) • Año 2010: 32 426 GWh(2) • Año 2011: 35 217 GWh (2) (Δ : 8,61 %) • % Producción 2011: • CC.HH. 58 %, CC.TT. 42% • Máxima Demanda (1) • Año 2010: 4 579 MW (2) • Año 2011: 4 961 MW (2) (Δ : 8,34 %) • Longitud de líneas al año 2011 • 220 kV: 9 646 km (3) • 500 kV: 89 km (1): Generadores COES. (2): No Incluye la exportación al Ecuador. (3): Estimado. 2

  3. DEMANDA 2012 - 2016 3

  4. PROYECCIÓN DE LA DEMANDA 2012 – 2016 Febrero 2012 Demanda del SEIN y Crecimiento promedio:  4

  5. PROYECCIÓN DE LA DEMANDA 2011 – 2016 Febrero 2011 Demanda del SEIN y Crecimiento promedio:  5

  6. PROYECCIÓN DE LA DEMANDA 2012 - 2016 6

  7. PROYECCIÓN DE LA DEMANDA 2012 - 2016 PROYECCIÓN ECONOMÉTRICA VEGETATIVA 2012 - 2016 7

  8. GENERACIÓN 2012 - 2016 8

  9. PLAN DE OBRAS DE GENERACIÓN 2012 – 2016 1 de 2 9

  10. PLAN DE OBRAS DE GENERACIÓN 2012 – 2016 2 de 2 10

  11. Plan de Obras de Generación 2012 – 2016: 5000 MW comprometidos C.T. de Generación Adicional en Mollendo y Piura. C.T. de Reserva Fría Talara, Eten, Ilo. Ciclos Combinados de Kallpa y Enersur. Centrales Hidroeléctricas: Chancay, Olmos, Huanza, Machu Picchu II, Santa Teresa, Cheves, Quitaracsa, Chaglla, Pucará, Cerro del Aguila. Centrales de Energías Renovables: Biomasa, Eólicas, Solares (Fotovoltaicas), Minihidros. C.T. Gas Natural: Fénix, Termochilca, Quillabamba, 11

  12. TRANSMISIÓN 2012 - 2015 12

  13. L.T. 220 kV CAJAMARCA NORTE - CARHUAQUERO (NOV- 2015) L.T. 220 kV CAJAMARCA NORTE – CACLIC - MOYOBAMBA (MAY - 2015) SISTEMA DE TRANSMISIÓN: PROYECTOS 2012 - 2015 L.T. 220 kV TALARA – PIURA 2°T. (SET - 2012) L.T. 22 kV TRUJILLO - GUADALUPE - CHICLAYO 2°T (ABR- 2012) L.T. 220 kV POMACOCHA-CARHUAMAYO (OCT - 2012) L.T. 500 kV TRUJILLO – LA NIÑA (DIC- 2013) L.T. 220 kV MACHUPICCHU - ABANCAY – COTARUSE (MAY- 2014) L.T. 500 kV ZAPALLAL - CHIMBOTE – TRUJILLO (SET- 2012) L.T. 220 kV MACHUPICCHU – QUENCORO – ONOCORA – TINTAYA (DIC - 2015) L.T. 220 kV TINTAYA – SOCABAYA (ABR- 2013) L.T. 500 kV CHILCA - MARCONA - MONTALVO (AGO - 2013)

  14. ESTIMACIÓN DE LA RESERVA A NIVEL DE SEIN PERIODO 2012 - 2016 14

  15. RESERVA 2012: AVENIDA – ESTIAJE – DICIEMBRE 15

  16. RESERVA 2013: AVENIDA – ESTIAJE – DICIEMBRE 16

  17. RESERVA 2014: AVENIDA – ESTIAJE – DICIEMBRE 17

  18. RESERVA 2015: AVENIDA – ESTIAJE – DICIEMBRE 18

  19. RESERVA 2016: AVENIDA – ESTIAJE – DICIEMBRE 19

  20. ESTIMACIÓN DE LA RESERVA POR ZONAS PERIODO 2012 - 2016 20

  21. RESERVA 2012 – 2016 ESTIAJE ZONA NORTE: 21

  22. RESERVA 2012 – 2016 ESTIAJE ZONA SUR: 22

  23. RESERVA 2012 – 2016 ESTIAJE ZONA CENTRO 23

  24. VISIÓN DE LARGO PLAZO DE LA ESTRUCTURA DEL SISTEMA DE TRANSMISIÓN EN 500 KV DEL SEIN 24

  25. VISIÓN DE LARGO PLAZO DE LA ESTRUCTURA DEL SISTEMA DE TRANSMISIÓN EN 500 KV DEL SEIN INTERCONEXIÓN ECUADOR-COLOMBIA Plan Transitorio Líneas de 500 kV INTERCONEXIÓN BRASIL Plan Vinculante Plan Robusto 2022 Visión a futuro de nuevas líneas en 500 kV INTERCONEXIÓN CHILE 25