An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

  2. Kashiwazaki-Kariwa NPP Niigata city Epicenter Summary of the Earthquake andSituation of the Kashiwazaki-Kariwa NPP • Summary of the Earthquake • Occurrence: July 16, 2007 at 10:13 am JST • Earthquake Source: • 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North、138°36.5′East) • Epicenter Distance: 16km from the NPP • Magnitude: 6.8 • Situation of the NPP • When the earthquake occurred: • Unit 2 was in start-up • Unit 3, 4 and 7 were in normal operation • Unit 1, 5 and 6 were out of operation for the periodic inspections • Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals

  3. Rx. Water Level Rx. Coolant Temp. Unit 2under Stat up 19:40 <100℃ Unit 3100% Power 23:07 <100℃ Unit 4100% Power 7/17 6:54 <100℃ Unit 7100% Power 7/17 1:15 <100℃ Unit 5 Unit 3 Unit 4 Unit 7 Unit 6 Unit 2 Unit 1

  4. Unit 1 RPV Inspection Schedule August September October November December Phase 1 Phase 2 Phase 3 8/21 8/23 Visual inspection using under water TV camera

  5. Unit 1 : Phase 1 Inspection Flange Upper Grid Guide Rod Feed Water Sparger Core Shroud Core Spray Pipe Core Spray Sparger As a result of phase 1 inspection, the abnormality such as the damage / transformation / the falling off was not confirmed.

  6. Guide Rod Flange Unit 1 : Flange

  7. Unit 1 :Guide Rod Guide Rod FW Sparger Core Spray Pipe

  8. Unit 1 :Feed Water Sparger

  9. Unit 1 :Core Spray Pipe

  10. Unit 1 :Core Spray Sparger Core Shroud(upper ring) Core Spray Sparger

  11. LPRM Unit 1 :Upper Grid

  12. Unit 1 : RPV base bolts(A,As)

  13. Reactor Combination Building Pene B1 Floor Duct Water Flow-in B2 Floor B3 Floor B4 Floor B5 Floor Sump Unit 1 : Leakage of water into B5 floor Break of Fire Extinguishing Pipe (B,C) Leakage of water into B5 floor of the reactor combination building (Unit 1)

  14. Unit 1 : Oil Tank (B,C) Land Subsidence

  15. Unit 3 :Fire of House Transformer(1/3) (B,C) As for the duct, 16 - 18cm dropped

  16. House Transformer Bus Duct 1 – 3 cmdropped 20 – 25 cmdropped Bedrock Unit 3 :Fire of House Transformer(2/3)

  17. Start-up Transformer Unit 7 6 5 4 2 1 Unit 3 Main Transformer House Transformer Unit 3Main Generator Normal Bus Emergency Bus Unit 3 :Fire of House Transformer(3/3) Fire of House Trans. was not safety related problem

  18. Upside Downside Unit 3 : DG(A,As)

  19. Unit 3 : HCU (A,As)( Hydraulic Control System (CRD))

  20. Unit 3 : MSIV (A,As)

  21. Unit 3 : PLR Pump (A,As)

  22. Unit 3 : RHR Pump (A,As)

  23. Unit 3 : Blow-out Panel came off (B,C)

  24. Unit 3 : Displacement of the main exhaust duct (B,C)

  25. Unit 6 : Leakage of water including radioactive materials (B,C) Leakage of water including radioactive materials into non-controlled area in the reactor building

  26. Unit 6 : Leakage of water including radioactive materials Leakage of water including radioactive materials into non-controlled area in the reactor building

  27. Motor Motor Damaged Unit 6 : Damage of the reactor building overhead crane Damage found on the coupling of the drive axis of the reactor building overhead crane

  28. Building Ventilation Reactor Building Still Working after Plant Shutdown Turbine Building Main Exhaust Duct Filter Main Exhaust Duct Monitoring House Reactor Turbine Gland Steam Exhauster Turbine Conden-ser Filter Rare Gas Hold -up Equipment Unit 7 : Detection of radioactive materials in the main exhaust duct Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine

  29. Other (B,C)

  30. Solid waste storage warehouse