An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Cost Management PMBOK 4th Edition

  2. Agenda • Broad Understanding of Project Cost Management. • Understand how software estimation is different.

  3. I PROCESS GROUPS Planning Estimate Costs E Budget Costs Controlling C Control Costs

  4. Estimate Costs • Cost estimating and Pricing: • Cost estimating: how much will it cost the performing organization to provide the product or service involved? • Pricing: how much will the performing organization charge for the product or service? Business decision. • Estimating should be done by the person doing the work.

  5. Estimate Costs Inputs Tools Outputs • Based on the WBS to increase the accuracy. • Project managers should analyze the needs of the project, to compare and reconcile any differences with cost requirements from management. • WBS • Resource requirements • Resource rates. • Act. duration est. • Historical info. • Chart of accounts • Risks • Analogous est. • Parametric modeling • Bottom-up est. • Cost estimates • Cost management plan

  6. Estimate Costs • Cost estimates for all resources that will be charged to the project. • Generally expressed in units of currency to facilitate comparisons both within and across projects. • Generally includes appropriate risk response planning. • Supporting detail must include: • Reference to WBS. • How it was developed? • Assumptions made. • Range of possible results. • Cost management plan how cost variances will be managed.

  7. Estimate Costs • View the Templates • Top Down • Experience Based/Analogy • Parametric • WBS • Roll up the numbers

  8. Estimates vs. Accuracy • Most difficult to estimate as very little project info is available • Used to finalize the Request for Authorization (RFA), and establish commitment • Development stage estimate. Needed to predict revised project completion date

  9. Tools for Estimating

  10. Influencing Factors • Two sets of factors influence the ultimate cost of a system • Size Factors • Number, and type of functions • Project Factors • Project parameters that influence project costs.

  11. Control Costs Inputs Tools Outputs • Understand what is driving variances, good and bad, and decide what action to take. • Cost Baseline • Performance Reports • Change Requests • Cost Management Plan • Cost Change Control System • Performance Measurement • Earned Value Management • Additional Planning • Computerized Tools • Revised Cost Estimates • Budget Updates • Corrective Action • Estimate at Completion • Project Closeout • Lessons learned

  12. Case Study • Simple Case study requires you to master the following: • EV = Earned Value • PV = Planned Value • AC = Actual Cost

  13. Budget Costs • The cost baseline will be used to measure and monitor cost performance of the project. Expected Cash Flow Cumulative Values Cost Baseline Time

  14. Control Costs • To Control / Report Costs • And to Revise Costs and provide a new Estimate At Completion • Use Earned Value Method

  15. Example • Painting your four walls. • Each wall $1000. • Total Budget At Completion (BAC) = $1000+$1000+$1000+$1000 • Half way through you audit the work. • Let us consider two scenarios.

  16. Scenario 1 • One Wall is painted • Amount Spent is $500

  17. Scenario 2 • Two Walls painted • Amount Spent is $4000

  18. What is the Revised EAC • For Scenario 2.

  19. TCPI • What if CPI is consistently low. • Can you catch up somehow? • How will you know if it is not possible? • Read 18.6.1 about TCPI.

  20. Case Study: Project “Book Contract” • The “Book Contract” Project: • 10 work packages • 10 chapters • Negotiated to be delivered 1 per month • Estimated cost of $100 each

  21. Time to Complete Performance Index (BAC) This is equal to:

  22. Why pick TCPI? The TCPI focuses on the remaining project activities. It reflects what it will take in future performance to recover from a negative actual cost position. Note: It is effectively the mirror opposite of the cumulative CPI.

  23. We’ve all been there. You’re a few months into a project and the first few deliverables have been completed. You diligently calculate the CPI = 0.9. Your customer asks you about your plans for the cost overrun “No problem, we’ll make it up” BUT CAN YOU?

  24. Back to the Case Study..

  25. TCPI calculation: Work Remaining • The work remaining is BAC – EV = $1,000 - $300 = $700 • This is an estimate of the earned value remaining: • The total earned value for the project is $1,000 • We have completed 3 deliverables. • Work remaining = $700.

  26. TCPI Calculation: Funds Remaining • The funds remaining are BAC – AC = $1,000 – $330= $670. • This is the remaining budget if we are to deliver as promised.

  27. Project Moves on • 1.04 doesn’t look too bad! • We have to achieve a CPI rate of 1.04 times of what we were working on. • Yes, We Can! • Yes, We Can! • Yes, We Can!

  28. So Three More Months & Three more Chapters

  29. Three More Chapters …

  30. Uphill… • To complete the project within budget, we now have to work at a rate 18% greater than we proposed. • In fact, we need a 29% improvement in our expenditure rate from 89% to 118%!

  31. TCPI Goes to ∞ in month 8!

  32. Estimates of Cost to Complete Next: The PM should calculate the new EAC. The estimate of the final cost at completion is called the estimate at completion (EAC).

  33. Analysis • The TCPI has the remarkable property that if we own up to the cost overrun and use the TCPI with the EAC in the denominator, then we can proceed at our current efficiency (defined by our current CPI) and hit the new cost target.

  34. Conclusion When BAC is no longer attainable, the project manager should calculate a new EAC. This new estimate becomes the goal we will work towards if approved by stakeholders. TCPI = (BAC –EV) / (EAC –AC)

  35. Conclusion TCPI gives us a reality check analysis. PM: Our CPI is 0.9. We will deliver on budget, don’t worry. Auditor: I have TCPI = 1.2, implies 30% increase in productivity. Auditor: Are you Sure?

  36. References • Provides a good overview and general guide to the principles of EVM. • Shows the EVM role in facilitating effective project management , Project Management Institute, 2005 • The Two Most Useful Earned Value Metrics: the CPI and the TCPI By Quentin W. Fleming and Joel M. Koppelman • Also Warburton and Kanabar – Several PMI papers and Book