Raw Material Security for Indian Steel Industry. By : Mr.P.C.Gupta Ex-CMD,NMDC Ltd and Advisor for Mining and Steel Sector. Table:1 Raw material requirement for projected Crude Steel production during 12 th Five Year Plan (Base Case) . (Million Tonnes ) .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Raw Material Security for Indian Steel Industry' - ilario


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
raw material security for indian steel industry

Raw Material Security for Indian Steel Industry

By : Mr.P.C.Gupta

Ex-CMD,NMDC Ltd and Advisor for Mining and Steel Sector

slide2

Table:1

Raw material requirement for projected Crude Steel production during 12th Five Year Plan (Base Case). (Million Tonnes)

  • *Source : working group report on steel industry for the 12th five year plan
  • * Based on GDP of 9%. May undergo change in the light of further developments in India & the world.
  • On the basis of GDP growth rates of 7.0 & 8.0% (Base case), the cumulative requirement of raw material at the end of the year is shown in the
  • Table-2 up to 2040-41.
slide3

Table - 2

Cumulative raw material requirement for projected Iron and Steel production

With GDP elasticity of steel demand assumed as 1.14 from the Year 2016-17 to 2040-41. (million Tonnes)

Note: While calculating requirement of Ferro-manganese, Silico manganese and Manganese ore, crude steel production has been considered only. Ferro and silico manganese towards exports, other uses of manganese in other industries and requirement of ferro-manganese in stainless steel industry has not been considered.

Because of vastness of the subject, this paper deals with only iron ore & coal, the two most important raw materials..

slide4

Table - 3

Resources of iron ore in India as on 1.4.2010

million tonnes

(Source: Indian Bureau of Mines, Ministry of Mines)

slide5

Table – 4

Production / Consumption / Export of Iron Ore

(million tonnes)

  • Source: For production and consumption: IBM
  • For Export: MMTC (Department of Commerce).

For import: http://www.commerce.nic.in; DGCI&S, Kolkata

  • @ Estimated by Ministry of Steel
slide6

Table- 5

Projections for the domestic demand of iron ore during 2019-20 to 2040-41

(million tonnes)

*Including requirement for merchant pig iron units

slide7

Table– 6

Cumulative Iron Ore demand during 2010-11 to 2040-41

Note:* Total Iron ore demand includes actual production of 2010-11 and thereafter projected demand of iron ore as discussed above and also includes demand of iron ore by merchant pig iron units

slide8

Table - 7

TRENDS OF PRODUCTION OF WASHED COKING COAL

Million tonnes

Source: Provisional Coal Statistics: 2010-11, Ministry of coal

slide9

Table: -8

Supply of non coking coal to sponge iron units

(in million tonnes)

Source: Provisional Coal Statistics: 2010-11, Ministry of Coal

slide10

Table-9

Demand for Coking and Non Coking Coal for 12th Five Year Plan

Note: * Total coking coal demand includes those for merchant pig iron units as well.

slide11

Table No – 10

Estimation of demand for Coal during 2016-17 to 2040-41

(million tonnes)

Note:* Total Coking Coal demand includes those for merchant pig iron units as well

slide12

Table No – 11

Cumulative Coking & Non-Coking Coal demand for iron and steel industry during 2010-11 to 2040-41

In Billion Tonnes

Note:* Total Coking & Non Coking Coal demand includes actual supply of 2010-11 and projected demand of coal from 2011-12 to 2040-41 and also includes demand of merchant pig iron units as well.

slide13

Annexure-1

Reserves/Resources of Iron ore (Haematite) As on 1.4.2010 (P) (By State)

Source: IBM

slide14

Annexure - 2

Type wise Coal Resources as on 1.4.2011

slide15

Annexure 3

Coal Production Trend in India