1 / 15

IMPULSREGLEMENT

IMPULSREGLEMENT. FINANCIËLE LUIK. AANZET PROJECTBEGROTING. PER PROJECTJAAR UITGAVEN: PERSONEELSKOST WERKINGSKOST INKOMSTEN: GEVRAAGDE PROVINCIALE SUBSIDIE EIGEN INBRENG ANDERE (SUBSIDIES, SPONSORING, INKOMSTEN, …). IMPULSREGLEMENT.

israel
Download Presentation

IMPULSREGLEMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMPULSREGLEMENT FINANCIËLE LUIK

  2. AANZET PROJECTBEGROTING PER PROJECTJAAR UITGAVEN: PERSONEELSKOST WERKINGSKOST INKOMSTEN: GEVRAAGDE PROVINCIALE SUBSIDIE EIGEN INBRENG ANDERE (SUBSIDIES, SPONSORING, INKOMSTEN, …)

  3. IMPULSREGLEMENT De projectsubsidie kan enkel aangewend worden voor personeelskosten (met een maximum van 60.000 euro/FTE en voor zover het gaat om personeel dat specifiek voor het project aangesteld wordt) en/of werkingskosten (exclusief afschrijvingen). Investeringen worden niet als werkingskosten aanzien.

  4. PERSONEELSKOST PERSONEELSKOST = LOONKOST + OVERIGE PERSONEELSKOSTEN

  5. PERSONEELSKOST LOONKOST = BRUTOLOON + PATRONALE RSZ + PATRONAAL PENSIOEN indien niet vervat in brutoloon: + VAKANTIEGELD + EINDEJAARSPREMIE

  6. PERSONEELSKOST OVERIGE PERSONEELSKOSTEN = - MAALTIJDCHEQUES - VERPLAATSING VAN EN NAAR WERK - KOSTEN VOOR LOONADMINISTRATIE - KOSTEN VOOR VORMING EN OPLEIDING PERSONEEL - VERZEKERING ARBEIDSONGEVALLEN

  7. PERSONEELSKOST MAX. 60.000 euro/FTE = 30.000 euro/HTE = 12.000 euro 1/5 FTE (20%) … = 30,36 euro/uur (38-urenweek) = 32,05 euro/uur (36-urenweek)

  8. PERSONEELSKOST Vb. Projectbegroting Loonkost: 22.843,09 € Werkingskost 7.200,00 € Totaal 30.043,09 € Max. subsidiebedrag= 30.043,09 € x 60% = 18.025,85 € Begrenzing loonkost à 60.000 €/FTE = 17.940,38 € (30,36€/u) Werkingskost 7.200,00 € 25.140,38 € Gevraagde subsidiebedrag is kleiner dan projectkost, rekening houdend met loonbegrenzing => in orde

  9. PERSONEELSKOST • Verantwoording personeelskost: • loonfiches van de personen die voor het project aangesteld werden • facturen (sociaal secretariaat, verzekering arbeidsongevallen, …)

  10. WERKINGSKOST • Ontwerp projectbegroting: • Aanzet rubrieken – duidelijkheid • Andere rubrieken mogelijk • Verplaatsingskosten • GEEN overheadkosten

  11. WERKINGSKOST - INVESTERINGEN Meubilair en hardware worden ALTIJD als investering beschouwd! Info: L:\ImpulsOndersteuning\Impulsreglement\Reglement\Keuze_investering_vs_kost.pdf

  12. WERKINGSKOST - INVESTERINGEN • INVESTERINGEN = tegelijk aan volgende 3 voorwaarden voldoen: • Per stuk + 1.000 euro, excl. BTW • Duurzaam (geen verbruiksgoed) • Waarde over meerdere jaren

  13. WERKINGSKOST - INVESTERINGEN Herstellings- en onderhoudswerken = investering als er tegelijk aan volgende 3 voorwaarden voldaan is: - de waarde verhoogt - duurzaam - meer dan 1.000 euro excl. BTW

  14. WERKINGSKOSTEN AANDACHTSPUNT: VERANTWOORDING ALTIJD MET FACTUREN mee te geven vóór de start van het project

  15. WERKINGSKOST • OFWEL facturen voor project apart • OFWEL facturen voor een groter geheel met een VERDEELSLEUTEL, maar dan moeten alle facturen ook als verantwoording binnen gebracht worden • VB. Organisatie met 30 FTE • Project met 3 FTE • => 3/30 van verantwoorde kosten is ten laste van het project

More Related