INVESTMENT POTENTIAL OF THE KIROVOHRAD REGION

INVESTMENT POTENTIAL OF THE KIROVOHRAD REGION. GEOGRAPHICAL LOCATION. Central part of Ukraine Territory: 24,6 thousand sq. km (4,1% of the total territory of Ukraine ) Population : 996,0 thousand people (2,2% of the total population of Ukraine). MAIN AUTOTRANSPORT DIRECTIONS. Kyiv.

ivy-mooney
Download Presentation

INVESTMENT POTENTIAL OF THE KIROVOHRAD REGION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INVESTMENT POTENTIAL OF THE KIROVOHRAD REGION

  2. GEOGRAPHICAL LOCATION • Central part of Ukraine • Territory:24,6 thousand sq. km • (4,1% of the total territory of Ukraine) • Population: 996,0 thousand people • (2,2% of the total population of Ukraine)

  3. MAIN AUTOTRANSPORT DIRECTIONS Kyiv Ternopol Poltava Striy Luhansk Znamenka Dnepropetrovsk Kirovohrad Krivoy Roh Zaporozhye Donetsk Kyshyniv Nikolaev

  4. MINERAL RAW MATERIAL BASE OF THE KIROVOHRAD REGION Combustible shale Uranium Brown coal Nickel Iron ores Facing stone of different color Gold Graphite

  5. AGROINDUSTRIAL COMPLEXOF THE KIROVOHRAD REGION Agricultural area accounts 2 mlnha (5% of the total agricultural area in Ukraine)

  6. CROP PRODUCTION AND ANIMAL HUSBANDRY Production of the main goods of crop production in 2012: Seed of the sunflower: 908,7 thousand t (10,9% of the total volume of production in Ukraine) Leguminous plants: 2339,4 thousand t (5,1%) Sugar beet: 617,9 thousand t (3,4%) Production of the main products of animal husbandry in 2012: Milk – 309,1thousand t (2,7%) Eggs – 537,0mln items (2,8%) Meat – 67,1 thousand t (live weight) (2,1%)

  7. INDUSTRIAL COMPLEX OF THE KIROVOHRAD REGION

  8. LEADING INDUSTRIAL ENTERPRISES OF THE REGION THE CHERVONA ZIRKA PUBLIC JSC CREATIVE INDUSTRIAL GROUP THE GIDROSYLA GROUP PUBLIC JSC PRODUCTION AND COMMERCIAL COMPANY VELTA LLC THE RADIY RESEARCH AND PRODUCTION ENTERPRISE PUBLIC JSC POBUZHSKIY FERRONICKEL PLANT LLC THE ETAL RESEARCH AND PRODUCTION ASSOSIATION MEAT FACTORY YATRAN ALC

  9. STRUCTURE OF FOREIGN TRADE

  10. COMMODITY STRUCTURE OF EXPORT

  11. INVESTMENT ACTIVITY The main investment partners are: The Netherlands18,8% Russia 10,5% Great Britain 24,3% Israel 2,5% The Virgin Islands (GB) 3,4% Turkey 1,8% Cyprus 27,8%

  12. FOREIGN INVESTMENT BY TYPES OF ECONOMIC ACTIVITY

  13. INVESTMENT PROJECTSWHICH ARE SUCCESSFULLY IMPLEMENTING The ore - processing enterprise which is specialized in mining and processing of ilmenite concentrate from the Birzulovske deposit (2% of the world production of titanium), PRODUCTION AND COMMERCIAL COMPANY VELTA LLC The plant for production of nuclear fuel in the Smolino village of the Kirovograd region The livestock complex for 60 thousand pigs, CREATIVE INDUSTRIAL GROUP

  14. INVESTMENT PROJECTSWHICH ARE SUCCESSFULLY IMPLEMENTING The Svitlovodsk river terminal with the total capacity of single storage of grain about 94 000 t and shipment on water transport 5 000 t per day which is implemented by the group of companies "UKRAGROCOM" and "HERMES-TRADING" The plant for production of fuel pellets from straw with the total capacity of 40 thousand t per year, CREATIVE-AGRO LLC The oil extraction plant with the total capacity of 180 thousand t per year, HRADOLIA LLC

  15. INVESTMENT PROPOSAL Industrial park“Kanatovo” It is planned to create the modern complex of engineering prepared land plots and industrial, storage and administrative facilities which are situated there, on the base of the former military town Kanatovo by the “BROWNFIELD” principle. It is planned to place the solar electric plant at the 200 ha of the adjacent territory. The city of Kyiv - 287 km The city of Znamenka- 30 km The city of Dnepropetrovsk- 236 km The city of Kirovograd- 10 km

  16. ENGINEERING INFRASTRUCTURE Electric power supply: The power of transformer substations is 35/10/0,4 kW. There are 4 transformer substations. The length: cable network of 10 kW - 20,87 km; cable network of 0,4 kW - 37,8 km; air network of 0,4 kW - 10,0 km. Water supply: Water supply is implemented by the plumbing Dnipro-Kirovohrad. The length of the internal water network is 20 km (needs repair). Gas supply: There is a possibility to connect to the network of the Kirovogradgaz Public JSC: before 100 m3 per hour – 1 km; above100 m3 per hour - 6 km.

  17. ARGUMENTS IN FAVOR OF INVESTING IN THE INDUSTRIAL PARK "KANATOVO"

  18. INVESTMENTOBJECT Regional municipalproduction enterprise "Dnipro - Kirovohrad" It provides lifting, cleaning and supply of water to the population more than 500 thousand people, 4 cities of regional value and 60 settlements at the distance 120 km with the capacity of 70,6 thousand m 3 per day. It also provides cleaning and disinfection of wastewaters with the capacity of 51,4 thousand m 3per day. Total project cost accounts 7 mln dollars. Implementation period lasts from 2013 year till 2016 year.

  19. MAIN INVESTMENT STEPS Reconstructionof the block of pollution control facilities of the regional water supply system “Dnipro-Kirovohrad” Reconstructionof the chlorinator roomwith the total capacity of 100 kg of chlorine per hour Reconstructionof the water supply system using energy-saving technologies in the Znamenka city Overhaul of the building of sieve department of pollution control facilities in the Kirovohrad city Reconstructionof the transportation system of sewage to the draining pollution control facilities in the Znamenka city Installation of automated control system and despatchingof working system of sewage pumping stations АCSSB-12 in the Svitlovodsk city Heat recovery of sewage at the MSPS at the Kropyvnyzkyi Street, 185in the Kirovohrad city Installing the automated system with frequency control at the main sewage pumping station (constant discharge of sewage to the pollution control facilities) at the Kropyvnyzkyi Street, 185in the Kirovohrad city

  20. Annual International Investment Forum «Elisavetgrad Investment Day» Annual International Forum «Elisavetgrad Creative City»

  21. THANK YOU FOR YOUR ATTENTION!