1 / 10

WP7 -- Project Evaluation

WP7 -- Project Evaluation. Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner. Overview. WP7-Partners Objectives Role Interfaces Criteria Procedure Summary Next Steps. WP7 -- Partners. Swiss Federal Institute of Technology ETH. LAN

Download Presentation

WP7 -- Project Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner 1 WP7 Presentation

  2. Overview • WP7-Partners • Objectives • Role • Interfaces • Criteria • Procedure • Summary • Next Steps 2 WP7 Presentation

  3. WP7 -- Partners Swiss Federal Institute of Technology ETH LAN Lancaster University DEM National Center for Scientific Research Demokritos 3 WP7 Presentation

  4. WP7 -- Objectives according to Technical Annex Evaluation And Monitoring Project Evaluation: 1. pedagogical 2. technical WP Monitoring: 1. objective fulfillment 2. quality assessment 4 WP7 Presentation

  5. Role of WP7 • Quality assessment • Progress monitoring and evaluation based on: • internal reports • deliverables • prototypes • additional information to be provided on WP7’s request • Proposal for changes if WP-goals are not met } =Products of WPs 5 WP7 Presentation

  6. PM Comm. WP 7 Interfaces of WP7 coordination coordination report report alignment report WPs 6 WP7 Presentation

  7. Evaluation and Monitoring Basis • Project Proposal Objectives (TA Section 2) • often specifies strictly and precisly measurable criteria (e.g. 2A & 4C) • sometimes lacks precision (e.g. 4A & 4B) • WP7 has task to define measurable criteria Agreement of all project partners oncriteria 7 WP7 Presentation

  8. Y2 Y1 Procedure of Evaluation And Monitoring 01/00 01/01 01/02 01/03 1 2 3 WPs 4 5 6 time WP7 WP Milestones & Reports Evaluation Report 8 WP7 Presentation

  9. Summary WP7 Tasks • WP7: only WP performing quality assessment • Interfaces between WP7 and all WPs, Project Management and Commission • Project and WP quality assessment: • evaluation: criteria defined in proposal (sec. 2) • monitoring: measures defined in proposal (sec. 2) • procedure: as proposed in presentation 9 WP7 Presentation

  10. Next Steps • Preparation of interim report due 01/08/00 • Quality assessment framework • Definition of quality assessment criteria and parameters for each WP and the whole project. 10 WP7 Presentation