1 / 9

Initial concepts for delivering additional water

Initial concepts for delivering additional water. LWDD. C-14/C-13/ C-11 Basins. Restudy D-13R4 (aka 245K). D-13R4 Method. Backpump C-51 through LWDD canals Backpump into Ag Reserve Reservoir Send Releases from Ag Reservoir through LWDD E-1W Canal to Hillsboro Impoundment

jeff
Download Presentation

Initial concepts for delivering additional water

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Initial concepts for delivering additional water

  2. LWDD C-14/C-13/ C-11 Basins Restudy D-13R4 (aka 245K)

  3. D-13R4 Method • Backpump C-51 through LWDD canals • Backpump into Ag Reserve Reservoir • Send Releases from Ag Reservoir through LWDD E-1W Canal to Hillsboro Impoundment • Hillsboro Impoundment stores water in 300 acres at 12 feet deep, also backpumps more of Hillsboro Canal • Release water from Impoundment and treat in 2,160 acre STA • STA treated water discharged into WCA-2A • Assumed flood protection in all affected areas will be maintained. Ag Reserve Reservoir Hillsboro Impoundment STA

  4. C-14 C-13 C-42 North New River Canal US-27 Conveyance Canal D-13R4 Method • Backpump C-14 and C-13 canals • Route water south and west via C-42 and North New River Canals to US-27 conveyance canal • Route water south via US-27 conveyance canal to NLBSA, Bird Drive Recharge Area or Biscayne Bay • Additional water quality treatment may be required • Assumed flood protection in all affected areas will be maintained.

  5. LWDD C-14/C-13/ C-11 Basins “Northwest Passage” (LWDD Runoff)

  6. S-155A STA-1W STA-1E Northwest Method • Backpump C-51 at S-155A • Route water west to STA’s for treatment and/or storage in EAA Reservoir

  7. Questions? Thank You

More Related