An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILC Valencia WorkshopNovember 6 – 11, 2006DC Magnet Power Supplies Paul Bellomo – SLAC Michael Tartaglia – FNAL

  2. Background and Scope • Design of magnet power systems May 2006 • Scope is DC magnet PS and associated controls for all 5 machine areas • Spreadsheet • 90,000 data input and calculations • Magnet and power supply quantities and parameters • Losses for magnets, cables and power supplies • Required AC input power • Cooling water requirements for power supplies • M & S Costs for power supplies and associated controls • Investigating costs for EDI, Assembly, R&D efforts and contingency

  3. M & S Cost Summary

  4. Power System - Normal T, Ind, Rack-Mounted

  5. Power System - Normal T, String, Freestanding

  6. Power Sys - Superconducting, Ind, Rack-Mounted

  7. Cost Breakdown by Area

  8. Component Cost Breakdown

  9. M & S Cost Estimate Basis

  10. Determining EDI and Assembly Costs PEP II and SPEAR 3 - SLAC projects include local controls, no long-haul cables or raceways or installation. Power systems costs. No superconducting magnets WQB is a FermiLab large quadrupole magnet design and fabrication project Main Injector project includes MANY things (Civil Const. and new 345kV substation, power systems, RF, controls, instrumentation – a complete accelerator)

  11. Other Cost Estimates Needed • Identify Engineering/R & D items and associated costs • Redundant PS controller with EPICS IOC • Redundant PLCs and FPGA-based PACs • Redundant PS configuration • Quench and lead voltage detection and protection • Identify risk factors and contingencies

  12. Magnet Power System M & S Cost Reductions • Implemented • DC power cable sized for NEC ampacity, yet large enough to keep tunnel heat loading reasonable (Damping ring exception) • Power supply rated Vo and Io as close as possible to 10% of expected operation for standardizing • Elimination of one Positron Damping Ring • BDS change 20mR-2mR to 14mR-14mR configuration • Future • Investigate smaller, less-expensive PLCs and PACs • 18,000 magnets - 13,000 power supplies. More magnets connected as strings will reduce power supply and controls quantities • Possible use of Bulk PS to power several redundant PS • Additional vendor quotes based on supplying larger quantities

  13. A Look at Power Dissipations

  14. Power and Losses by Area

  15. Bulk PS Model Design Criteria • Why Needed • Off-line PS to magnet cable connection are expensive and heat losses excessive – new bulk PS topology needed • Advantages • Eliminate or vastly reduce 3.3MW of cable heat in tunnels • Lower cable cost • Smaller, less expensive power supplies • Disadvantages • DC-DC converters are in the tunnel • Magnet designs/styles will be constrained to operate within a limited voltage range

  16. Bulk PS Model

  17. Bulk PS Design Criteria • Design criteria • Busbar loop, but not closed • Busbar flat parallel plate to minimize self-inductance • Busbar is insulated to prevent shock and for prevent short circuits • Place bulk PS at loop center to minimize bus current, cross-section and voltage drop • Keep the DC-DC converter duty factor low (higher bulk to load voltage for lower busbar current) • Feed both e+ and e- rings from a common bulk PS/bus for better usage • DC-DC converters are in the beam tunnel underneath magnets • DC-DC converters have input and output common mode filters

  18. The Bottom Line – Last Slide • Summarized status and basis of power system cost estimates • Complete cost estimate by end of calendar 2006 • M & S cost of present PS configuration is cost placeholder • Derive the basis for ED & I and Assembly costs • Identify and prioritize R & D costs, risk factors and develop contingency factors • Future M & S cost reductions are very promising • Continue engineering evaluation of bulk PS topology for Damping Ring PS. Consider wider use if feasible • Components are ripe for economies of larger scale • Controls technology is moving rapidly into redundancy • Possible LINAC magnet/PS quantity reductions