Massachusetts Pressure Washwater Treatment Demonstrations. Robin Lacey – MA CZM. The Problem. Cape Ann Marina - Gloucester. Chemical pre-treatment for discharge to local sewer (American Cleanway) Certified operator required – Grade 2 Must remove large solids before treatment
E N D
Massachusetts Pressure Washwater Treatment Demonstrations Robin Lacey – MA CZM
Cape Ann Marina - Gloucester • Chemical pre-treatment for discharge to local sewer (American Cleanway) • Certified operator required – Grade 2 • Must remove large solids before treatment • Dried sludge = solid waste • Stormwater Issues • Costs System - $25K (system, start-up chemicals, and training) Total - $48K (includes washpad, site work, electrical, plumbing…)
Arey’s Pond Boatyard - Chatham • Closed-loop re-circulating system (RGF Environmental) • Settling, physical filtration, odor control • No operational permits • No certified operator • Owner satisfied with system after 2 seasons • Costs System - $16.3K (system and training) Total - $36.7K (includes washpad, electrical, plumbing…)
Treatment System Control Panel
The End Robin Lacey Massachusetts Office of Coastal Zone Management 251 Causeway Street, Suite 800 Boston, MA 01890 617-626-1220 robin.lacey@state.ma.us