1 / 6

Future Work

Future Work. Three timelines Immediate (next week): finalize the Year 2 annual report! Next month, before the NASA PI’s meeting (May 4-6, 2009): Poster Year 3: project expires on May 8, 2010 Datasets WCRP CMIP3 dataset (precip, temp, monthly)

jalene
Download Presentation

Future Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Work • Three timelines • Immediate (next week): finalize the Year 2 annual report! • Next month, before the NASA PI’s meeting (May 4-6, 2009): Poster • Year 3: project expires on May 8, 2010 • Datasets • WCRP CMIP3 dataset (precip, temp, monthly) • NEXRAD precipitation (4-km grids) for Region 12 (Gulf States) • River masks (4-km grids) for Region 12 (Gulf States) • Land use and land cover (LULC)(4-km grids) for Region 12 (Gulf States) MODIS LAI, Fveg, Tskin,… • Water chemistry samplings • Modeling • Bias-corrected dynamical downscaling • Hydrological modeling • River routing • Water quality modeling • Estuary ecosystem modeling • Integration (multi-disciplinary and multi-scale) • Climate (weather)–water–ecosystems–coastal zone • Climate change (current  future) • Land use and land cover change

  2. Annual Mean LAI (2002-2007) Model MODIS

  3. Annual Mean GVF (2002-2007) Model AVHRR

  4. Skin Temperature (7/12/2004 21:00UTC) Model GOES

  5. LULC Change (1992-2001)

  6. Multi-scale Studies

More Related