140 likes | 240 Views
The U.S. Department of Energy Environmental Management. Intergovernmental Meeting Snowbird, Utah EM Budget Overview Cynthia Rheaume EM Director of Budget October 17, 2007. DOE Generator Site (no on-site disposal facility). Sites are closed. DOE’s Waste Disposal Complex. Hanford.
E N D
The U.S. Department of EnergyEnvironmental Management Intergovernmental Meeting Snowbird, Utah EM Budget Overview Cynthia Rheaume EM Director of Budget October 17, 2007
DOE Generator Site (no on-site disposal facility) Sites are closed DOE’s Waste Disposal Complex Hanford West Valley Knolls Idaho NationalLab Fermi Ames Ashtabula Mound Argonne Nat’l Lab Bettis Lawrence Berkeley Nat’l Lab Fernald BCL Kansas City Nevada Test Site Rocky Flats Portsmouth Brookhaven Lawrence Livermore Nat’l Lab Paducah Stanford Linear Accelerator Center Sandia Los Alamos Nat’l Lab Oak Ridge Princeton Sandia Energy Technology Engineering Center Inhalation Toxicology Research Institute General Atomics Savannah River Pantex Plant WIPP Legend CERCLA Disposal Facility Low Level Waste Operations Disposal Facility Mixed Low Level WasteOperations Disposal Facility Regional Low Level Waste Disposal Facility Yucca Mountain repository for High Level Waste/Spent Nuclear Fuel disposal Waste Isolation Pilot Plant (WIPP) for Transuranic waste disposal
EM Funding History $ in billions
Major EM Accomplishments Site Completions • 86 out of 108 sites Liquid Tank Waste • Long-lead procurement and construction underway on Waste Treatment Plant, Sodium Bearing Waste Treatment Facility, and Salt Waste Processing Facility • All empty unused tanks grouted at Idaho National Laboratory • Over 2500 cans of vitrified high-level waste produced for disposal Other Waste • TRU / WIPP – Disposed of over 50,000 cubic meters of contact-handled TRU waste – Initiated disposal of remote-handled TRU waste • Low-Level and Mixed Low-Level – Approaching 1 million cubic meters disposed
Major EM Accomplishments (cont’d) Uranium/Plutonium • Initiated consolidation of weapons-usable surplus Pu from Hanford, Los Alamos, and Livermore to Savannah River • DUF 6 Conversion Facilities at 70% completion • all DUF6 cylinders now on-site • Long-lead procurement and construction underway on Building 3019 U-233 Conversion Project Other Remediation • Decontaminated and decommissioned over 1700 nuclear, radioactive and industrial facilities • Stabilized more than 100 contaminated groundwater plumes, and remediated over 6,500 release sites
EM Risk-Based Priorities Highest Risk-Based Priorities • Minimum safety and essential services across EM cleanup sites • Radioactive tank waste waste storage, treatment, and disposal (including technology development and deployment activities in support of high-level waste) • Spent nuclear fuel storage, receipts and disposition • Special nuclear material storage, processing, and disposition • High priority groundwater remediation (selected Hanford, Paducah and Los Alamos plumes) • Solid waste (transuranic and mixed/low-level waste) treatment, storage, and disposal Lower Risk-Based Priorities • Soil and groundwater remediation • Nuclear facility D&D • Non-nuclear facility D&D
Near-Term Scheduled Site Closures • Inhalation Toxicology Laboratory NM • Pantex Plant TX • Lawrence Livermore National CA • Laboratory-Site 300 • Miamisburg Environmental OH • Management Project • Sandia National Laboratories NM • Argonne National Laboratory-East IL • Stanford Linear Accelerator CA 2008 LLNL (Site 300) ANL-E Stanford Inhalation Lab 2009 Miamisburg SNL 2010 Pantex
FY 2008 Budget Composition Other is comprised of: Program Direction, Technology Development, Contribution to the D&D Fund, Uranium/Thorium Reimbursements, Headquarters, and Community and Regulatory Support
Management Initiatives • Maintain and demand highest safety performance • Assure effective identification and management of risks • Performance • Dealing with increased scope and requirements • Independent reviews – technical, cost, and schedule • Validate project costs, schedules, and assumptions • Improve senior management focus on project execution • Provide additional training for Federal managers and staff to enhance project management, and acquisition skills • Implement more effective acquisition process • Contract type • Fee structure • Ensure real-time feedback and application of lessons learned • Ensure proper organizational alignment of functions, authorities, and people
Washington SouthCarolina EM Program FY 2008 Budget EM Budget $5.7 Billion New York Idaho Nevada Ohio Kentucky Tennessee New Mexico Legend: Over $1 billion $300 million to $1 billion $50 million to $300 million
Summary • Budget based on prioritized risk reduction • Ensure all EM activities are conducted safely, and in accordance with environmental laws and regulations • Strive for operational excellence through technology, process improvement, innovation, effective project management, and high standards/accountability • Maintain effective communications with stakeholders • Accomplish our mission through partnering with industry and other stakeholders • New and improved EM website at www.em.doe.gov