1 / 31

K L →π 0 νν 探索実験 KEK-PS E391a における Run3 データ解析の現状

K L →π 0 νν 探索実験 KEK-PS E391a における Run3 データ解析の現状. JPS 2008 Spring Meeting Hideki MORII (Kyoto Univ.). Overview. Contents. Introduction E391a Run3 Detector Upgrades in Run3 BA (calibraion plot) APC (calibration / g-tagging) Current Status & Strategy for Run3 analysis

ila-barrett
Download Presentation

K L →π 0 νν 探索実験 KEK-PS E391a における Run3 データ解析の現状

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KL→π0νν探索実験 KEK-PS E391aにおけるRun3データ解析の現状 JPS 2008 Spring Meeting Hideki MORII (Kyoto Univ.)

  2. Overview Contents • Introduction • E391a Run3 • Detector Upgrades in Run3 • BA (calibraion plot) • APC (calibration / g-tagging) • Current Status & Strategy for Run3 analysis • calibration • MC development • Run3 data quality check • Optimize cuts • Plan • Summray

  3. Introduction E391a Run3 • E391a • KL→π0νν measurement @ KEK 12GeV PS • pilot experiment for J-PARC E14 • Three data taking • Run1 : Feb 2004 – Jul 2004 • Run2 : Feb 2005 – Apr 2005 • Run3 : Nov 2005 – Dec 2005 • Run3 • Detector Upgrade • new Back Anti (in-beam g veto) • Aerogel Photon Counter (g-tagger) • Data Taking • (almost) stable DAQ condition

  4. Introduction Detector Upgrade in Run3 • aaa Back Anti Upgraded Aerogel Photon Counter (APC) Added

  5. Introduction Back Anti Upgrade • In-beam g veto counter Back Anti construction PWO crystal Upgraded

  6. Introduction e+ γ e- Cerenkov light Aerogel Photon Counter • Prototype of E14 BA Aerogel Photon Counter (APC) Added

  7. Introduction KEK 12GeV PS East Counter Hall A-line C-line E391a Run3 Data • Full Intensity Run (C only mode) • with Be aborber • ~583000 spills • ~70% of Run2 data • Half Intensity Run (A&C mode) • w/o Be absorber • ~98000 spills • ~10% of Run2 data c.f. ) Run2 • with Be absorber • ~860000 spills ※ ※ Be absorber to reduce neutron (betteer n/K ratio) # of KL ~60% / # of n ~ 40% ※

  8. Strategy for Run3 Analysis Strategy for Run3 Analysis Step0 Preparation Calibration [MC] Develop Run3 MC Step1 Confirmation [Data] Data quality check [MC] MC mass production Step2 Optimization kdecay, halo-n, eta [Data] Cut optimization Step3 Physics Output Results

  9. Step0 : Preparation Step0 : Preparation Step0 Preparation Calibration [MC] Develop Run3 MC Step1 Confirmation [Data] Data quality check [MC] MC mass production Step2 Optimization kdecay, halo-n, eta [Data] Cut optimization Step3 Physics Output Results

  10. Step0 : Preparation Step0 : Preparation • Calibration • completed (including upgraded / new detectors) • MC development • detector upgrades are implemented • now under middle-size production : confirming results • preparing for mass-production

  11. Step0 : Preparation Back Anti Upgrade Run2 BA • Upgrade Back Anti • lead plate + plastic scinti. + quartz ->PWO crystal + quartz • segmentation : longitudinal -> transverse • Benefits • better n/g separation (shower shape analysis) • lower rate (typ. 1/2 @ center crystal) beam Run3 BA

  12. Step0 : Preparation MIP peak with Muon Run ADC count Calibration of Back Anti • Calibration • Calibration has been done with Muon Run Muon Run : use m from upstream (with beam shutter closed) MIP peak

  13. Step1 : Confirmation Step1 : Confirmation Step0 Preparation Calibration [MC] Develop Run3 MC Step1 Confirmation [Data] Data quality check [MC] MC mass production Step2 Optimization [Data] Cut optimization kdecay, halo-n, eta Step3 Physics Output Results

  14. Step1 : Confirmation Step1 : Confirmation • Confirm Run3 data quality • compare with Run3 MC : MC middle size production • compare with Run2 data KL-> 3p0-> 6g sample, 4g (KL-> 2p0-> 4g), 2g Invariant Mass of 6g sample Run2 Run3 Mass (GeV/c2) Mass (GeV/c2) Matchs well -> CsI calibration is good in Run3

  15. Step2 : Optimization Step2 : Optimization Step0 Preparation Calibration [MC] Develop Run3 MC Step1 Confirmation [Data] Data quality check [MC] MC mass production Step2 Optimization [Data] Cut optimization kdecay, halo-n, eta Step3 Physics Output Results

  16. Step2 : Optimization Step2 : Optimization • Develop complete BA veto (algorithm, threshold, etc…) • Study with Run2 opened box • to get more acceptance • optimize veto & event selections Acceptance Loss / Rejection Power in Run2 kinematic cut Veto

  17. Plan Plan Step0 Preparation Calibration Completed OK [MC] Develop Run3 MC Almost done Step1 Confirmation [Data] Data quality check Ongoing (~1-2 month) [MC] MC mass production Step2 Optimization ~4-5 month kdecay, halo-n, eta [Data] Cut optimization In parallel with MC mass prod. Step3 Physics Output Results

  18. Summary Summary • E391a Run3 • Data : ~70% of Run2 (~80% with A&C mode) • Detector Upgrade • Upgraded Back Anti (BA) : in-beam g-veto • New Aerogel Photon Counter : prototype of E14 BA • both worked well • Current Status • calibration is completed • finalizing MC development • Now checking data quality • Future Plan • Develop BA veto • Precise study with Run2 opened box for more acceptance

  19. backup

  20. The E391a experiment • KL production with KEK 12GeV PS • Slow extraction • K0 beamline in the East Counter Hall • Intensity • 2 x 1012 protons on target (POT) per 2sec spill, 4sec cycle • production angle: 4°, KL peak momentum 2GeV/c, n/KL ratio: ~40 • Physics runs • Run I: February to July of 2004 • “Express” analysis with 10% data published in PRD (2006) • Run II: February to April of 2005 • The main topic of this seminar • Full data analysis • Integrated protons: 1.4x1018 POT • ~ 32 days without break • Run III: October - December of 2005 • Calibration ready, MC development in progress

  21. halo/core ~10-5 5cm Principle of the experiment • require 2 photons • Hermetic veto system • measure the photon energies and positions • reconstruct the decay vertex on the beamline assuming M2γ = Mπ0 • require missing PT and the vertex in the fiducial region • “Pencil” beam lineto improve PT resolution • 8cm diameter @ 16m from the target

  22. Features of E391a apparatus CsI calorimeter Front Barrel (FB) • Decay region • High vacuum: 10-5 Pa • to suppress the backgroundfrom interactions w/ residual gas • Detector components • Set in the vacuum: 0.1 Pa • separating the decay regionfrom the detector regionwith “membrane”: 0.2mmt film Charged Veto (CV) Main Barrel (MB)

  23. Step0 : Preparation e+ γ e- Cerenkov light Aerogel Photon Counter • Aerogel Photon Counter (APC) • Aerogel Cherenkov counter : only sensitive to fast particle • insensitive to neutrons / sensitive to g shower • Can be used as photon tag counter (for BA study) • prototype of E14 BA Pb convertor : 2mm thick (~0.3 X0) Aerogel : 30cm(x) x 30cm(y) x 5cm(z)

  24. Step0 : Preparation Calibration of Aerogel Photon Counter • Light yield • calibrated with Muon Run • MIP peak appears clearly • Photon Tagging • checked with KL decay • 2 MIPs (= e+e-) peak seen Muon Run Physics Run (KL decay sample) MIP peak ~300count 2 MIPs peak ~ 600 count ADC count ADC count

  25. Response to photons (3) • Clear peak around 15 p.e. is observed. • Response to photon is well reproduced by MC. • Tagging quality is 94 % (#p.e. > 10).  will be improved by using (for example) 5 g sample. 15 p.e. N-cluster trigger Accidental trigger (TMON) (Black) – (Red)

  26. Mechanism of CV Background odd even+extra fusion 1g from p0 + extra and 2g extra

  27. Mechanism of CV background • removing Veto : odd & p01g+extra • removing g-selection : even+extra • with bifurcation for each mechanism, even+extra is dominant tighten loosen

  28. Analog each out Electronics and DAQ Digital out for timing PMT • Number of channels • CsI calorimeter: ~600ch • Veto counters: ~400ch • “AmpDiscri” Module • Discrimination for TDC • Set near the detector • low noise • min. threshold: ~0.5 mV (ex. ~0.7MeV for CsI) • 8ch sum for the trigger • Trigger • Logic • CsI hardware clustering (thres. 80MeV) + Veto (20-100MeV) • ~300 events / 2 sec spill = 150Hz • DAQ live time • ~90% 8ch PMT AmpDiscri Analog sum out CsI Veto Trigger logic FASTBUS ADC FASTBUS ADC TKO TDC FASTBUS-VME FASTBUS-VME TKO-VME GbE Event Builder Storage

  29. Problems in Run-I • core neutron background • hitting on the membranesagging into the beam-line

  30. Result from Run-I 1week • Using 10% of Run-I data • set new limit • Br < 2.1x10-7 (@90%C.L.)(PRD 74:051105, 2006)

  31. Strategy for Run3 Analysis Can we speed up MC mass production? • Halo-n needs large amount of MC • needed 3 months in Run2 halo-n MC • in Run2 analysis, we used bifurcation method for CV bg • Recycling Method • collect only BG-like events with strong online-veto (discard “safe” events in production stage) • then, full simulation for “dangerous” events

More Related