iFluidsEngineering
Uploaded by
13 SLIDES
137 VIEWS
120LIKES

Laboratory Design

DESCRIPTION

Our team operating Laboratory Design are with diverse and vast experience and have gained expertise in understanding the operational and user requirements of applications. This ensures that our detailed engineering, workflow and functionality design define and control all the related activities of any laboratory process for our clients<br>For more >> www.ifluids.com<br><br>

1 / 13

Download Presentation

Laboratory Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Laboratory Design Our team operating Laboratory Design are with diverse and vast experience and have gained expertise in understanding the operational and user requirements of applications. This ensures that our detailed engineering, workflow and functionality design define and control all the related activities of any laboratory process for our clients •Planning, Detail Design & Engineering oPreliminary design and engineering study oValue engineering oReview and Evaluation of workflow oLaboratory Design Layout and Furniture oDrawing (Layout, Schematic diagram, elevation, and 3D views) oBIM Modelling o3D modelling and Walkthrough’s. oFresh Air Intake oCooling and Air Conditioning (HVAC) oAir Extraction & Ventilation

  2. oCompressed Gas Piping oUtility distribution planning oLaboratory Safety (Gas detection, safety shower, etc.) oAs-built drawings and Technical submissions •Specialist Project Management Services oProject Scheduling oProcurement oBring in Specialists, as needed. •Construction Support •Testing & Commissioning Support •Safety Audits •LIMS Consulting & Integration •Specialised and Customized Support oRelocation oBrownfield Modification We can support from concept to detail engineering to execution to completion, by working with all stakeholders. Current trends in 3D visualization tools and

  3. tight project control, we are able to efficiently plan the project and deliver on time irrespective of our tight deadlines. A critical component for success is thorough understanding of Good Laboratory design practices and International Standards applicable to laboratory infrastructure including SHELL DEP, EN, ASHRAE, ASTM, OSHA and UL. We are known for our efficiency, optimization and multi-disciplinary capabilities. Below are some of the areas that we can support on. Past Completed Projects

  4. Figure.1 Software with iFluids If you have decided to do Quantitative Risk Assessment (QRA) through DNV PHAST & SAFETI, you might be interested to get it from iFluids Engineering. iFluids Engineering is a Specialist Engineering Consultancy which specializes in various Risk & Safety Studies. It is also has genuine licensed software for major requirements in Oil & Gas and Petrochemical Industry. These include software from DNV PHAST, Pipenet, Olga, MAROS and a whole lot more as mentioned in Figure.1 Software with iFluids. Whenever you find yourself choosing between services provider for various specialized, just remember that using latest software helps in a reliable and safe operations! And always verify the same directly. Learn more about Safeti software Contact our experts to learn more about DNV Safeti software and the services that iFluids Engineering provides

  5. Figure.2 iFluids Process Safety Consulting Services

  6. Figure.3 iFluids Loss Prevention/Fire Safety Consulting Services Figure.4 iFluids Functional Safety Consulting Services

  7. Figure.5 iFluids Specialized Studies Disclaimer Disclaimer: All information and content contained in this article are provided solely for general information and reference purposes. TM information, Images & any copyrighted material inadvertently published or depicted belong to rightful owner and iFluids doesn’t claim to be its own. To know more or to send inquiry, Please call +91 8939 530143 WhatsApp +91 90254 00631 Email us: info@iFluids.com Or Click here to submit your inquiry online

More Related