Metering at Veolia Water Southeast. Ian McAthy Metering and Water Efficiency Manager November 2010. Why Meter?. Statutory Water Resources Management Plan 2009 30 year forecast Water Resource Availability Water stressed area Reliant on groundwater sources – no rivers of sufficient size

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Metering at Veolia Water Southeast' - ida


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Metering at Veolia Water Southeast

Ian McAthy

Metering and Water Efficiency Manager

November 2010

why meter
Why Meter?
  • Statutory Water Resources Management Plan 2009
    • 30 year forecast
  • Water Resource Availability
    • Water stressed area
    • Reliant on groundwater sources – no rivers of sufficient size
    • EA consider area over abstracted – looking to reduce public water supply abstractions
  • Demand For Water
    • Increasing population
    • Rising number of lower occupancy properties – leads to higher per property usage
  • Long term planning shows we need to manage demand
    • Unmeasured / fixed cost – no incentive to reduce demand
    • Metering / paying for what you use incentivises careful use
metering activities to date
Metering Activities To Date

Commercial Customers

All main commercials metered

Remaining few being swept up during zonal metering

Domestic Customers

All new properties since 1990’s

Free Meter Option since 1995

Change of Occupier April 2005 to March 2007

“Water Scarcity Status” in March 2006

Zonal Compulsory Metering – commenced in Lydd Jan 07

PR09 Final Determination 90% domestic by April 2012

slide4
Veolia Water Southeast

Area of Supply

To Be Metered

Metered

Control Area

50% Metered

Lydd Pilot Area

100% Metered

zonal metering process
Zonal Metering Process
  • Original Letter
    • Background to meter programme
    • Work to be carried out
    • Bogus caller awareness
  • Survey
    • Where / how to fit meter
  • Meter Installation
    • Highway / Garden / Internal installation
    • Card and water efficiency advice left with customer
  • VWSE Billing database updated & Southern Water informed
  • 6 monthly meter reading – 3 monthly billing cycle
other trials deferred metering
Other Trials – Deferred Metering
  • Deferred Metering
  • 1,000 unmeasured properties are to be part of a Deferred Metering trial

– Capel le Ferne, Hawkinge, Ringwould and Kingsdown

  • Meters will be fitted as normal and manually read every three months
  • Customers will remain on unmeasured charges until April 2012
  • Customers will not receive any water efficiency leaflets/guidance
  • Customers will not be advised of their quarterly consumptions until one year after the meters are installed
  • Customers can read their own meters and Opt to change to measured charges at any time if they wish
  • After one year customers will be advised of their water use over the previous four quarters
  • No retrospective discounts will be given if customers then choose to Opt
  • The difference will inform the change in consumption on transfer from unmeasured charges to metered charging.
customer protection
Customer protection
  • Abnormal water use:
    • Free 1st supply pipe repair *
    • Subsidised supply pipe replacement *
    • Domestic leakage allowance *

* Conditions apply

  • Customer hardship cases:
    • Veolia Water Trust - by Charis Grants
    • WaterSure – formerly Vulnerable Customer Tariff
ad