BARCELONA. TISU: The Resilience Boards. Manuel Valdés CEO of Infrastructure and Urban Coordination City Hàbitat - Barcelona City Council. Barcelona City Protocol. Barcelona City Protocol. Infrastructure Urban Resilience Board . 23/07/2007 10h 53min. Background.

jace
Download Presentation

BARCELONA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BARCELONA TISU: TheResilienceBoards Manuel Valdés CEO of Infrastructure and Urban Coordination City Hàbitat- Barcelona City Council

  2. Barcelona City Protocol

  3. Barcelona City Protocol Infrastructure Urban Resilience Board 23/07/2007 10h 53min

  4. Background Infrastructure Urban Resilience Board ! ! ! Electrical blackout: 323.337 users affected during 56 h 42‘ Source: Report of the CNE

  5. Background Infrastructure Urban Resilience Board What to do?

  6. City reaction: Creation of Infrastructure Urban Resilience Board • Where we are? • How do we interact? • What do other cities do? • Where are we headed? 2008. 3Ss PROJECT: SECURITY ON SERVICES SUPPLY INFORMATION Collect and structure information of several infrastructures and services from different sources. DIAGNOSE/ASSESSMENT Identify the weak points/risks in the networks of infrastructures and services in the city and its metropolitan area IDENTIFICATION OF ACTIONS TO: Improve the quality of the operational plans that focused on overcoming crisis situations. Develop integrated defensive investments through urban resilience procedures. City Habitat Infrastructures

  7. Urban Networks Telecommunications

  8. Urban Networks Water cycle: Supply

  9. Urban Networks Water cycle: Sewer

  10. Urban Networks Matter cycle: Pneumatic collection of solid waste

  11. Urban Networks Energy: Electricity

  12. Urban Networks Energy: Gas and Fuel

  13. Urban Networks Energy: Heating&Cooling

  14. Urban Networks Mobility: Railroad Network

  15. Resilienceprojects Infrastructure Urban Resilience Board • Where we are? • How do we interact? • What do other cities do? • Where are we headed? 2009 TISU: Infrastructure Urban Resilience Board Development of transversal projects for reduction of urban vulnerability and guarantee the city continuity. ORGANIZED 8 clusters and a coordination team. COORDINATED Between the different areas of local administration private operators and other administrations, which influence the resilience of the city. EFFICIENT 40 improvement projects. GLOBAL It maintains a network formed by 72 professionals from 37 entities.

  16. Resilienceprojects

  17. Resilienceprojects Infrastructure Urban Resilience Board Project Stages Definition Development: Resolution Communication Update Power supply: Study of electrical contingencies Objectives: Assess the degree of reliability of the network in actual configuration and in crisis situations. Check with electrical companies the priority investments from the resilient point of view

  18. Resilienceprojects Infrastructure Urban Resilience Board Project Stages Definition Development: Resolution Communication Update Urban tunnels: Audit on the current state of the tunnels Objectives: Setting priorities in the implementation of improvements and costs evaluation.

  19. Resilienceprojects Infrastructure Urban Resilience Board Project Stages Definition Development: Resolution Communication Update Underground works and galleries: Auscultations procedure Objectives: Prevent risk situation of work in the underground Identify damage in early stages Unify the criteria of implementation

  20. Resilienceprojects Infrastructure Urban Resilience Board Project Stages Definition Development: Resolution Communication Update Energy: Compressed Natural Gas (CNG) share supply for bus and collected waste trucks Objective: Create redundancy in the fuel supply to various public services vehicles for crisis situations

  21. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Establish a legal framework at local level to jumpstart the process; pass a resolution to adopt a policy on disasterresilience: Creation of Barcelona ResilientBoard in 2009 for permanent transversal work. • Assess the political will of the city council and local authorities to integrate disaster risk reduction into Development: The new goverment gave continuity and restartedthisboard, Directedby 3rd Deputy Mayor • Designate a technical entity or team in the municipality, charged with leading the work and implementingactions: Infraestructures and UbanCoordinationDepartment, in collaborationwith Fire Department.

  22. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Identify and convene all actors and create strategic alliances: Proposed the creation of a cluster for Barcelona Resilience in a collaborative (not competitive) way • Appoint (or strengthen) a multi-stakeholder task force to implement the process: 37 stakeholders working in projects of TISU board • Establish sector or thematic working groups: 8 sectorial groups were created.

  23. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Define the methodology to be used and alliances, resources and capacities required: Five phases for each project to guarantee business continuity. Diagnosis, prioritization, Development, Communication and Update • Create a work plan: Associate to each project once development phase begin • Build technical capacities to implement the process: Each project have a coordinator and a task force. • Solicit technical support from relevant agencies to move the process forward: Are integrated in the process • Mobilize resources for implementation: Associated to each project before the implementation • Step up communication efforts by publishing resolutions and work plans: Communication phase have to be implemented when project is finished

  24. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Collect and systematize information on disaster risk, existing national and local legal frameworks, and the city’s development plans, programs and strategies: All Technical Departments are in task forces • Review the existing territorial development plan and study in detail its programmesand projects: Collection, allegations and consideration of territorial and sectorial plans

  25. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Carry out a general study or diagnosis of the city, which will serve as a baseline of knowledge upon which to conduct a risk analysis: Diagnosis made in 2008. Actually dynamic process for needs and priority determination process proposed. • Promote discussion among all actors to reach consensus on priorities: New metodology for projects priorization is under implementation

  26. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Conduct an internal and external analysis of the situation city-wide, identifying strengths, weaknesses, opportunitiesand threats: actualization of 2008 diagnosis proposed for 2014 • Analyze the resources, the capacities and the key actors and stakeholders in the city in relation to disasterriskreduction: All theyinvolved in theResilentBoard or in ResilienceClusterproposed

  27. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Prepare the final version of the report, incorporating the comments and recommendations stemming fromthereview: White book of BCN infrastructure was written as a result of the assessment

  28. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Define the vision of the disaster risk reduction action plan and its mission: Under redaction the basis of “Resilience and Climate Change Barcelona Strategic Plan” • Establish the principles that guide the plan: Formalize the global strategy and actions, related to risk reduction of the city originated by nature, technology or anthropics factors

  29. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Identify programmes to be developed and implemented by the plan: in process the inclusion of Climate Change in addition to Infrastructures and Services • Select which projects—within each programme—will be carried out, based on the priorities established for the short, medium and long term: Actually around 35 projects ongoing and 6 finished. New inclusions in order of priority index.

  30. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Prepare a final plan in easy-to-understand language: Include a task force of resilience in the City Protocol Society. • Give legal validity to the plan to ensure that it serves as the city’s guiding policy for disaster risk reduction: TISU board is approved by Municipal Decree

  31. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan BARCELONA PROCESS • Develop an implementation strategy for the plan with short-, medium- and long-term activities and priorities: tools for priorization of projects are practically ready • Define and clearly organize the structure, responsibilities and roles of all city agencies, actors and the community: The inclusion of the community is pending

  32. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan BARCELONA PROCESS • Establish and guarantee the validity of formal and informal institutional mechanisms that will allow all actors to take ownership of the plan:Ongoing • Establish partnerships and alliances at the local, national and international level for implementation of theplan: Ongoing • Enlist the support of all sectors and actors city-wide in the preparation of the projects under each the disaster risk reduction plan’s programmes:Ongoing

  33. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan BARCELONA PROCESS • Define who is responsible for follow up and monitoring, including the role of the local community and the social/economicsector: Implemented in theresilientBoard • Establish indicators to measure progress and achievement of the plan’s objectives: Partially implemented

  34. How are we implementing the Ten Essentials for Making BCN Resilient? MILESTONE PHASES AND STEPS. UNISDR Phase One Organizing and preparing to apply the Ten Essentials 1.Prepare institutional setting, raise awareness 2. Convene actors, formalize participatory process 3. Plan and execute the process Phase Two Diagnosis and assessment of thecity’srisk 4. Be acquainted with the city’s risks 5. Conduct a risk assessment 6. Analyze the local environment and actors 7. Prepare an assessment report Phase Three Developing a safe and resilientcityactionplan 8. Definevision, objectives and mainactions 9. Define programmes and projects 10. Institutionalize and sustain the disaster risk reduction plan Phase Four Implementing the plan 11. Implementation and resource mobilization 12. Ensure broad participation and ownership Phase Five Monitoring and follow-up 13. Monitor, follow up and evaluate the plan 14. Disseminate and promote the plan • BARCELONA PROCESS • Develop a communications strategy (internal and external) to promote and inform local authorities, • the community and different actors about the gaps, problems, and achievements: Communicates project by project once finished

  35. What did we learn from our experience? Specific Diagnose/assessmentis the first necessary step, but is not enough: Without any action the add value is minimum Methodology was not initially complete: Guarantee business continuity: Improves moving Each improvement project generated by this process, need to complete the cycle: from definition to communication and update Development of resilience projects have to be proportional to the competence of local administration

  36. What did we learn from our experience? Global The first step was a result of a crisis: Don’t expect to happen for work! Is very expensive Don’t wait to finish plans: begin to create resilience now! Collaboration with the rest of the administrations and private enterprises (owners or operating in the city) is essential Great strategical value of global proceeding vs. Isolated projects For common action in global urban scene: collaborative model vs. competitive Adopt an universal standard for sharing the experience: Integration in the city protocol society; adopt and apply the UN terms and collaborate with our experience, together with Academy and enterprises

  37. Barcelona URB-is