1 / 2

Ftlrs

FTLRS- Campaigns, upgrade and future. Ftlrs. M.Pierron ¹ , F.Pierron¹, M.Furia¹, JM.Torre¹, P.Bonnefond¹ P.Exertier¹, E.Samain¹ and Laser Staff¹ R.Coleman ² , C.Watson ² , P.Tregoning ³ , J.Zhang ³. Observatoire de la Côte d'Azur, France

ida
Download Presentation

Ftlrs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FTLRS- Campaigns, upgrade and future Ftlrs M.Pierron¹, F.Pierron¹, M.Furia¹, JM.Torre¹, P.Bonnefond¹ P.Exertier¹, E.Samain¹ and Laser Staff¹ R.Coleman², C.Watson² , P.Tregoning³, J.Zhang³ • Observatoire de la Côte d'Azur, France • ²University of Tasmania, Hobart, Australia, ³ The Australian National University, Canberra 1.Calibration/validation project on Jason1 satellite in Tasmania, a collaboration between University of Tasmania at Hobart and Observatoire de la Côte d’Azur in France • 5 months(2007/2008) in Burnie for permanent observations on site • Scientific program decided jointly by both institutes • -OCA contribution : Technological issue for Ftlrs & engineers • -Australian contribution: Site installation and missions funding • Analysis in the results in progress.. Burnie is the only calibration site in the southern hemisphere

  2. Real Time System: chronometry part At firing interrupt Internal Timer Read internal timer External PC Stanford chronometer 2 Dassault Timer TCPIP link • Read Stanford Chronometer • Read the 2 Dassault timers • (firing/return events) First T2L2 results : Ftlrs at Grasse & Ajaccio with MEO at Grasse July 2008 on Jason2 some days after launch Timers server interface At gate interrupt Ftlrs Upgrade in Summer 2008:Dassaults Event timer installation & T2L2 • Our choice has been to conserve the 2 timing systems very useful for engineering & failure • internal timer and Stanford chronometer • Two Dassault timers (start and stop channels)

More Related