  • Uploaded on

Asbestos Issues for Facility Management. Darryl Watson, CIH, CSP, JD Cardno ATC Marietta, GA. 7-13. Asbestos in Use. There are more the 3000 products that have contained asbestos Some were made in the US, some imported Almost all building products contained asbestos at one time or another

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
Download Presentation

PowerPoint Slideshow about 'Asbestos Issues for Facility Management' - iliana

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
asbestos issues for facility management

Asbestos Issues for Facility Management

Darryl Watson, CIH, CSP, JD

Cardno ATC

Marietta, GA



Asbestos in Use

  • There are more the 3000 products that have contained asbestos
    • Some were made in the US, some imported
    • Almost all building products contained asbestos at one time or another
    • There has never been a regulation that requires the removal of asbestos from buildings merely because it is present
    • Nor have all asbestos-containing materials been banned in the US
6 regulated asbestos minerals
6 Regulated Asbestos Minerals
  • Chrysotile - most common – White
    • >90% of products in US
  • Amosite - less common - Brown
  • Crocidolite - uncommon – Blue
    • Amosite & crocidolite most common in pipe & boiler insulation
  • Others - Tremolite, Actinolite, Anthophyllite sometimes found as contaminants with other minerals such as talc and vermiculite
asbestos containing materials acm
Asbestos Containing Materials (ACM)
  • A material containing >1% asbestos
    • A term global to EPA and OSHA
  • Accredited Inspectors perform surveys and issue reports
  • Sample Analysis
    • ACM has to be determined using laboratory techniques, not by “naked” eye
    • “Bulk” samples are analyzed by polarized light microscopy (PLM)
    • Results contain type and percentage of asbestos and other fibrous material
friable intact acm
Friable & Intact ACM
  • Friable (EPA): material, that when dry, may be crumbled, pulverized or reduced to powder by hand pressure
    • EX: Such pipe insulation or fireproofing
  • Intact (OSHA): means that the ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.
surfacing material sm
Surfacing material (SM)
  • Material that is spray or trowel applied; generally to ceilings and structural steel

Modern non-ACM Fireproofing

Can look like older ACM fireproofing

ACM fireproofing banned in 1973

thermal system insulation tsi
Thermal System Insulation (TSI)
  • Insulation materials on systems such as: boilers/steam delivery, chilled water, condensate returns and ductwork
  • Prevents heat gain or loss

If undamaged..

EPA & OSHA allow in-place management

Undamaged TSI

miscellaneous materials
Miscellaneous Materials
  • A broad spectrum of ACM’s that do not fall into the categories SM or TSI

Resilient Floor Coverings (RFC)

Floor Tiles, Linoleums, and Mastics (glue)

In good shape on the left

Damage on the right should be repaired or removed

wallboard joint compound tape
Wallboard Joint Compound & Tape

Recent construction

Older construction



Roof Felts, Coatings and Flashing

Roof materials (flashing, cements and coatings) may STILL contain asbestos materials in new construction


Electrical Applications

Asbestos cloth used to insulate electrical lines


Federal Asbestos Regulations

Common to day-to-day asbestos control work

Always check for State/Local program requirements!




40 CFR Part 61

Subpart M

Demolition, renovation and waste issues

Inspections prior to disruption


Required removal

Waste packaging & approved landfills

Waste shipment records

General Industry

29 CFR 1910.1001

Permissible exposure limits and exposure assessments

Inspection before exposures


Worker protection;

Respiratory protection must meet

29 CFR 1910.134


Mandatory appendices


29 CFR 1926.1101

Permissible exposure limits and exposure assessments

Inspection before exposures


Worker protection;

Respiratory protection must meet

29 CFR 1910.134

Classes of asbestos disturbing work (I-IV)

Significant work practice requirements


Mandatory appendices


40 CFR Part 763

K-12 schools, public and private

Inspections & Assessments

Management Plans


Training requirements

Abatement final clearance issues

Worker Protection Rule

40 CFR Part 763 Subpart G

OSHA protection for those in State/Municipal employment

osha definitions
OSHA – Definitions
  • Presumed Asbestos Containing Material (PACM)
    • Surfacing Materials and TSI in buildings constructed through 1980
    • Also: (k)(1)(i) Flooring and Adhesives installedin buildings constructed through 1980
  • This was not a ban!
    • OSHA has not banned any ACM
  • Also of note: (k)(1)(1)(i) - Other materials that are known or should have known to contain asbestos; “due diligence” (simply; sample before exposure)
osha communication requirements of the owner
OSHA CommunicationRequirements of the Owner
  • 1926.1101(k)(2)(ii)
    • Inspect for ACM/PACM Prior to Disruption
      • “Before work subject to this standard is begun, building and facility owners shall determine the presence, location, and quantity of ACM and/or PACM at the work site…”
        • In most cases, this will require an accredited inspector following AHERA survey requirements
osha communication requirements of the owner1
OSHA CommunicationRequirements of the Owner
  • 1926.1101 (k)(2)
    • Notify the Following:
      • Prospective Employers applying or bidding for work
      • Employees of the Owner
      • Multi-employer worksite employers and employees
      • Tenants
        • Applies to commercial renters, not apartment dwellers etc.
      • This applies to those in or adjacent to areas containing such material
osha communication requirements of the owner2
OSHA CommunicationRequirements of the Owner
  • Employers working at the Owner’s site have responsibilities, 1926.1101 (k)(4)
    • …all employers who discover ACM and or PACM…shall convey info concerning presence, location & quantity…newly discovered ACM/PACM to the owner, other employers of employees…within24 hours
  • General contractors: have responsibility to assure that the abatement contractor is in compliance
epa neshap use installation bans
EPA NESHAP Use/Installation Bans
  • 1973 (fireproofing),
  • 1976 (TSI, spray/toweled acoustical) and
  • 1978 (decorative material),
  • The following asbestos containing materials are banned:
      • Corrugated Paper
      • Rollboard
      • Commercial Paper
      • Specialty Paper
      • Flooring Felt
      • Any other new uses of asbestos
  • 1977 CPSC, asbestos tape & joint compound
    • Homes & schools, persisted commercially for some time, imports
acm not banned
There are many products yet in the market place that can get into new construction

ACM not subject to the current bans…a few:

asbestos cement

corrugated and flat sheet

asbestos cement pipe

asbestos cement shingle

pipeline wrap

vinyl asbestos floor tile


asbestos clothing

Friction products

disc brake pads

drum brake linings

automatic transmission components

clutch facings

brake blocks

gaskets & packings

roofing products

typically flashing & cements

caulks, putties, glues & mastics of all kinds

ACM Not Banned
asbestos inspections
Asbestos Inspections
  • The terms “survey” is most commonly used today
  • Surveys are required by regulations under:
    • AHERA – Schools K-12; requirements are well defined within the regulation
    • NESHAP; Demo/Renovations, must inspect for all possible ACMs prior to disruption; notifications
    • OSHA; Worker protection; inspection and communication before disruption
environmental site assessments esa or phase i
Environmental Site Assessments (ESA) or “Phase I”
  • These are NOT designed to meet regulatory requirements as an asbestos inspection
    • ASTM E-1527-05…asbestos is excluded
  • Despite reporting language (caveats) in the ESA report…clients often believe they have an asbestos inspection
  • Limited asbestos surveys or “screens” (ASTM E-2308) are also NOT compliant with required regualtion-required sampling protocols
ahera requirements
AHERA Requirements
  • Must sample the following and categorize:
  • Surfacing Materials
    • Fireproofing, textured ceilings etc.
  • Thermal System Insulation
    • Pipe and boiler insulation etc.
  • Miscellaneous Materials
    • Basically everything else; floor tiles, ceiling tiles, wallboard joint compound, mastics, etc.
  • Assess All Friable Materials
    • And non-friable ACM which have become friable
    • This is to describe the condition of the friable ACM
      • For management purposes
osha requirements
OSHA Requirements
  • For buildings constructed before 1981, suspect surfacing material and TSI must be assumed to be ACM or tested
  • Sheet flooring or floor tiles & mastics installed before 1981 must be assumed to be ACM or tested
  • OSHA “due diligence” for any material
  • Must sample and communicate prior to disruption
    • Sample BEFORE exposure; may be limited in scope
  • The sampling and analytical portion of the survey must be conducted in accordance with AHERA
neshap requirements
NESHAP Requirements
  • National Emission Standard for Hazardous Air Pollutants (NESHAP)
    • Demolition and renovation activities & waste
    • NESHAP requires:
      • inspection prior to disturbance
        • A THOROUGH survey!
        • NESHAP has no “end date” when surveys must be performed
        • An AHERA survey is often not adequate; usually do not sample exteriors or perform invasive sampling (walls, floors)
      • categorize based on friability (NESHAP categories)
      • removal of RACM prior to renovation or demolition
      • notification for all demos and most renovation activities
managing survey data
Managing Survey Data
  • An asbestos survey acts as your inventory of what materials are ACM and where they are found
  • A survey is only useful in the long term IF that inventory is kept up to date!
  • This requires management of when ACM is removed and to then update the survey info
managing survey data1
Managing Survey Data
  • The old school method: the file cabinet
    • Can you or your staff access this when needed?
  • The new school; electronic data management of this info
    • Allows for easier access to data and for updating as materials they are removed
    • Spreadsheets or databases, CAD drawings, GIS system info
    • Whichever is chosen, it needs to be standardized across offices
managing survey data2
Managing Survey Data
  • The bottom line:
    • Can you inform a staff member or contractor if a material that will be disturbed is ACM or not?!
    • Can you plan for renovations or demo?
      • Proactive vs. Reactive
      • EPA asbestos NESHAP requires a thorough survey before renovation or demo & removal of RACM as required
    • Can you plan for operations & maintenance (O&M)
      • Applies to in-house and subcontracted work
types of certifications
Types of Certifications
  • EPA & OSHA require those that perform asbestos work are certified
    • Asbestos Inspector; performs the survey
    • Management Planner; write O&M plans etc.
      • Certification a matter for school work (AHERA)
    • Project Designer; those that write plans/specs for abatement activities
    • Supervisor/Worker; those that perform/manage abatement activities
    • Project Monitors; those that manage abatement activities and provide air sampling services
      • Certification is by State/Local program here
    • State/Local program may also require licensing
in house or subcontracted acm survey
In-house or Subcontracted ACM survey
  • Depends on the scope of the survey
      • What is the purpose?
    • If subcontracted remember to define
      • What will be sampled/assumed?
        • EPA and OSHA allow “assume” ACM
      • What will be quantified? How accurately?
      • What will be accurately located on a floor plan?
      • What is the deliverable; the final report?
in house or subcontracted abatement
In-house or Subcontracted Abatement?
  • O&M or removal
    • Can be performed in-house
      • Training, medical monitoring, fit testing, waste issues, specialized equipment (HEPA vacuums, glovebags etc.)….
    • Subcontractor
      • Availability of qualified, certified firms
        • In some areas these are abundant, not all
      • Cost
        • Level of detail of work, location of client, State/Local regs
        • Facility security issues; nights/weekends? badging?
osha classes of work knowing these work classes is important
OSHA Classes of WorkKnowing these work classes is important
  • Class I
    • Removal of surfacing material, TSI or PACM
    • Training: 4 day worker, 5 day supervisor (AHERA)
    • Can perform all classes of work
  • Class II
    • Removal of other than surfacing and TSI
    • EX: flooring, ACM cement siding, mastics, roofing, wallboard
    • Training same as Class I if all Class II performed
    • Single media (task) 8 hr min worker training
      • If trained to one type of work; roofers common
    • Supervisors: in most cases 5 day training
osha classes of work
OSHA Classes of Work
  • Class III
    • Asbestos Surveys; Inspector is subject to Class III requirements
    • Maintenance & Repair
    • Non-removal (same as AHERA O&M)
    • 1 glovebag, mini-enclosures (2 workers max.), 1 waste bag (1/3 – 1/2 full), 60”x60” bag max
    • 16 hour training
  • Class IV
    • Maintenance & custodial cleaning activities, incidental contact or incidental to construction (Class I, II, III)
    • 2 hour awareness training

All work classes have annual refresher requirements

closing the loop
Closing the Loop
  • No matter if the survey or abatement is completed by a vendor or in-house…
    • If the data in not managed, the program will fail
      • Cost of periodic re-inspections
      • Cost of reactive responses and OSHA matters
      • ACM disturbance issues
    • A program must be managed or liabilities can result that can be disruptive and expensive