  1. GEO-NRGProject Adrovicz Áron Soós Szabolcs Vető Benjamin

  2. The blocks of flats • It was built in 1973 • It was a normal blockhouse • 256 flat • 1000 people • It was heated by normal central heating but it had very great loss of heat • 25.320 GJ/year

  3. The firststeps • 2007-7446 GJ/year • 120 million Ft invested • They couldn’t save money becouse the prices have grown by time • „Főtáv” conferancia • 1998-block of flats has own cenral heating • 25.320 GJ/year -25%=18.996 GJ • 45 Celsius • In 2000 they started 8 project

  4. GEO-NRG • They begin to plan in 2008 • 2009.06.01 heating is started to work • First time just warm water • 2009. october heating • No airconditionar • 60-70 Celsius • -15% heat loss • 2010-6097 GJ/year • It cost’s160 million Ft • They begin to put Fenkor radiators into the flats