130 likes | 207 Views
Construction of a two-room building at Krishna Primary School with improved resources and community involvement. Progress includes increased student enrollment, teacher support, and enhanced learning materials. Priority needs include additional training for teachers, a compound wall, and sanitation facilities. The local community is encouraged to participate in labor contributions and transportation. Support is needed for various construction materials and skilled labor. Partnering with Nabuur for sustainable development outcomes.
E N D
NABUUR GAMAULI CONSTRUCTION OF TWO ROOMS’ BUILDING
Partners Local Level: Krishna Primary School/Management committee/local community International level: Nabuur
Development so far • Student number increased from 145 to 209 • Mr. Garry Miller has supported salary for two teacher now the number of teacher is 5 (government supported -2, Nabuur suppored- 2 & community supported-2) • Sufficient teaching materials- provided by Stacy Helmus • Parents visit school and work together • Teachers are punctual work trying child centered education
Community combination • Total house holds: 200 • Dalits: 104 • Thakuri: 39 • Chhetries: 57 • Occupation • Farming: All families • Employ: • 11 people in private companies • 7 people in government offices
Recent needs and priority • Building with two rooms • Training for teachers (Child centered) and materials • Compound wall (125 Meter) • Drinking water • Toilet
Community participation • Community can participate in following areas • Labor contribution (un skilled) • Wood • transportation
Support Required • Following support is required with partner • Cash for Cement • Cash for Rods • Cash for skilled labor • Bricks/stone • Grill • Other things that need to import from outside
Total length: 46 Feet Map of building • Map ( 23Š20 Feet/room) Old building Further extension East elevation
Measurement Details Windows; • Length= 6 feet • Height= 5 feet Doors; • Breath=3feet • Height= 7feet Wall; Thick= 14 Inch Height=11 feet
Questions asked by Tatjana • Floor plan, elevation, sections, dimensions, position of entrance, north orientation, photos of the building, Ans: Pls. go to building sketch, it is decided by local contractor and me. • Marked place for the future extension Ans: Marked in map • Roof is concrete slap • Measures are in feet • Foundation depth is 5 feet • Materials are stone, sand, cement, wood, concrete, rods etc