Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye. Project. Design a stormwater drainage system for the city of Bluffdale. Assess current infrastructure Assess current drainage needs for a 100 year 24 hour storm Design of new infrastructure using EPA SWMM

jasper
Download Presentation

Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

  2. Project Design a stormwater drainage system for the city of Bluffdale • Assess current infrastructure • Assess current drainage needs for a 100 year 24 hour storm • Design of new infrastructure using EPA SWMM • Prepare a cost estimate N

  3. Existing Infrastructure Map of Existing Inlets and Pipe Locations Map of Existing Inlets and Pipe Locations

  4. Existing Infrastructure • 3 Drains in Neighborhood • 1 drain has no pipe exit • 2 drains empty into trench • 9 Drains on Northern Street • Pipes over to Bangeter Highway system

  5. Steps Map of Drainage Basins • Create drainage basins for each inlet • Find the depth of the 100 year 24 hour storm • Calculate flow lines and accumulations • Calculate curve number using soil type and land use data • Export information into HEC-HMS Analysis of Drainage Needs

  6. HEC HMS HEC-HMS Model HEC-HMS Output

  7. EPA SWMM Flow Volume vs. Time in Fullest Pipe Depth of Water and Inlets Depth and Flow in Pipes Depth of Water in Pipe vs. Time

  8. Final Design Final Design Existing.................. Proposed ……………. Pipe Labels…………… Inlet Label…………… 1b 1a 3 1 3 2b 4b 2 2a 4a 4 5b 6b 5 5a 6a 6

  9. Final Design Pipe elevation and length information Inlet elevation and box depths Cross Pipe depths

  10. Cost Analysis