1 / 18

S tructures Team

S tructures Team. Team Leader: Jonathan Piccoli Secretary: Nicholas Baker Think Tank Lead: Daniel Morehouse CAD Lead: Parth Patel Design Report: EDSGN 100 Design Project 1. The Structure Team’s Mission Statement.

ivana
Download Presentation

S tructures Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Structures Team Team Leader: Jonathan Piccoli Secretary: Nicholas Baker Think Tank Lead: Daniel Morehouse CAD Lead: ParthPatel Design Report: EDSGN 100 Design Project 1

  2. The Structure Team’s Mission Statement. To design and build economically sustainable, educational, entertaining tech exhibit at ACM as part of SAIN’s tourist circuit to create interest and generate economic activity in the south central PA and MD area.

  3. Table of Contents • The Design Process • Opportunity and Problem Space • Specifications • Brainstorming and Analysis • Solution Examples • Summary • Appendices

  4. The Opportunitywas to design aportion of a self-sustaining circuit using educational tools based on the STEM disciplines. • South Central PA needs more money spent in their area on tourism • Must educate the customer in STEM disciplines • Must use structures in the education process • Located near ACM as part of S.A.I.N.’s loop

  5. From the opportunity we recognize the consumer needs and specifications. The Customer Specifications • Safe for everyone • Is User Friendly • Easy to Setup • Software is interactive • Is visually appealing The Engineering Specifications • In a 14’ x 14’ exhibit footprint • Have 4 computers in the exhibit • Enough K’Nex for 8 children at a time

  6. Brainstorming: The ideas we chose. #1 Computer Bridges #2 K’Nex Building #3 Computer Demonstration

  7. The Exhibit Area All computers have access to both programs Touchscreen technology K’Nex area for building bridges With drawers filled with different parts

  8. This presentation’s most important points.

  9. PowerPoint: References • http://www.knexusergroup.org.uk/acatalog/K78640model4.jpg • http://www.pbs.org/wgbh/buildingbig • http://www.culturaltravelguide.com/wp-content/uploads/2012/03/rollercoaster-islands-of-adventure-hulk-2.jpg • http://www.geekshow.us/wp/wp-content/uploads/2009/04/world_of_goo_pipe.jpg • http://www.100placestotravel.net/wp-content/uploads/2013/02/san-francisco-golden-gate-bridge.jpg • http://amolife.com/image/images/stories/AroundTheWorld/bridges.jpg • http://cdn2.ubergizmo.com/wp-content/uploads/2013/11/chinese-bridge.jpg • http://www.willowboats.com/washnton/tyne%20bridge.JPG • http://www.exponent.com/files/Uploads/Images/toxicology/chemical%20bonding.jpg • http://earthquakes.unlv.edu/outreach/Shake%20Table.JPG • www.google.com/maps

  10. Brainstorming: The ideas we rejected.

  11. Operational and Maintenance Issues • Computer replacement cost • Replacement parts for K’Nex • K’Nex will require sorting and cleanup daily

  12. Gantt Chart

  13. Brainstorming Ideas

  14. Pairwise

  15. Matrix

  16. Concept Sorting

  17. Cost Estimate and Expenses • Startup cost • $3000 • Operating cost • Annually $50 • Once every 4-6 years computer replacement/ upgrade $1300 • Total: 8-12 (Can be scaled up for more people) • Computers: 4 • Building: 4-8

  18. Mission Statement Graphic

More Related