1 / 13

NEW ASTEROID MOON DISCOVERY AWARD

NEW ASTEROID MOON DISCOVERY AWARD. PAUL D. MALEY IOTA ANNUAL MEETING 2014. NAME OF AWARD. W.J. M erline A ward for D iscovery of an A steroid M oon by O ccultation (MADAMO). PURPOSE.

janus
Download Presentation

NEW ASTEROID MOON DISCOVERY AWARD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW ASTEROID MOON DISCOVERY AWARD PAUL D. MALEY IOTA ANNUAL MEETING 2014

  2. NAME OF AWARD • W.J. MerlineAward for Discovery of an Asteroid Moon by Occultation (MADAMO)

  3. PURPOSE • TO DRAW ATTENTION TO IOTA WORK AND METHODS, specifically multi-station deploys where 1 observer deploys 3 or more stations • TO RECOGNIZE THE FIRST CONFIRMED AMATEUR DISCOVERY OF AN ASTEROID SATELLITE BY OCCULTATION • TO RECOGNIZE THE CONTRIBUTIONS OF BILL MERLINE (SWRI) IN THE FIELD OF ASTEROID SATELLITE DISCOVERY • TO PROVIDE A ONE TIME MONETARY PRIZE SIMILAR TO PRIZES OFFERED IN PRIOR CENTURIES FOR SIMILAR TYPE DISCOVERIES

  4. AWARD • MONETARY PRIZE AND CERTIFICATE • MONETARY AWARD: $1,000 CONTRIBUTED BY P. MALEY $1,000 CONTRIBUTED BY R. NUGENT $1,000 ANONYMOUS CONTRIBUTION ●CERTIFICATE AWARD: Confirming organization or individual(s)

  5. MONETARY AWARD ELGIBILITY • IOTA MEMBERS WORLDWIDE ONLY (FORMER OR CURRENT) • PROFESSIONAL ASTRONOMERS INELIGIBLE • DISCOVERY / CONFIRMATION COULD BE RETROACTIVE • DISCOVERY MUST BE ACCOMPLISHED USING IOTA METHODOLOGY THROUGH OCCULTATION TIMING ONLY, preferably using the multi-station deploy technique

  6. DRAFT GUIDELINES • SEPARATE ONLINE DOCUMENT DEFINE DETAILED STEPS OF AWARD PROCESS

  7. VALIDATION STAGE-1 • OCCULTATION CANDIDATES OBSERVED: TNO, NEO, MBA, DWARF PLANETS PERMITTED • ELECTRONICALLY RECORDED DATA SUBMITTED BY OBSERVER(S) • INITIAL REVIEW CONDUCTED BY IOTA OFFICERS • IOTA & DISCOVERER(S) DEVELOP REPORT FOR IAU • IF REPORT HOLDS UP, CONFIRMATION REQUIRED BY INDEPENDENT PARTY#1 WITH INDEPENDENT TECHNIQUE • PRELIMINARY ORBIT MUST BE DEFINED

  8. VALIDATION STAGE-2 • CONFIRMATION BY ANOTHER INDEPENDENT TEAM AND METHOD (AO, RADAR, SATELLITE OBSERVATION, LIGHT CURVES, ETC.) • VALIDATION PANEL ESTABLISHED AFTER INITIAL IOTA REVIEW, CONTINUES THROUGH ENTIRE PROCESS • VALIDATION PANEL SUBMITS RECOMMENDATION TO IAU • IOTA CONFERS AWARD AFTER IAU VALIDATION

  9. IAU “PROVISIONAL” DESIGNATION • NOT CONSIDERED A VALID CONFIRMATION SINCE THERE ARE OBJECTS WITH THAT DESIGNATION WHICH MAY NOT EXIST • PROVISIONAL DESIGNATION IS A PLACEHOLDER ONLY

  10. AWARD DISTRIBUTION • MONETARY AWARD GOES ONLY TO DISCOVERER(S) • IF >1 DISCOVERER, MONEY IS EVENLY DIVIDED • CERTIFICATE TO ALL OTHERS IN THE PROCESS • FINAL AWARD DETERMINATION TO BE DECIDED BY IOTA AFTER INITIAL PANEL RECOMMENDATION & IAU CONCURRENCE

  11. OPEN ISSUE • Confirmation by IAU of their participation

  12. RECOMMENDATION • DOCUMENT AND ADVERTISE AWARD ON IOTA WEB PAGE AND OTHER MEDIA AS OFFICERS SEE FIT • I HAVE PREPARED A TEMPORARY WEB PAGE FOR THE AWARD which will go ‘live’ once any open items have been resolved

  13. DISCUSSION?

More Related