Reflection on producing 50 acrylic clocks, including successes, failures, and results. Recommendations for improvements, including materials, processes, and productivity enhancements. 8
E N D
Ideas-UnlimitedReflections Adrian Allen Steve Lona Nicholas Tracy
Successes • Produced the desired quantity of 50 acrylic clocks • Achieved acceptable level of quality
Failures • Scraped six products during production • Broke six 1/32 inch end mills • Reworked 5 parts as a result • Lost 2 products during finishing operations
Results • Using scrapped material was cheaper, but produced greater variability from piece to piece • Acrylic was easily susceptible to scratches • Spent twice as long manufacturing than what we expected • Over on budgeted machine and labor hours
Conclusion • Moved toward a more Industrial Engineering type of environment • Improved process plans • Setup reduction techniques • Assembly Line • Cross-functional team
Improvements • Find a more consistent and scratch resistant material • Use a vacuum fixture to end mill around entire work piece • Better cut-off operations
IME, Inc. Experience • Teamwork • Collaboration with professors • Working with outside vendor • Apply past and present coursework into one